Locations of Work
ArchitectureStructuralElectrical
Floor 224p · 1 filing · 20 docs
Floor 18p · 1 filing · 20 docs
Cellar25p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/31/2021$2.1M—— → —$847/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HESHAM ELSHAMY PE203/21/2025
AL FFRED ARCHITECTURE PLLC408/16/2024
RAHMAN CONSULTING406/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MISTER EXPEDITER803/21/2026
DCS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEDARS CONSTRUCTION CORPGeneral Contractor1607/08/2026
GREGG NY PLUMBING, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449203/21/2025
M. INT'L ENGINEERING PLLC3129608/16/2024
Building Lifecycle
All (92)Filed (10)Permit Issued (9)Inspection (4)Objection (39)Special Inspection (30)
04/14/2025
Objection raised — Other
04/04/2025
Objection resolved — Addressed
03/24/2025
Objection raised — Other
03/21/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
Enlargement to existing single family residence. Reconstruction of wood frame to metal frame.
B00630278-P5
11/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
MOHAMED MAHMOUD
11/07/2024
Special inspection requirement — Fenestration air leakage
11/07/2024
Special inspection requirement — Fenestration areas
11/07/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
11/07/2024
Special inspection requirement — Air barrier - visual inspection
11/07/2024
Special inspection requirement — Air barrier — testing
11/07/2024
Special inspection requirement — Insulation placement and R values
11/07/2024
Special inspection requirement — Permanent certificate
10/15/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/08/2024
Permit issued — Plumbing
B00630278-S1-PL
08/16/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
Enlargement to existing single family residence. Reconstruction of wood frame to metal frame.
B00630278-P4
08/14/2024
Special inspection requirement — Energy Code Compliance Inspections
NANIK MASSAND
08/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
NANIK MASSAND
08/14/2024
Special inspection requirement — HVAC-R and service water heating equipment
NANIK MASSAND
08/14/2024
Special inspection requirement — HVAC-R and service water heating system controls
NANIK MASSAND
08/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
NANIK MASSAND
05/02/2024
Permit issued — General Construction
B00630278-I1-GC
06/16/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/01/2023
Permit issued — Plumbing
B00630278-S1-PL
03/14/2023
Objection resolved — Addressed
01/17/2023
Permit issued — Construction Fence
B00630278-S2-FN
10/27/2022
Permit issued — General Construction
B00630278-I1-GC
09/07/2022
Objection raised — Zoning
09/06/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
Enlargement to existing single family residence. Reconstruction of wood frame to metal frame.
B00630278-P3
09/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/01/2022
Special inspection requirement — Energy Code Compliance Inspections
09/01/2022
Special inspection requirement — HVAC-R and service water heating equipment
09/01/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
09/01/2022
Special inspection requirement — HVAC-R and service water heating system controls
08/25/2022
Permit issued — Foundation
B00630278-S4-FO
08/25/2022
Permit issued — Support of Excavation
B00630278-S5-SE
08/08/2022
Objection resolved — Addressed
08/08/2022
Special inspection requirement — Concrete - Cast-In-Place
NANIK MASSAND
07/27/2022
Objection resolved — Addressed
07/27/2022
Objection resolved — Addressed
07/27/2022
Special inspection requirement — Protection of exposed foundation insulation
NANIK MASSAND
07/27/2022
Special inspection requirement — Insulation placement and R values
NANIK MASSAND
07/21/2022
Objection raised — Inspections
07/21/2022
Objection raised — Admin
07/21/2022
Objection raised — Energy
07/21/2022
Objection resolved — Addressed
07/13/2022
Objection raised — Structural
07/13/2022
Objection raised — Structural
07/13/2022
Objection resolved — Addressed
07/13/2022
Objection raised — Structural
07/13/2022
Objection resolved — Addressed
07/13/2022
Objection raised — Scope
07/13/2022
Objection resolved — Addressed
07/05/2022
Objection resolved — Addressed
06/14/2022
Special inspection requirement — Structural Cold-Formed Steel
06/14/2022
Special inspection requirement — Final
Alfred Mierzejewski
06/14/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
NANIK MASSAND
06/14/2022
Special inspection requirement — Structural Steel - Details
06/10/2022
Filed — ALT-CO - New Building with Existing Elements to Remain
Enlargement to existing single family residence. Reconstruction of wood frame to metal frame.
B00630278-P2
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC10/08/2024
DOB NOWGeneral ConstructionPermit IssuedCEDARS CONSTRUCTION GROUP05/02/2024
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC06/01/2023
DOB NOWConstruction FencePermit IssuedCEDARS CONSTRUCTION GROUP01/17/2023
DOB NOWGeneral ConstructionPermit IssuedCEDARS CONSTRUCTION GROUP10/27/2022
DOB NOWFoundationPermit IssuedCEDARS CONSTRUCTION GROUP08/25/2022
DOB NOWSupport of ExcavationPermit IssuedCEDARS CONSTRUCTION GROUP08/25/2022
DOB NOWStructuralPermit IssuedCEDARS CONSTRUCTION GROUP06/02/2022
DOB NOWConstruction FencePermit IssuedCEDARS CONSTRUCTION GROUP04/05/2022
1 project · most recent 03/21/2025
Gas Water/Sanitary
FiledStatusContractorScope
03/21/2025Signed-offSUPER MAX CONSULTING INCGas, Water/Sanitary
1 project · most recent 05/03/2023
General Wiring
FiledStatusContractorScope
05/03/2023Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
1 project · most recent 03/21/2025
Steel Wood
FiledStatusContractorScope
03/21/2025Signed-offSUPER MAX CONSULTING INCSteel, Wood
1 project · most recent 03/21/2025
Fence
FiledStatusContractorScope
03/21/2025Signed-offSUPER MAX CONSULTING INCFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/15/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/16/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/16/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
11/07/2024Structural Stability – Alterations of existing buildingsMOHAMED MAHMOUDspecial
11/07/2024Fenestration air leakage—energy_progress
11/07/2024Fenestration areas—energy_progress
11/07/2024Fenestration and door U-factor and product ratings—energy_progress
11/07/2024Air barrier - visual inspection—energy_progress
11/07/2024Air barrier — testing —energy_progress
11/07/2024Insulation placement and R values—energy_progress
11/07/2024Permanent certificate—energy_progress
08/14/2024Energy Code Compliance InspectionsNANIK MASSANDprogress
08/14/2024HVAC-R and service water piping design and insulationNANIK MASSANDenergy_progress
08/14/2024HVAC-R and service water heating equipmentNANIK MASSANDenergy_progress
08/14/2024HVAC-R and service water heating system controlsNANIK MASSANDenergy_progress
08/14/2024Fire-Resistant Penetrations and JointsNANIK MASSANDspecial
09/01/2022Fire-Resistant Penetrations and Joints—special
09/01/2022Energy Code Compliance Inspections—progress
09/01/2022HVAC-R and service water heating equipment—energy_progress
09/01/2022HVAC-R and service water piping design and insulation—energy_progress
09/01/2022HVAC-R and service water heating system controls—energy_progress
08/08/2022Concrete - Cast-In-PlaceNANIK MASSANDspecial
07/27/2022Protection of exposed foundation insulationNANIK MASSANDenergy_progress
07/27/2022Insulation placement and R valuesNANIK MASSANDenergy_progress
06/14/2022Structural Cold-Formed Steel—special
06/14/2022FinalAlfred Mierzejewskiprogress
06/14/2022Structural Stability – Alterations of existing buildingsNANIK MASSANDspecial
06/14/2022Structural Steel - Details—special
Latest 25 of 37.
▾Documents — 65 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/30/2026B00630278-S1Request digital key ↗
08/30/2026B00630278-P2Request digital key ↗
08/30/2026B00630278-S2Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00630278-I1Open ↗
08/13/2026B00630278-P5Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00630278-I1Open ↗
08/13/2026B00630278-P5Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/30/2026B00630278-P4Open ↗
08/30/2026B00630278-P5Open ↗
08/30/2026B00630278-S3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026B00630278-S4Open ↗
09/02/2026B00630278-S4Open ↗
09/01/2026B00630278-P5Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026B00630278-S4Open ↗
09/02/2026B00630278-S4Open ↗
09/02/2026B00630278-S4Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00630278-I1Open ↗
08/13/2026B00630278-P5Open ↗
▸Safety & Tenant Protection1
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00630278-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/30/2026B00630278-P4Open ↗
08/30/2026B00630278-S1Open ↗
08/30/2026B00630278-P2Open ↗
Showing 3 of 10 on file for this type
▸Inspections & Test Reports6
▸DOB NOWTR4 Plot Diagram2
08/13/2026B00630278-S4Open ↗
08/13/2026B00630278-S5Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00630278-S4Open ↗
08/13/2026B00630278-S5Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026B00630278-S5Open ↗
08/13/2026B00630278-S4Open ↗
▸Other Documents8
▸DOB NOWProperty Ownership Certification3
08/30/2026B00630278-P2Open ↗
08/15/2026B00630278-P5Open ↗
08/14/2026B00630278-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00630278-I1Open ↗
08/13/2026B00630278-P5Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00630278-S3Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00630278-S5Open ↗
▸DOB NOWSite Survey: Initial1