← Back
Walk-up apt, over six families with stores
1425 PLAZA DRIVE
BRONX · Mount Eden-Claremont (West) · BIN 2008309
💬 Discuss this project
1927Year Built
5Stories
C7Building Class
R8AZoning
37,700 sfGross Floor Area
39Units
LL97 CoveredRent Stabilized33 Open Violations 32 unresolved · 1 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: 1441 MACOMBS REALTYCORP · 9,017 sf lot · 4.18 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1441 MACOMBS REALTYCORP203/22/2026
OWNER OF 1425 MACOMBS RD103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENTHINK ENGINEERS LLC308/09/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROFESSIONAL LINE CORPGeneral Contractor507/08/2026
RICHARD NEUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENTHINK ENGINEERS LLC6247107/28/2022
Building Lifecycle
All (70)Filed (3)Permit Issued (3)Signed Off (1)Violation (60)Special Inspection (3)
06/11/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/11/2026
Violation issued (ECB, open)
Construction
06/10/2026
Violation issued (HPD, open)
B
06/10/2026
Violation issued (HPD, open)
B
06/10/2026
Violation issued (HPD, open)
B
12/01/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/05/2024
Violation issued (HPD, open)
C
07/05/2024
Violation issued (HPD, open)
B
07/05/2024
Violation issued (HPD, open)
B
07/05/2024
Violation issued (HPD, open)
C
07/05/2024
Violation issued (HPD, open)
B
07/05/2024
Violation issued (HPD, open)
B
07/05/2024
Violation issued (HPD, open)
B
07/05/2024
Violation issued (HPD, closed)
C
07/05/2024
Violation issued (HPD, closed)
A
07/05/2024
Violation issued (HPD, closed)
A
07/05/2024
Violation issued (HPD, closed)
A
07/05/2024
Violation issued (HPD, closed)
C
07/05/2024
Violation issued (HPD, closed)
C
07/05/2024
Violation issued (HPD, closed)
A
07/05/2024
Violation issued (HPD, open)
C
07/05/2024
Violation issued (HPD, open)
B
07/05/2024
Violation issued (HPD, closed)
C
02/09/2024
Violation issued (HPD, open)
B
02/09/2024
Violation issued (HPD, open)
B
02/09/2024
Violation issued (HPD, open)
B
02/09/2024
Violation issued (HPD, open)
A
02/09/2024
Violation issued (HPD, closed)
A
02/09/2024
Violation issued (HPD, open)
B
02/09/2024
Violation issued (HPD, open)
B
01/02/2024
Violation issued (HPD, closed)
B
01/02/2024
Violation issued (HPD, closed)
B
01/02/2024
Violation issued (HPD, closed)
C
01/02/2024
Violation issued (HPD, closed)
B
01/02/2024
Violation issued (HPD, closed)
A
01/02/2024
Violation issued (HPD, closed)
A
01/02/2024
Violation issued (HPD, closed)
B
01/02/2024
Violation issued (HPD, closed)
B
12/09/2023
Violation issued (HPD, closed)
C
12/08/2023
Violation issued (HPD, open)
B
12/08/2023
Violation issued (HPD, open)
B
12/08/2023
Violation issued (HPD, closed)
C
09/22/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X00765114-I1
08/11/2022
Permit issued — Supported Scaffold
X00789382-I1-SF
08/09/2022
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
X00789382-I1
08/01/2022
Permit issued — General Construction
X00774667-I1-GC
07/28/2022
Filed — Alteration
PARAPET WALL REPLACEMENT WORK AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00774667-I1
07/14/2022
Special inspection requirement — Masonry
Sunil Saigal
07/14/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
Sunil Saigal
07/14/2022
Special inspection requirement — Final
Sunil Saigal
06/28/2022
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300PSF.
X00765114-I1
06/28/2022
Permit issued — Sidewalk Shed
X00765114-I1-SH
06/26/2022
Violation issued (HPD, closed)
C
06/26/2022
Violation issued (HPD, closed)
B
06/26/2022
Violation issued (HPD, closed)
B
06/26/2022
Violation issued (HPD, closed)
C
06/26/2022
Violation issued (HPD, closed)
A
06/26/2022
Violation issued (HPD, closed)
B
06/26/2022
Violation issued (HPD, closed)
A
06/26/2022
Violation issued (HPD, closed)
A
Latest 60 of 70 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedPROFESSIONAL LINE CORP08/11/2022
DOB NOWGeneral ConstructionPermit IssuedPROFESSIONAL LINE CORP08/01/2022
DOB NOWSidewalk ShedSigned-offPROFESSIONAL LINE CORP06/28/2022
BISEQISSUEDREPUBLIC SCAFFOLD CORP05/17/2012
BISOTISSUEDEMF CONTRACTING CORP06/11/2009
BISEQISSUEDEMF CONTRACTING CORP06/11/2009
BISPLISSUEDCAPE PLUMBING INC09/12/2005
BISPLISSUEDCAPE PLUMBING INC08/19/2005
BISOTISSUEDALL TECHNICAL ART07/20/2005
BISFPISSUEDMASTER FIRE SYSTEMS, INC05/11/2005
BISFBISSUEDPALLADINO HEATING SVC INC.06/30/2003
BISPLISSUEDMISTY PLUMBING10/12/1990
BISFPISSUEDMASTER FIRE PREVENTION SYSTEMS09/27/1990
1 project · most recent 06/28/2022
FiledStatusContractorScope
06/28/2022Permit IssuedRICHARD NEU—
1 project · most recent 08/09/2022
Scaffold
FiledStatusContractorScope
08/09/2022Permit IssuedPROFESSIONAL LINE CORPScaffold
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
07/14/2022MasonrySunil Saigalspecial
07/14/2022Structural Stability – Alterations of existing buildingsSunil Saigalspecial
07/14/2022FinalSunil Saigalprogress
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026X00765114-I1Request digital key ↗
08/24/2026X00774667-I1Request digital key ↗
08/24/2026X00789382-I1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
05/17/2012220203189Open ↗
06/09/2009220010903Open ↗
▸BISWORK PERMIT APPLICATION2
05/17/2012220203189Open ↗
06/11/2009220010903Open ↗
▸Seals & Professional Certifications13
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
05/17/2012220203189Open ↗
06/09/2009220010903Open ↗
01/06/2010220010903Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026X00765114-I1Open ↗
08/24/2026X00774667-I1Open ↗
08/24/2026X00789382-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/17/2012220203189Open ↗
06/09/2009220010903Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
05/17/2012220203189Open ↗
06/09/2009220010903Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026X00774667-I1Open ↗
08/24/2026X00774667-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/24/2026X00774667-I1Open ↗
▸Environmental & Asbestos2
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/09/2009220010903Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026X00774667-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026X00774667-I1Open ↗
08/13/2026X00765114-I1Open ↗
08/13/2026X00789382-I1Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/06/2010220010903Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
05/17/2012220203189Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/06/2010220010903Open ↗
06/09/2009220010903Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
05/17/2012220203189Open ↗
06/09/2009220010903Open ↗