← Back
Elevator apt, semi-fireproof with stores
1425 TOWNSEND AVENUE
BRONX · Mount Eden-Claremont (West) · BIN 2008094
💬 Discuss this project
1939Year Built
6Stories
D7Building Class
R8Zoning
—Gross Floor Area
51Units
74 Open Violations 70 unresolved · 4 paperwork only ▸FISP: SWARMP
Elevator apt, semi-fireproof with stores · Owner of record: 1425 HOLDING · 4 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1425 HOLDING2903/22/2026
JOEL YASGUR ASSOC.103/22/2026
1425 TOWNSEND AVE.103/22/2026
YASGUR REALTY GROUP103/22/2026
HOLDING203/21/2026
UNITED KING CONSTRUCTION103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC207/01/2024
MJE PROFESSIONAL SERVICES104/10/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FAIZ AHMEDGeneral Contractor203/21/2026
FAIZ AHMEDGeneral Contractor207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BITOPI CONSULTANTS LLC7036107/01/2024
Building Lifecycle
All (73)Filed (3)Permit Issued (2)Signed Off (1)Facade (FISP) (3)Violation (60)Inspection (1)Special Inspection (3)
08/11/2026
Violation issued (HPD, open)
A
08/11/2026
Violation issued (HPD, open)
B
08/11/2026
Violation issued (HPD, open)
C
08/11/2026
Violation issued (HPD, open)
B
08/11/2026
Violation issued (HPD, open)
B
08/11/2026
Violation issued (HPD, open)
B
08/11/2026
Violation issued (HPD, open)
C
12/31/2025
Violation issued (HPD, open)
C
12/17/2025
Signed off — Alteration
BRICK CRACK REPAIR, SILL CAULKING AND LINTEL CAULKING WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY.
X01051514-I1
12/12/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
11/12/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/17/2025
Violation issued (HPD, open)
B
08/17/2025
Violation issued (HPD, open)
B
08/17/2025
Violation issued (HPD, open)
B
08/17/2025
Violation issued (HPD, open)
B
08/17/2025
Violation issued (HPD, open)
C
08/17/2025
Violation issued (HPD, open)
B
07/30/2025
Violation issued (HPD, open)
C
06/05/2025
Violation issued (HPD, closed)
A
02/28/2025
Violation issued (HPD, closed)
B
02/28/2025
Violation issued (HPD, closed)
B
02/28/2025
Violation issued (HPD, closed)
C
02/28/2025
Violation issued (HPD, closed)
B
02/20/2025
Cycle 9 facade report submitted
02/20/2025
Cycle 9 facade inspection completed
02/20/2025
Cycle 9 facade report signed — SWARMP
02/19/2025
Violation issued (HPD, closed)
A
02/19/2025
Violation issued (HPD, open)
C
02/19/2025
Violation issued (HPD, closed)
B
02/19/2025
Violation issued (HPD, closed)
B
02/19/2025
Violation issued (HPD, closed)
B
12/23/2024
Violation issued (HPD, closed)
C
12/23/2024
Violation issued (HPD, closed)
C
12/15/2024
Violation issued (HPD, closed)
C
12/15/2024
Violation issued (HPD, closed)
C
12/15/2024
Violation issued (HPD, closed)
C
12/15/2024
Violation issued (HPD, closed)
C
11/30/2024
Violation issued (HPD, closed)
C
11/29/2024
Violation issued (HPD, open)
C
11/29/2024
Violation issued (HPD, open)
C
11/15/2024
Violation issued (HPD, closed)
A
11/15/2024
Violation issued (HPD, closed)
C
11/15/2024
Violation issued (HPD, closed)
A
11/15/2024
Violation issued (HPD, closed)
C
11/15/2024
Violation issued (HPD, closed)
B
11/15/2024
Violation issued (HPD, closed)
C
11/06/2024
Violation issued (HPD, closed)
C
11/06/2024
Violation issued (HPD, closed)
C
11/06/2024
Violation issued (HPD, closed)
B
11/06/2024
Violation issued (HPD, closed)
B
11/06/2024
Violation issued (HPD, closed)
A
10/29/2024
Violation issued (HPD, closed)
A
10/29/2024
Violation issued (HPD, open)
A
10/29/2024
Violation issued (HPD, open)
A
10/29/2024
Violation issued (HPD, open)
B
10/29/2024
Violation issued (HPD, open)
B
10/29/2024
Violation issued (HPD, open)
A
10/29/2024
Violation issued (HPD, open)
A
10/25/2024
Violation issued (HPD, closed)
B
08/22/2024
Permit issued — General Construction
X01051514-I1-GC
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFAIZ AHMED08/22/2024
DOB NOWSupported ScaffoldPermit IssuedFAIZ AHMED06/18/2024
BISEQISSUEDFOUR STAR MECH. INC.04/24/2006
BISEQISSUEDGHOTRA GENERAL CONSTRUCTION CORP01/12/2006
BISOTISSUEDGHOTRA GENERAL CONSTRUCTION CORP01/12/2006
BISPLISSUEDNATIONWIDE MECHANICAL INC11/16/2005
BISOTISSUEDFOUR STAR MECHANICAL11/16/2005
BISPLISSUEDSEAVIEW PLUMBING, INC.11/04/2005
BISFSISSUEDAMBASSADOR FURL & OB CORP08/05/2005
1 project · most recent 06/17/2024
Scaffold
FiledStatusContractorScope
06/17/2024Permit IssuedFAIZ AHMEDScaffold
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
12/12/2025Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
05/15/2024MasonryKAMRUL AHSANspecial
05/15/2024Structural Stability – Alterations of existing buildingsKAMRUL AHSANspecial
05/15/2024Tenant Protection Plan ComplianceKAMRUL AHSANspecial
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/21/2026X01033577-I1Request digital key ↗
08/21/2026X01052894-I1Request digital key ↗
08/21/2026X01051514-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/21/2026X01033577-I1Open ↗
08/13/2026X01052894-I1Open ↗
08/13/2026X01051514-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026X01051514-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026X01051514-I1Open ↗