← Back
All parking garages
I.S. 364 Gateway
1426 FREEPORT LOOP · BIN 3098295
💬 Discuss this project
1973Year Built
4Stories
G1Building Class
R5Zoning
203,272 sfGross Floor Area
1Units
LL97 Covered5 Open Violations ▸FDNY Report ↗
All parking garages · Owner of record: BSC HOUSING COMPANY, INC. · 81,900 sf lot · 2.48 FAR built · Flood zone X500
Locations of Work
Structural
Roof3p · 1 filing · 12 docs
5 jobs · most recent 11/10/2022
General Wiring
FiledStatusContractorScope
11/10/2022CompleteCHARAN ELEC'L ENTERP'S IN—
04/19/2021CompleteM&T ELECTRICAL LLCGeneral Wiring
08/18/2020CompleteM&T ELECTRICAL LLCGeneral Wiring
06/21/2019CompleteCHARAN ELEC'L ENTERP'S IN—
04/25/2019CompleteANCO ELECTL CONTCTNG INCGeneral Wiring
1 job · most recent 08/05/2026
Concrete
FiledStatusContractorScope
08/05/2026Signed-offSTRUCTURAL PRESERV SYSTEMConcrete
Building Lifecycle
All (83)Filed (8)Permit Issued (7)Signed Off (3)Violation (43)Inspection (5)Special Inspection (17)
08/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAURICIO ANDRADE
08/07/2026
Special inspection requirement — Final
MAURICIO ANDRADE
08/07/2026
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
08/07/2026
Special inspection requirement — Concrete - Cast-In-Place
MAURICIO ANDRADE
08/05/2026
Filed — Alteration
HEREWITH FILING LOCALIZED CONCRETE REPAIR OF SLABS, COLUMNS AND WALLS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01100280-P1
07/24/2026
Special inspection requirement — Concrete - Cast-In-Place
MAURICIO ANDRADE
07/24/2026
Special inspection requirement — Final
MAURICIO ANDRADE
07/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MAURICIO ANDRADE
07/24/2026
Special inspection requirement — Post-installed Anchors
MAURICIO ANDRADE
03/04/2026
Permit issued — Structural
B01100280-I1-ST
03/03/2025
Permit issued — Structural
B01100280-I1-ST
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/30/2024
Filed — Alteration
HEREWITH FILING LOCALIZED CONCRETE REPAIR OF SLABS, COLUMNS AND WALLS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01100280-I1
08/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/01/2024
Violation issued (FDNY_ORDER, closed)
05/29/2024
Signed off — Alteration
Installation of (4) new gas boilers and their prefabricated enclosure.
B00388709-I1
05/29/2024
Violation issued (FDNY_NOV, closed)
05/21/2024
Signed off — Alteration
Installation of new gas plumbing piping for related new boilers to be installed.
B00388700-I1
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2024
Violation issued (ECB, closed)
Construction
05/03/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/06/2023
Violation issued (ECB, closed)
Construction
12/01/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/26/2022
Violation issued (FDNY_ORDER, closed)
02/03/2022
Violation issued (ECB, closed)
Construction
02/03/2022
Violation issued (ECB, closed)
Construction
02/03/2022
Violation issued (ECB, closed)
Construction
12/22/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/17/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/14/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/08/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/08/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/01/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/15/2021
Permit issued — Plumbing
B00388700-I1-PL
10/19/2021
Filed — Alteration
Installation of new gas plumbing piping for related new boilers to be installed.
B00388700-P1
09/22/2021
Filed — Alteration
Installation of (4) new gas boilers and their prefabricated enclosure.
B00388709-P1
09/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MAURICIO ANDRADE
07/15/2021
Permit issued — Boiler Equipment
B00388709-I1-BE
06/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/29/2021
Violation issued (ECB, closed)
Construction
03/29/2021
Violation issued (ECB, closed)
Construction
03/29/2021
Violation issued (ECB, closed)
Construction
03/29/2021
Violation issued (ECB, closed)
Construction
03/01/2021
Permit issued — Boiler Equipment
B00388709-I1-BE
12/02/2020
Filed — Alteration
Installation of (4) new gas boilers and their prefabricated enclosure.
B00388709-I1
11/05/2020
Permit issued — Plumbing
B00388700-I1-PL
09/16/2020
Filed — Alteration
Installation of new gas plumbing piping for related new boilers to be installed.
B00388700-I1
08/07/2020
Signed off — Alteration
Post Approval Amendment being filed to revise plans to show corrected boiler pad dimensions.
B00343162-I1
06/18/2020
Filed — Alteration
Post Approval Amendment being filed to revise plans to show corrected boiler pad dimensions.
B00343162-P1
06/18/2020
Special inspection requirement — Concrete - Cast-In-Place
MAURICIO ANDRADE
06/18/2020
Special inspection requirement — Final
MAURICIO ANDRADE
06/18/2020
Special inspection requirement — Subgrade Inspections
MAURICIO ANDRADE
06/18/2020
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
MAURICIO ANDRADE
06/08/2020
Special inspection requirement — Final
MAURICIO ANDRADE
Latest 60 of 83 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BSC HOUSING COMPANY303/22/2026
DEPARTMENT OF EDUCATION503/22/2026
DOE IS 364 040203/22/2026
DOE 040203/22/2026
DEPT OF EDUCATION IS 364103/22/2026
DOE IS 364103/22/2026
STARRET CITY ASSOCIATE303/22/2026
IS 364 DOE103/22/2026
BOE CITY OF NY103/21/2026
NYCDOE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SIMPSON GUMPERTZ & HEGER208/05/2026
WSP USA410/19/2021
HIRANI ENGINEERING & SURVEYING P.C206/18/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
METROPOLIS GROUP INC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STRUCTURAL PRESERV SYSTEMGeneral Contractor207/08/2026
ACCURATE MECHANICAL INCPlumbing207/08/2026
FRESH MEADOW MECH PLBG LLPlumbing207/08/2026
FRANCIS RICHARDSElectrical103/21/2026
LUPINSKI, MAREKElectrical103/21/2026
BETANCOURT, JOHNElectrical103/21/2026
SMITH, STEPHENElectrical103/21/2026
O'LEARY CONSTRUCTION INCGeneral Contractor107/08/2026
SCHWERDTFEGER, MARCUSElectrical103/21/2026
CHAYUT, ALLENElectrical103/21/2026
FLORENTINE ARTISTIC IRONElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI AGENCY INC.254608/05/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offSTRUCTURAL PRESERV SYSTEM03/04/2026
DOB NOWStructuralSigned-offSTRUCTURAL PRESERV SYSTEM03/03/2025
DOB NOWPlumbingSigned-offANTHONY DISABATO11/15/2021
DOB NOWBoiler EquipmentSigned-offMICHAEL BURNS P&H CORP07/15/2021
DOB NOWBoiler EquipmentSigned-offMICHAEL BURNS P&H CORP03/01/2021
DOB NOWPlumbingSigned-offANTHONY DISABATO11/05/2020
DOB NOWStructuralSigned-offO'LEARY CONSTRUCTION INC05/22/2020
BISOTISSUEDGILBANE BUILDING COMPANY07/20/2018
BISOTISSUEDTECHNICAL CONSTR SERV.INC05/30/2014
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
12/22/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/17/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/14/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/08/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/08/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
08/07/2026Structural Stability – Alterations of existing buildingsMAURICIO ANDRADEspecial
08/07/2026FinalMAURICIO ANDRADEprogress
08/07/2026Post-installed AnchorsMAURICIO ANDRADEspecial
08/07/2026Concrete - Cast-In-PlaceMAURICIO ANDRADEspecial
07/24/2026Concrete - Cast-In-PlaceMAURICIO ANDRADEspecial
07/24/2026FinalMAURICIO ANDRADEprogress
07/24/2026Structural Stability – Alterations of existing buildingsMAURICIO ANDRADEspecial
07/24/2026Post-installed AnchorsMAURICIO ANDRADEspecial
09/22/2021Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
06/18/2020Concrete - Cast-In-PlaceMAURICIO ANDRADEspecial
06/18/2020FinalMAURICIO ANDRADEprogress
06/18/2020Subgrade InspectionsMAURICIO ANDRADEspecial
06/18/2020Subsurface Conditions – Fill Placement & In-Place DensityMAURICIO ANDRADEspecial
06/08/2020FinalMAURICIO ANDRADEprogress
06/08/2020Subsurface Conditions – Fill Placement & In-Place DensityMAURICIO ANDRADEspecial
06/08/2020Subgrade InspectionsMAURICIO ANDRADEspecial
06/08/2020Concrete - Cast-In-PlaceMAURICIO ANDRADEspecial
▾Documents — 84 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch - Boiler Equipment2
09/02/2026B00388709-I1Request digital key ↗
08/15/2026B00388709-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00388700-I1Request digital key ↗
08/15/2026B00388700-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
09/02/2026B00343162-I1Request digital key ↗
08/15/2026B00343162-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/24/2026B01100280-I1Request digital key ↗
08/24/2026B01100280-P1Request digital key ↗
▸Applications & Permits4
▸BISPLAN / WORK APPROVAL APPLICATION2
07/09/2018321798667Open ↗
07/11/2014320990344Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/30/2020321798667Open ↗
▸BISWORK PERMIT APPLICATION1
07/20/2018321798667Open ↗
▸Seals & Professional Certifications30
▸DOB NOWSpecial Inspector Seal & Signature9
09/07/2026B00343162-P1Open ↗
09/07/2026B00343162-P1Open ↗
09/07/2026B00343162-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026B01100280-P1Open ↗
08/13/2026B00343162-P1Open ↗
08/13/2026B01100280-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
04/25/2020321798667Open ↗
07/09/2018321798667Open ↗
07/09/2018321798667Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/07/2026B00343162-P1Open ↗
09/05/2026B01100280-P1Open ↗
08/28/2026B00343162-I1Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/09/2018321798667Open ↗
07/11/2014320990344Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/09/2018321798667Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
07/11/2014320990344Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026B01100280-P1Open ↗
08/13/2026B00343162-I1Open ↗
08/13/2026B00343162-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/09/2018321798667Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
07/11/2014320990344Open ↗
▸Energy Compliance3
▸BISAS-BUILT ENERGY ANALYSIS1
04/30/2020321798667Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
07/09/2018321798667Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00388709-I1Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER6
08/15/2018321798667Open ↗
07/20/2018321798667Open ↗
05/01/2017320990344Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
08/15/2018321798667Open ↗
07/20/2018321798667Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
04/28/2017320990344Open ↗
▸BISTR2: CONCRETE TEST CYLINDERS TECHNICAL REPORT1
05/01/2017320990344Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/30/2020321798667Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/24/2026B01100280-P1Open ↗
08/13/2026B00343162-P1Open ↗
08/13/2026B00388700-P1Open ↗
Showing 3 of 8 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/30/2020321798667Open ↗
05/01/2017320990344Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
08/15/2018321798667Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
07/11/2014320990344Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
04/30/2020321798667Open ↗
07/09/2018321798667Open ↗
05/01/2017320990344Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION2
04/25/2020321798667Open ↗
01/26/2015320990344Open ↗
▸BISEFILING COVER SHEET2
07/03/2018321798667Open ↗
07/11/2014320990344Open ↗
▸BISBOROUGH INTAKE FORM1
04/25/2020321798667Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/01/2017320990344Open ↗