← Back
Over six families without stores
1429 EAST GUN HILL ROAD
BRONX · Eastchester-Edenwald-Baychester · BIN 2130628
💬 Discuss this project
2022Year Built
4Stories
C1Building Class
R6BZoning
11,522 sfGross Floor Area
16Units
Rent Stabilized1 Open Violation ▸
Over six families without stores · Owner of record: GF GUN HILL ROAD LLC · 5,898 sf lot · 1.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof28p · 3 filings · 20 docs
Floor 427p · 3 filings · 20 docs
Floor 325p · 3 filings · 20 docs
Floor 226p · 3 filings · 20 docs
Floor 134p · 5 filings · 20 docs
Cellar22p · 2 filings · 20 docs
Site & exterior2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ANTISS CONSTRUCTION1703/22/2026
ANTIS CONTRACTING1607/08/2026
TOPLINE NYC CONTRACTING303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BADALY ARCHITECTS904/08/2024
ASR ENGINEERING PC111/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KODRA CONSTRUCTION CORPGeneral Contractor907/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor303/21/2026
DIFALZO ELECTRIC NY, INCElectrical103/22/2026
MOHAMMAD R BADALYElectrical103/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BADALY ARCHITECT PLLC7137504/08/2024
Building Lifecycle
All (84)Filed (10)Permit Issued (9)Signed Off (6)Violation (16)Inspection (10)Special Inspection (30)Tax Incentive (3)
01/01/2027
421-a(16) construction completed
03/24/2026
Violation issued (ECB, open)
Elevators
11/18/2025
Violation issued (HPD, closed)
I
06/16/2025
Violation issued (HPD, closed)
A
09/18/2024
Signed off — Alteration
PROVIDE NEW MASONRY AND STRUCTURAL COLD-FORMED STEEL SUPERSTRUCTURE IN CONJUNCTION WITH NB APPLICATION #240280753.
X00563331-I1
09/17/2024
Signed off — Alteration
X08037005-I1
09/12/2024
421-a(16) registration filed
09/11/2024
Signed off — Alteration
CC filed in conjunction with NB 240280753 and BPP 240335552
X00911129-I1
09/10/2024
Signed off — Alteration
8'High Construction Fence around property perimeter.
X00597376-I1
09/10/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/17/2024
Signed off — Alteration
Provide new ventilation and HVAC system in conjunction with New Building NB240280753.
X00559237-I1
07/17/2024
Signed off — Alteration
Provide new sprinkler and plumbing system in conjunction with NB #240280753.
X00563330-I1
05/31/2024
Permit issued — Mechanical Systems
X00559237-I1-MS
04/26/2024
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
04/26/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/24/2024
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
04/16/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD BADALY
04/11/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MOHAMMAD BADALY
04/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMMAD BADALY
04/11/2024
Special inspection requirement — Seismic Isolation Systems
MOHAMMAD BADALY
04/11/2024
Special inspection requirement — Sprinkler Systems
MOHAMMAD BADALY
04/08/2024
Filed — Alteration
Provide new sprinkler and plumbing system in conjunction with NB #240280753.
X00563330-P2
04/05/2024
Special inspection requirement — Sprinkler Systems
MOHAMMAD BADALY
04/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMMAD BADALY
04/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD BADALY
04/05/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MOHAMMAD BADALY
04/05/2024
Special inspection requirement — Seismic Isolation Systems
MOHAMMAD BADALY
10/17/2023
Permit issued — Curb Cut
X00911129-I1-CC
10/12/2023
Filed — Alteration
CC filed in conjunction with NB 240280753 and BPP 240335552
X00911129-I1
10/02/2023
Permit issued — Construction Fence
X00597376-I1-FN
05/22/2023
Violation issued (ECB, closed)
Construction
02/02/2023
Violation issued (ECB, closed)
Construction
02/02/2023
Violation issued (ECB, closed)
Construction
01/27/2023
Filed — Alteration
Provide new sprinkler and plumbing system in conjunction with NB #240280753.
X00563330-P1
01/27/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/27/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/26/2023
Special inspection requirement — Seismic Isolation Systems
MOHAMMAD BADALY
01/26/2023
Special inspection requirement — Sprinkler Systems
MOHAMMAD BADALY
01/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMMAD BADALY
01/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD BADALY
01/26/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MOHAMMAD BADALY
01/11/2023
Violation issued (ECB, closed)
Construction
01/11/2023
Violation issued (ECB, closed)
Construction
01/11/2023
Violation issued (ECB, closed)
Construction
01/11/2023
Violation issued (ECB, closed)
Construction
12/22/2022
Filed — Alteration
Provide new ventilation and HVAC system in conjunction with New Building NB240280753.
X00559237-P2
12/22/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
MOHAMMAD BADALY
12/22/2022
Special inspection requirement — Duct leakage testing, insulation and design
MOHAMMAD BADALY
12/22/2022
Special inspection requirement — HVAC-R and service water heating system controls
MOHAMMAD BADALY
12/22/2022
Special inspection requirement — Mechanical Systems
MOHAMMAD BADALY
12/22/2022
Special inspection requirement — Final
MOHAMMAD BADALY
12/22/2022
Special inspection requirement — Electrical motors and elevators
MOHAMMAD BADALY
12/22/2022
Special inspection requirement — HVAC-R and service water heating equipment
MOHAMMAD BADALY
12/15/2022
Permit issued — Plumbing
X00563330-I1-EW-SP
12/15/2022
Violation issued (ECB, closed)
Construction
12/15/2022
Violation issued (ECB, closed)
Construction
11/14/2022
Permit issued — Sidewalk Shed
X08037005-I1-SH
11/10/2022
Filed — Alteration
X08037005-I1
11/10/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offKODRA CONSTRUCTION CORP05/31/2024
DOB NOWCurb CutSigned-offKODRA CONSTRUCTION CORP10/17/2023
DOB NOWConstruction FenceSigned-offKODRA CONSTRUCTION CORP10/02/2023
DOB NOWPlumbingSigned-offA M B MECHANICAL INC12/15/2022
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING11/14/2022
DOB NOWConstruction FenceSigned-offKODRA CONSTRUCTION CORP10/06/2022
DOB NOWStructuralSigned-offKODRA CONSTRUCTION CORP07/26/2022
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT07/15/2022
DOB NOWConstruction FenceSigned-offKODRA CONSTRUCTION CORP11/13/2021
BIS—ISSUEDKODRA CONSTRUCTION CORP10/13/2023
BIS—ISSUEDKODRA CONSTRUCTION CORP09/30/2022
BIS—ISSUEDKODRA CONSTRUCTION CORP11/17/2021
BIS—ISSUEDKODRA CONSTRUCTION CORP11/16/2021
BIS—ISSUEDA. LURRUOCC GENERAL CONTRACTOR04/12/2000
3 projects · most recent 06/23/2023
General Wiring
FiledStatusContractorScope
06/23/2023CompleteDIFALZO ELECTRIC NY, INCGeneral Wiring
11/28/2022CompleteAV GROUP ELECTRICAL LLCGeneral Wiring
11/11/2022CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/10/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
04/26/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
04/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/24/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
04/16/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/27/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/27/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/23/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/23/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/15/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
04/11/2024Fire-Resistant Penetrations and JointsMOHAMMAD BADALYspecial
04/11/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMOHAMMAD BADALYspecial
04/11/2024HVAC-R and service water piping design and insulationMOHAMMAD BADALYenergy_progress
04/11/2024Seismic Isolation SystemsMOHAMMAD BADALYspecial
04/11/2024Sprinkler SystemsMOHAMMAD BADALYspecial
04/05/2024Sprinkler SystemsMOHAMMAD BADALYspecial
04/05/2024HVAC-R and service water piping design and insulationMOHAMMAD BADALYenergy_progress
04/05/2024Fire-Resistant Penetrations and JointsMOHAMMAD BADALYspecial
04/05/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMOHAMMAD BADALYspecial
04/05/2024Seismic Isolation SystemsMOHAMMAD BADALYspecial
01/26/2023Seismic Isolation SystemsMOHAMMAD BADALYspecial
01/26/2023Sprinkler SystemsMOHAMMAD BADALYspecial
01/26/2023HVAC-R and service water piping design and insulationMOHAMMAD BADALYenergy_progress
01/26/2023Fire-Resistant Penetrations and JointsMOHAMMAD BADALYspecial
01/26/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMOHAMMAD BADALYspecial
12/22/2022HVAC-R and service water piping design and insulationMOHAMMAD BADALYenergy_progress
12/22/2022Duct leakage testing, insulation and designMOHAMMAD BADALYenergy_progress
12/22/2022HVAC-R and service water heating system controlsMOHAMMAD BADALYenergy_progress
12/22/2022Mechanical SystemsMOHAMMAD BADALYspecial
12/22/2022FinalMOHAMMAD BADALYprogress
12/22/2022Electrical motors and elevatorsMOHAMMAD BADALYenergy_progress
12/22/2022HVAC-R and service water heating equipmentMOHAMMAD BADALYenergy_progress
11/22/2021Structural Steel - WeldingMOHAMMAD BADALYspecial
11/22/2021MasonryMOHAMMAD BADALYspecial
11/22/2021Structural Cold-Formed SteelMOHAMMAD BADALYspecial
Latest 25 of 37.
▾Documents — 160 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/25/2026X00559237-P2Request digital key ↗
08/25/2026X00559237-P1Request digital key ↗
08/25/2026X00559237-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION15
11/13/2024240280753Open ↗
10/31/2024240280753Open ↗
09/13/2024240280753Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION3
11/18/2021240280753Open ↗
11/18/2021240280753Open ↗
11/18/2021240280753Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
07/28/2023240335552Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
09/29/2020240280753Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
09/21/2021240280753Open ↗
▸BISVERIFY TAX LOT1
12/04/2024240280753Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
08/27/2021240280753Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
05/28/2024240280753Open ↗
▸BISZONING DIAGRAM1
09/21/2021240280753Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
09/21/2021240280753Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/25/2026X00559237-P1Open ↗
08/25/2026X00559237-P2Open ↗
08/25/2026X00559237-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026X00563330-I1Open ↗
08/29/2026X00563330-P1Open ↗
08/27/2026X00563331-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026X00563330-I1Open ↗
08/29/2026X00563330-P1Open ↗
08/27/2026X00563331-I1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
09/08/2022240335552Open ↗
08/31/2020240280753Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/08/2022240335552Open ↗
08/31/2020240280753Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/08/2021240280753Open ↗
▸Trade Schedules & Equipment3
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
05/30/2024240280753Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
05/30/2024240280753Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
08/27/2021240280753Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
07/05/2023240335552Open ↗
08/27/2021240280753Open ↗
▸BISSTREET TREE SIGNOFF2
05/30/2024240335552Open ↗
05/30/2024240280753Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/09/2021240280753Open ↗
▸BISBPP: STREET TREES SITE PLAN1
07/28/2023240335552Open ↗
▸Environmental & Asbestos14
▸DOB NOWOER: Notice to Proceed7
08/24/2026X00563330-I1Open ↗
08/13/2026X00563331-I1Open ↗
08/13/2026X00563330-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWOER: Notice of Satisfaction3
08/24/2026X00563330-I1Open ↗
08/13/2026X00559237-I1Open ↗
08/13/2026X00563331-I1Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
09/08/2022240335552Open ↗
08/27/2021240280753Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
07/22/2024240335552Open ↗
03/19/2024240280753Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/16/2024240280753Open ↗
11/01/2021240280753Open ↗
09/21/2021240280753Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/24/2026X00563330-I1Open ↗
08/13/2026X00559237-I1Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
05/30/2024240280753Open ↗
▸BISINTERIOR LIGHTING POWER1
05/30/2024240280753Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
05/30/2024240280753Open ↗
▸BISFENESTRATION AREAS1
05/30/2024240280753Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
05/30/2024240280753Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
05/30/2024240280753Open ↗
▸BISLIGHTING IN DWELLING UNITS1
05/30/2024240280753Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/30/2024240280753Open ↗
▸BISELECTRIC MOTORS1
05/30/2024240280753Open ↗
▸BISLIGHTING CONTROLS1
05/30/2024240280753Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/15/2024240280753Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/08/2021240280753Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
08/31/2020240280753Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
05/30/2024240280753Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY6
08/16/2024240280753Open ↗
04/06/2022240280753Open ↗
11/09/2021240280753Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
11/08/2021240280753Open ↗
11/01/2021240280753Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/30/2024240280753Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/30/2024240280753Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
05/30/2024240280753Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
05/30/2024240280753Open ↗
▸BISSOIL REPORT1
08/27/2021240280753Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/27/2021240280753Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
11/08/2021240280753Open ↗
▸Approvals, Objections & Sign-offs10
▸BISSCHEDULE A - OCCUPANCY / USE8
11/13/2024240280753Open ↗
10/31/2024240280753Open ↗
09/11/2024240280753Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
03/30/2022240280753Open ↗
03/30/2022240280753Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION9
08/19/2024240280753Open ↗
08/19/2024240280753Open ↗
06/13/2024240280753Open ↗
Showing 3 of 9 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
09/08/2022240335552Open ↗
08/31/2020240280753Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
07/28/2023240335552Open ↗
▸BISEFILING COVER SHEET1
10/29/2020240280753Open ↗
▸Other Documents8
▸BISUNDERPINNING (2014)2
08/15/2024240280753Open ↗
08/15/2024240280753Open ↗
▸BISSHUTOFF DAMPERS1
05/30/2024240280753Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
10/16/2020240280753Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
07/05/2023240335552Open ↗
▸BISMAINTENANCE INFORMATION1
05/30/2024240280753Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
07/28/2023240335552Open ↗
▸BISPLOT DIAGRAM1
08/27/2021240280753Open ↗