← Back
BuildNYC
Over six families without stores
1429 EAST GUN HILL ROAD
BRONX · BIN 2130628
💬 Discuss this project
2022Year Built
4Stories
C1Building Class
R6BZoning
11,522 sfGross Floor Area
16Units
Rent Stabilized1 Active Violation ▸
Over six families without stores · Owner of record: GF Gun Hill Road · 5,898 sf lot · 1.95 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed 16 unit apartment building ventilation40p · 3 filings · 20 docs
BulkheadProposed 16 unit plumbing and fire sprinkler system5p · 2 filings · 20 docs
Floor 4Proposed 16 unit apartment building ventilation39p · 3 filings · 20 docs
Floor 3Proposed 16 unit apartment building ventilation37p · 3 filings · 20 docs
Floor 2Proposed 16 unit apartment building ventilation38p · 3 filings · 20 docs
Floor 1Unit 146p · 5 filings · 20 docs
CellarProposed 16 unit apartment building ventilation36p · 2 filings · 20 docs
Site & exteriorProposed fence around property perimeter2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GF Gunhill Road1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Badaly Architects904/08/2024
Asr Engineering111/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kodra ConstructionGeneral Contractor403/21/2026
Kodra ConstructionScaffold407/08/2026
Topline NYC ContractingScaffold303/21/2026
Horbridge Plumbing & HeatingPlumbing107/08/2026
Difalzo Electric NYElectrical103/22/2026
Prime Piping & HeatingFire Protection107/08/2026
Mohammad R BadalyElectrical103/21/2026
Kodra Constructionspecialty_contractor107/08/2026
A. Lurruocc General ContractorGeneral Contractor104/12/2000
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Badaly Architect7137504/08/2024
Building Lifecycle
01/01/2027
421-a(16) construction completed
08/04/2026
Elevator Category 1 inspection report filed
03/24/2026
Class 2 items: in-car communication is not connected to a continuously staffed location, as required by NYC building code asme A17.1 S2.27.1.1 call…
ECB violation · open
11/18/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
06/16/2025
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
87 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offKodra Construction05/31/2024
DOB NOWCurb CutSigned-offKodra Construction10/17/2023
DOB NOWConstruction FenceSigned-offKodra Construction10/02/2023
DOB NOWSprinklersSigned-offAmb Mechanical12/15/2022
DOB NOWSidewalk ShedSigned-offTopline NYC Contracting11/14/2022
DOB NOWConstruction FenceSigned-offKodra Construction10/06/2022
DOB NOWStructuralSigned-offKodra Construction07/26/2022
DOB NOWPlumbingSigned-offHorbridge Plumbing & Heating07/15/2022
DOB NOWConstruction FenceSigned-offKodra Construction11/13/2021
BIS—ISSUEDKodra Construction10/13/2023
BIS—ISSUEDKodra Construction09/30/2022
BIS—ISSUEDKodra Construction11/17/2021
BIS—ISSUEDKodra Construction11/16/2021
BIS—ISSUEDA. Lurruocc General Contractor04/12/2000
3 projects · most recent 06/23/2023
General Wiring
FiledStatusContractorScope
06/23/2023CompleteDifalzo Electric NYGeneral Wiring
11/28/2022CompleteAV Group ElectricalGeneral Wiring
11/11/2022CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
09/10/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
04/26/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
04/26/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/24/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
04/16/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/27/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/27/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/23/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/23/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/15/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 37
DateRequirementInspectorRole
04/11/2024Sprinkler SystemsMOHAMMAD BADALYspecial
04/11/2024Fire-Resistant Penetrations and JointsMOHAMMAD BADALYspecial
04/11/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMOHAMMAD BADALYspecial
04/11/2024HVAC-R and service water piping design and insulationMOHAMMAD BADALYenergy_progress
04/11/2024Seismic Isolation SystemsMOHAMMAD BADALYspecial
04/05/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMOHAMMAD BADALYspecial
04/05/2024Fire-Resistant Penetrations and JointsMOHAMMAD BADALYspecial
04/05/2024HVAC-R and service water piping design and insulationMOHAMMAD BADALYenergy_progress
04/05/2024Sprinkler SystemsMOHAMMAD BADALYspecial
04/05/2024Seismic Isolation SystemsMOHAMMAD BADALYspecial
01/26/2023Fire-Resistant Penetrations and JointsMOHAMMAD BADALYspecial
01/26/2023Seismic Isolation SystemsMOHAMMAD BADALYspecial
01/26/2023HVAC-R and service water piping design and insulationMOHAMMAD BADALYenergy_progress
01/26/2023Sprinkler SystemsMOHAMMAD BADALYspecial
01/26/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMOHAMMAD BADALYspecial
12/22/2022Mechanical SystemsMOHAMMAD BADALYspecial
12/22/2022FinalMOHAMMAD BADALYprogress
12/22/2022Electrical motors and elevatorsMOHAMMAD BADALYenergy_progress
12/22/2022HVAC-R and service water heating equipmentMOHAMMAD BADALYenergy_progress
12/22/2022HVAC-R and service water piping design and insulationMOHAMMAD BADALYenergy_progress
12/22/2022Duct leakage testing, insulation and designMOHAMMAD BADALYenergy_progress
12/22/2022HVAC-R and service water heating system controlsMOHAMMAD BADALYenergy_progress
11/22/2021MasonryMOHAMMAD BADALYspecial
11/22/2021Structural Cold-Formed SteelMOHAMMAD BADALYspecial
11/22/2021Structural Steel - DetailsMOHAMMAD BADALYspecial
Latest 25 of 37.
160 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account