← Back
Two family converted from one family
143-02 111 AVENUE
QUEENS · South Jamaica · BIN 4258619
💬 Discuss this project
1940Year Built
2Stories
B3Building Class
R3AZoning
2,194 sfGross Floor Area
2Units
2 Open Violations ▸FDNY Report ↗
Two family converted from one family · Owner of record: 111 AVENUE 2020 CORP · 3,786 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
PlumbingEquipment
Floor 22p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar2p · 2 filings · 20 docs
Site & exterior1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARVIN CONSTRUCTION503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/17/2020$200K—— → —$91/sf building
01/17/2020$310K—— → —$141/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HANSA BUILDING ENGINEERING SERVICES312/22/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CJ HEATING & MECHANICAL CPlumbing207/08/2026
ARVIN CONSTRUCTION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495212/22/2021
Building Lifecycle
All (41)Filed (3)Permit Issued (3)Violation (6)Inspection (3)Objection (4)Special Inspection (22)
12/30/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/30/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/26/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Akeeb Shekoni
12/26/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
12/26/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
12/26/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
12/26/2021
Special inspection requirement — Fire-Resistance Rated Construction
HANSA PERSAUD
12/26/2021
Special inspection requirement — Energy Code Compliance Inspections
HANSA PERSAUD
12/26/2021
Special inspection requirement — Maintenance information
HANSA PERSAUD
12/26/2021
Special inspection requirement — HVAC insulation and sealing
HANSA PERSAUD
12/26/2021
Special inspection requirement — HVAC and service water heating equipment
HANSA PERSAUD
12/26/2021
Special inspection requirement — Electrical energy consumption
HANSA PERSAUD
12/26/2021
Special inspection requirement — HVAC and service water heating system controls
HANSA PERSAUD
12/22/2021
Filed — Alteration
PROPOSE 3-PIECE FIXTURE (WASH BASIN, WATER CLOSET, TUB). PROPOSE WASHER, SLOP SINK & FLOOR DRAINS. PROPOSE GAS DRYER, HOT WATER HEATERS, & BOILERS. PROPOSE (2)- 3 PIECE FIXTURES (WASH BASIN, WATER CLOSET, TUB) PROPOSE KITCHEN SINK & GAS STOVE AT 1ST & 2ND
Q00415971-P1
12/22/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
12/22/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Akeeb Shekoni
12/22/2021
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
12/22/2021
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
12/22/2021
Special inspection requirement — Energy Code Compliance Inspections
HANSA PERSAUD
12/22/2021
Special inspection requirement — Fire-Resistance Rated Construction
HANSA PERSAUD
12/22/2021
Special inspection requirement — HVAC and service water heating system controls
HANSA PERSAUD
12/22/2021
Special inspection requirement — Electrical energy consumption
HANSA PERSAUD
12/22/2021
Special inspection requirement — HVAC and service water heating equipment
HANSA PERSAUD
12/22/2021
Special inspection requirement — HVAC insulation and sealing
HANSA PERSAUD
12/22/2021
Special inspection requirement — Maintenance information
HANSA PERSAUD
11/10/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/03/2021
Permit issued — Plumbing
Q32845790-I1-PL
08/09/2021
Violation issued (ECB, open)
Construction
08/04/2021
Violation issued (ECB, open)
Construction
06/24/2021
Violation issued (DOB, closed)
VP*-VIOLATION UNSERVED ECB- DISMISSED
06/24/2021
Violation issued (ECB, closed)
Construction
06/24/2021
Violation issued (ECB, closed)
Construction
06/24/2021
Violation issued (ECB, closed)
Construction
05/28/2021
Permit issued — Plumbing
Q00415971-I1-PL
05/11/2021
Permit issued — Construction Fence
Q00500523-I1-FN
04/13/2021
Filed — Alteration
Q00500523-I1
12/07/2020
Objection raised — Scope
12/07/2020
Objection resolved — Addressed
12/07/2020
Objection raised — Inspections
12/07/2020
Objection resolved — Addressed
12/02/2020
Filed — Alteration
PROPOSE 3-PIECE FIXTURE (WASH BASIN, WATER CLOSET, TUB). PROPOSE WASHER, SLOP SINK & FLOOR DRAINS. PROPOSE GAS DRYER, HOT WATER HEATERS, & BOILERS. PROPOSE (2)- 3 PIECE FIXTURES (WASH BASIN, WATER CLOSET, TUB) PROPOSE KITCHEN SINK & GAS STOVE AT 1ST & 2ND
Q00415971-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedCJ HEATING & MECHANICAL C09/03/2021
DOB NOWPlumbingPermit IssuedCJ HEATING & MECHANICAL C05/28/2021
DOB NOWConstruction FencePermit IssuedARVIN CONSTRUCTION CORP05/11/2021
BIS—ISSUEDALCO BUILDERS12/13/2022
1 project · most recent 12/22/2021
Gas Storm Water/Sanitary
FiledStatusContractorScope
12/22/2021Permit IssuedJL PLUMBING, LLCGas, Storm, Water/Sanitary
1 project · most recent 07/15/2021
General Wiring
FiledStatusContractorScope
07/15/2021Permit IssuedATN ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/30/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/30/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/10/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
12/26/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationAkeeb Shekonispecial
12/26/2021Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
12/26/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
12/26/2021Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
12/26/2021Fire-Resistance Rated ConstructionHANSA PERSAUDprogress
12/26/2021Energy Code Compliance InspectionsHANSA PERSAUDprogress
12/26/2021Maintenance informationHANSA PERSAUDenergy_progress
12/26/2021HVAC insulation and sealing HANSA PERSAUDenergy_progress
12/26/2021HVAC and service water heating equipment HANSA PERSAUDenergy_progress
12/26/2021Electrical energy consumptionHANSA PERSAUDenergy_progress
12/26/2021HVAC and service water heating system controls HANSA PERSAUDenergy_progress
12/22/2021Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
12/22/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationAkeeb Shekonispecial
12/22/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
12/22/2021Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
12/22/2021Energy Code Compliance InspectionsHANSA PERSAUDprogress
12/22/2021Fire-Resistance Rated ConstructionHANSA PERSAUDprogress
12/22/2021HVAC and service water heating system controls HANSA PERSAUDenergy_progress
12/22/2021Electrical energy consumptionHANSA PERSAUDenergy_progress
12/22/2021HVAC and service water heating equipment HANSA PERSAUDenergy_progress
12/22/2021HVAC insulation and sealing HANSA PERSAUDenergy_progress
12/22/2021Maintenance informationHANSA PERSAUDenergy_progress
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch - Plumbing2
08/26/2026Q00415971-P1Request digital key ↗
08/15/2026Q00415971-I1Request digital key ↗
▸DOB NOWPlans/Sketch1
08/27/2026Q00500523-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
02/03/2021440648444Open ↗
▸BISWORK PERMIT APPLICATION1
02/06/2023440648444Open ↗
▸Zoning, Tax Lot & Property Records1
▸BISZONING DIAGRAM1
04/05/2021440648444Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature14
08/28/2026Q00415971-I1Open ↗
08/28/2026Q00415971-I1Open ↗
08/28/2026Q00415971-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026Q00415971-I1Open ↗
08/28/2026Q00415971-I1Open ↗
08/28/2026Q00415971-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/27/2026Q00500523-I1Open ↗
08/26/2026Q00415971-P1Open ↗
08/26/2026Q00415971-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/14/2020440648444Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/14/2020440648444Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
12/14/2020440648444Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026Q00415971-P1Open ↗
08/15/2026Q00415971-I1Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
12/14/2020440648444Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
12/14/2020440648444Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026Q00415971-P1Open ↗
08/13/2026Q00415971-I1Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
04/05/2021440648444Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00415971-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/06/2023440648444Open ↗
▸BISSCHEDULE A - OCCUPANCY - USE1
12/14/2020440648444Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
02/06/2023440648444Open ↗
▸BISCOST AFFIDAVIT1
12/14/2020440648444Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION2
03/08/2021440648444Open ↗
12/14/2020440648444Open ↗
▸BISBOROUGH INTAKE FORM2
02/06/2023440648444Open ↗
02/06/2023440648444Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/14/2020440648444Open ↗
▸Other Documents1
▸BISSUSTAINABLE ROOF ZONE FORM1
12/14/2020440648444Open ↗