ECB10/12/2011FAILURE TO PROVIDE APPROVED/ACCEPTED PLANS AT JOB SITE AT TIME OF INSPECTION. NOTED: 4-6 WORKMEN INSTALLING WINDOWS, DOORS AS PER PARTIAL S/W/O LIFT, W/O APPROVED PLANS ON SITE. REMEDY: PROVIDE APPROVED PLANSNothing owed — awaiting certificate of correction
ECB08/19/2011FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. NOTED: ALT VIA JOB #420334409 IN PROGRESS THRU OUT THE 3 STY DWELLING. PILED UP DEBRIS CONSISTS OF FURNITURES (USED) LUMBER, CONCRETE WORKNothing owed — awaiting certificate of correction
ECB08/19/2011FAILURE TO PROVIDE APPROVED ACCEPTED PLANS AT JOB SITE AT TIME INSPECTION. NOTED: ALT VIA JOB #420334409 IN PROGRESS. WORK APPROX 40% COMPLETE NO APPROVED PLANS AT JOB SITE. FULL STOP WORK ORDER ISSUED PURSUANTNothing owed — awaiting certificate of correction
ECB04/18/2011FAILURE TO MAINTAIN BLDG EXTERIOR DEFECT NOTED: AT THE RIGHT SIDE OF PREMISES, 2 LEADERS: 1 AT FRONT & 1 AT REAR, ARE NOT CONNECTED TO STORM SEWERING SYSTEM, ALLUDING DRAINAGE OF STORM WATER TO PUBLIC SIDEWALKNothing owed — awaiting certificate of correction
ECB04/07/2011FAILURE TO MAINTAIN BLDG WALLS & APPURTENANCES. DEFECTS NOTED: AT THE FRONT CRACKS DEVELOPED @ PARAPET LEVEL AND 2ND FLR LEVEL. JOB #420334409 FILED BUT DISAPPROVED FOR ALT WORK. REMEDY: MAINTAIN EXTERIOR BLDGNothing owed — awaiting certificate of correction