← Back
Miscellaneous hotel
143-06 94 AVENUE
QUEENS · Jamaica · BIN 4623452
💬 Discuss this project
2022Year Built
9Stories
H9Building Class
C6-2AZoning
43,581 sfGross Floor Area
1Units
LL97 CoveredRent Stabilized27 Open Violations ▸
Miscellaneous hotel · Owner of record: 94TH AVENUE HOSPITALITY, LLC · 9,009 sf lot · 4.84 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction50p · 5 filings · 20 docs
Bulkhead1p · 1 filing · 2 docs
Floor 9Under Construction50p · 5 filings · 20 docs
Floor 8Under Construction49p · 4 filings · 20 docs
Floor 7Under Construction48p · 4 filings · 20 docs
Floor 6Under Construction48p · 4 filings · 20 docs
Floor 5Under Construction48p · 4 filings · 20 docs
Floor 4Under Construction50p · 5 filings · 20 docs
Floor 3Under Construction46p · 5 filings · 20 docs
Floor 2Under Construction47p · 5 filings · 20 docs
Floor 1Under Construction52p · 5 filings · 20 docs
CellarUnder Construction53p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
38-26 11TH STREET2907/08/2026
SUPREME BUILDERS1004/09/2026
RELIABLE ENTERPRISES504/09/2026
94TH AVENUE HOSPITALITY1403/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/25/2020$1.6M—143-06 94TH AVE., LLC → 94TH AVENUE HOSPITALITY, LLC— not available
01/14/2014$360K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LEVIN ENGINEERING PLLC1003/21/2026
M.S. SAVANI ARCHITECT,P.C.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPREME BUILDERS CORPGeneral Contractor1107/08/2026
RRP PLUMBING CORPFire Protection307/08/2026
A & H INSTALLATION INCGeneral Contractor104/09/2026
RELIABLE ENTERPRISES INCGeneral Contractor104/09/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.394611/30/2023
Building Lifecycle
All (93)Filed (12)Permit Issued (13)Signed Off (6)Violation (8)Inspection (15)Objection (16)Special Inspection (23)
01/02/2026
Violation issued (ECB, closed)
Construction
12/23/2025
Violation issued (ECB, open)
Elevators
12/23/2025
Violation issued (ECB, closed)
Construction
12/23/2025
Violation issued (ECB, open)
Elevators
04/24/2025
Signed off — Alteration
INSTALLATION OF SINGLE 6000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING NB CONSTRUCTION. NB FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
Q08032923-I1
04/01/2025
Violation issued (ECB, closed)
Construction
04/01/2025
Violation issued (ECB, closed)
Construction
03/13/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY SUPPORTED PIPE SCAFFOLD PER DESIGN DRAWINGS
Q08030786-I1
02/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/13/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/05/2024
Signed off — Alteration
Q00458134-I1
07/31/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/26/2023
Signed off — Alteration
INSTALLATION OF A TEMPORARY STANDPIPE WITH AIR PRESSURIZED SYSTEM IN CONJUNCTION WITH NB # 440646534 . NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS BUILDING.
Q00454766-I1
12/20/2023
Signed off — Alteration
THIS APPLICATION IS FILED FOR 15' WIDE CURB CUT IN CONJUNCTION WITH NB 440646534.
Q00455245-I1
12/18/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
12/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
12/12/2023
Special inspection requirement — HVAC and service water heating equipment
Paul Raymond
12/12/2023
Special inspection requirement — HVAC and service water heating system controls
Paul Raymond
12/12/2023
Special inspection requirement — HVAC insulation and sealing
Paul Raymond
12/12/2023
Special inspection requirement — Maintenance information
Paul Raymond
12/12/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
11/30/2023
Filed — Alteration
INSTALLATION OF PLUMBING SYSTEM IN CONJUNCTION WITH NEW BUILDING APPLICATION#440646534. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00442959-P1
11/27/2023
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
11/22/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/22/2023
Inspection — Pass-Final SD - Fire Pump
Pass
View inspection ↗
11/15/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/15/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
11/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
11/14/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
11/14/2023
Special inspection requirement — HVAC insulation and sealing
Paul Raymond
11/14/2023
Special inspection requirement — HVAC and service water heating equipment
Paul Raymond
11/14/2023
Special inspection requirement — Maintenance information
Paul Raymond
11/14/2023
Special inspection requirement — HVAC and service water heating system controls
Paul Raymond
08/23/2023
Permit issued — Structural
Q00437042-I1-ST
08/16/2023
Permit issued — Mechanical Systems
Q00442813-I1-MS
08/16/2023
Permit issued — Standpipe
Q00454829-I1-EW-SD
08/16/2023
Permit issued — Sprinklers
Q00454829-I1-EW-SP
08/16/2023
Permit issued — Curb Cut
Q00455245-I1-CC
06/13/2023
Signed off — Alteration
Q08015486-I1
04/07/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/07/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
04/07/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/07/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/17/2023
Permit issued — Plumbing
Q00442959-I1-PL
01/26/2023
Permit issued — Construction Fence
Q00458134-I1-FN
12/08/2022
Filed — Alteration
INSTALLATION OF SINGLE 6000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING NB CONSTRUCTION. NB FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
Q08032923-P1
12/01/2022
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
11/15/2022
Violation issued (ECB, closed)
Construction
11/08/2022
Permit issued — Supported Scaffold
Q08030786-I1-SF
11/07/2022
Filed — Alteration
INSTALLATION OF SINGLE 6000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING NB CONSTRUCTION. NB FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
Q08032923-I1
11/07/2022
Permit issued — Protection and Mechanical Methods
Q08032923-I1-PMM
11/04/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SUPPORTED PIPE SCAFFOLD PER DESIGN DRAWINGS
Q08030786-I1
11/01/2022
Violation issued (ECB, closed)
Construction
10/08/2022
Permit issued — Construction Fence
Q00458134-I1-FN
10/05/2022
Filed — Alteration
Q08015486-I1
10/05/2022
Permit issued — Sidewalk Shed
Q08015486-I1-SH
06/23/2022
Permit issued — Standpipe
Q00454766-I1-EW-SD
10/15/2021
Permit issued — Construction Fence
Q00458134-I1-FN
04/06/2021
Objection raised — Scope
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedSUPREME BUILDERS CORP08/23/2023
DOB NOWMechanical SystemsPermit IssuedSUPREME BUILDERS CORP08/16/2023
DOB NOWStandpipePermit IssuedRALPH W. LANDOLFI JR.08/16/2023
DOB NOWSprinklersSigned-offRALPH W. LANDOLFI JR.08/16/2023
DOB NOWCurb CutSigned-offSUPREME BUILDERS CORP08/16/2023
DOB NOWPlumbingPermit IssuedPLBG P & H INC02/17/2023
DOB NOWConstruction FenceSigned-offSUPREME BUILDERS CORP01/26/2023
DOB NOWSupported ScaffoldSigned-offSUPREME BUILDERS CORP11/08/2022
DOB NOWProtection and Mechanical MethodsSigned-offA H INSTALLATION11/07/2022
DOB NOWConstruction FenceSigned-offSUPREME BUILDERS CORP10/08/2022
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC10/05/2022
DOB NOWStandpipeSigned-offRALPH W. LANDOLFI JR.06/23/2022
DOB NOWConstruction FenceSigned-offSUPREME BUILDERS CORP10/15/2021
BIS—ISSUEDSUPREME BUILDERS CORP09/27/2023
BIS—ISSUEDSUPREME BUILDERS CORP10/21/2022
BIS—ISSUEDSUPREME BUILDERS CORP09/27/2022
BIS—ISSUEDSUPREME BUILDERS CORP08/31/2022
BIS—ISSUEDSUPREME BUILDERS CORP07/13/2022
BIS—ISSUEDSUPREME BUILDERS CORP11/12/2021
1 project · most recent 01/22/2021
Air Conditioning Systems Generators
FiledStatusContractorScopeMake / Model / Capacity
01/22/2021Permit IssuedSUPREME BUILDERS CORPAir Conditioning Systems, Generators
Cooling
Ice Air 8RSNU09H 380 CFM · Ptac ×112
Mitsubishi Electric PUHY-P120TNU-A 10 BTU · Vrf Outdoor ×1
PURY-EP144TNU-A 12 BTU · Vrf Outdoor ×1
PURY-HP72TNU-A 6 BTU · Vrf Outdoor ×1
PURY-P96TNU-A 8 BTU · Vrf Outdoor ×1
Generators
Cummins C150D6D 170 kW · Generator ×1
1 project · most recent 01/22/2021
FiledStatusContractorScope
01/22/2021Permit IssuedRRP PLUMBING CORP—
1 project · most recent 11/30/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
11/30/2023Permit IssuedPLBG P & H INCGas, Storm, Water/Sanitary
4 projects · most recent 11/27/2023
General Wiring
FiledStatusContractorScope
11/27/2023CompleteJUN SAFETY ELECTRICAL INCGeneral Wiring
11/16/2022CompleteRICHARD NEU—
10/25/2022Permit IssuedKWONG MING ELECTRIC INC—
10/11/2022CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
02/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/13/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/31/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/18/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
11/27/2023Pass-Final SD - Fire PumpPassView ↗
11/22/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/22/2023Pass-Final SD - Fire PumpPassView ↗
11/15/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/15/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/07/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/07/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/07/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/07/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/01/2022Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
12/12/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
12/12/2023HVAC and service water heating equipment Paul Raymondenergy_progress
12/12/2023HVAC and service water heating system controls Paul Raymondenergy_progress
12/12/2023HVAC insulation and sealing Paul Raymondenergy_progress
12/12/2023Maintenance informationPaul Raymondenergy_progress
12/12/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
11/14/2023Fire-Resistant Penetrations and JointsPaul Raymondspecial
11/14/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
11/14/2023HVAC insulation and sealing Paul Raymondenergy_progress
11/14/2023HVAC and service water heating equipment Paul Raymondenergy_progress
11/14/2023Maintenance informationPaul Raymondenergy_progress
11/14/2023HVAC and service water heating system controls Paul Raymondenergy_progress
01/15/2021Standpipe SystemsPaul Raymondspecial
01/15/2021Fire-Resistant Penetrations and JointsPaul Raymondspecial
01/15/2021Sprinkler SystemsPaul Raymondspecial
12/18/2020FinalPaul Raymondprogress
12/18/2020Fire-Resistant Penetrations and JointsPaul Raymondspecial
12/18/2020Shutoff dampersPaul Raymondenergy_progress
12/18/2020Maintenance informationPaul Raymondenergy_progress
12/18/2020HVAC insulation and sealing Paul Raymondenergy_progress
12/18/2020Mechanical SystemsPaul Raymondspecial
12/18/2020HVAC and service water heating equipment Paul Raymondenergy_progress
12/18/2020HVAC and service water heating system controls Paul Raymondenergy_progress
▾Documents — 200 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch4
08/25/2026Q08015486-I1Request digital key ↗
08/25/2026Q08030786-I1Request digital key ↗
08/25/2026Q08032923-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/23/2026Q00442959-P1Request digital key ↗
08/23/2026Q00442959-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe2
08/27/2026Q00454766-I1Request digital key ↗
08/15/2026Q00454829-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/15/2026Q00455245-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/14/2026Q00442813-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/27/2026Q00437042-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/15/2026Q00454829-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00458134-I1Request digital key ↗
▸Applications & Permits18
▸BISPLAN / WORK APPROVAL APPLICATION10
11/21/2023440646534Open ↗
09/26/2023440646534Open ↗
11/09/2022440646534Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION7
10/21/2022440646534Open ↗
10/06/2022440646534Open ↗
10/06/2022440646534Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
03/16/2021440646534Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
03/16/2021440646534Open ↗
▸BISVERIFY TAX LOT1
04/23/2025440646534Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
03/16/2021440646534Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
12/08/2023440646534Open ↗
▸BISZONING DIAGRAM1
10/06/2021440646534Open ↗
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026Q00442959-P1Open ↗
09/01/2026Q00442959-P1Open ↗
09/01/2026Q00442959-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/27/2026Q00454766-I1Open ↗
08/27/2026Q00442813-I1Open ↗
08/27/2026Q00454829-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026Q00454829-I1Open ↗
09/01/2026Q00454829-I1Open ↗
09/01/2026Q00454829-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
09/12/2022440646534Open ↗
09/12/2022440646534Open ↗
08/02/2021421788168Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
01/12/2021440660964Open ↗
12/08/2020440646534Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
03/16/2021440646534Open ↗
01/12/2021440660964Open ↗
▸Trade Schedules & Equipment4
▸BISGAS CUT-OFF1
03/10/2022421788168Open ↗
▸BISSEWER CUT-OFF1
03/10/2022421788168Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
12/15/2023440646534Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
03/10/2022421788168Open ↗
▸Safety & Tenant Protection7
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
03/10/2022421788168Open ↗
03/10/2022421788168Open ↗
▸BISSTREET TREES SITE PLAN2
09/12/2022440646534Open ↗
07/11/2022440646534Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
07/11/2022440646534Open ↗
▸BISSTREET TREE CHECKLIST1
03/16/2021440646534Open ↗
▸BISSTREET TREE SIGNOFF1
06/02/2025440646534Open ↗
▸Environmental & Asbestos7
▸DOB NOWOER: Notice to Proceed5
08/13/2026Q00454829-I1Open ↗
08/13/2026Q00442959-P1Open ↗
08/13/2026Q00437042-I1Open ↗
Showing 3 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
10/14/2021440660964Open ↗
10/05/2021440646534Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
10/06/2021440646534Open ↗
10/05/2021440646534Open ↗
03/16/2021440646534Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/12/2022440646534Open ↗
01/07/2021440646534Open ↗
▸BISENERGY CODE COMPLIANCE FEE1
10/05/2021440646534Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
12/08/2023440646534Open ↗
▸BISINTERIOR LIGHTING POWER1
12/08/2023440646534Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
12/08/2023440646534Open ↗
▸BISFENESTRATION AREAS1
12/08/2023440646534Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
12/08/2023440646534Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
12/08/2023440646534Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/08/2023440646534Open ↗
▸BISLIGHTING CONTROLS1
12/08/2023440646534Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00442959-I1Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY6
10/05/2021440646534Open ↗
10/05/2021440646534Open ↗
10/05/2021440646534Open ↗
Showing 3 of 6 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
04/23/2025440646534Open ↗
07/11/2022440646534Open ↗
▸DOB NOWHydrant Flow Test Letter2
08/15/2026Q00454829-I1Open ↗
08/15/2026Q00454829-I1Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
10/05/2021440646534Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
07/11/2022440646534Open ↗
▸BISSTRUCTURAL STABILITY - ALTERATIONS OF EXISTING BUILDINGS1
12/08/2023440646534Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
12/08/2023440646534Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
12/08/2023440646534Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
12/08/2023440646534Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
12/08/2023440646534Open ↗
▸BISSOIL REPORT1
03/22/2021440646534Open ↗
▸Approvals, Objections & Sign-offs18
▸BISLETTERS - SUPPORTING DOCUMENTATION12
10/19/2023440646534Open ↗
09/16/2022440646534Open ↗
09/12/2022440646534Open ↗
Showing 3 of 12 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
11/21/2023440646534Open ↗
09/26/2023440646534Open ↗
03/29/2021440646534Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS APPROVAL1
03/10/2022421788168Open ↗
▸Cost, Insurance & Ownership6
▸BISPROJECT-SPECIFIC GL INSURANCE4
10/21/2022440646534Open ↗
10/06/2022440646534Open ↗
09/12/2022440646534Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
11/23/2022440646534Open ↗
03/10/2022421788168Open ↗
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION6
10/24/2023440646534Open ↗
10/24/2023440646534Open ↗
10/19/2023440646534Open ↗
Showing 3 of 6 on file for this type
▸BISBOROUGH INTAKE FORM5
10/20/2022440646534Open ↗
09/16/2022440646534Open ↗
09/16/2022440646534Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
01/12/2021440660964Open ↗
12/08/2020440646534Open ↗
▸BISEFILING COVER SHEET2
06/10/2021421788168Open ↗
01/07/2021440646534Open ↗
▸Other Documents9
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
10/21/2022440646534Open ↗
10/06/2022440646534Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
03/16/2021440646534Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
10/14/2021440660964Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
12/08/2023440646534Open ↗
▸BISVESTIBULES1
12/08/2023440646534Open ↗
▸BISMAINTENANCE INFORMATION1
12/08/2023440646534Open ↗
▸BISIN-CONJUNCTION MS FILING REQUIRED FORECC REVIEW1
10/05/2021440646534Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
12/08/2023440646534Open ↗