← Back
BuildNYC
Two family brick
143-06 LABURNUM AVENUE
QUEENS · BIN 4624811
💬 Discuss this project
2024Year Built
2Stories
B1Building Class
R3AZoning
2,376 sfGross Floor Area
2Units
0 Active Violations
Two family brick · Owner of record: 96-15 25th Ave · 3,462 sf lot · 0.69 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofResidential Rooftop Grid-tied Solar PV System3p · 2 filings · 20 docs
Floor 215p · 1 filing · 20 docs
Floor 132p · 1 filing · 20 docs
Cellar17p · 1 filing · 20 docs
Site & exterior32p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
L & H Realty2607/08/2026
Rose Garden 157 Realty503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/21/2025$1.9M—96-15 25TH AVE. LIMITED → 14306 LABURNUM NY REALTY INC.$780/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Edward Lui Architect702/25/2025
Chun Feng, Architect101/07/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Amergy Solar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Amergy SolarGeneral Contractor303/21/2026
Excellent MetropolitanScaffold303/21/2026
Excellent MetropolitanGeneral Contractor207/08/2026
Crown PlumbingPlumbing207/08/2026
KJK ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G Engineering7778502/25/2025
Triangle Inspection & Tes7495302/25/2025
Sq. Arch4802101/07/2025
Building Lifecycle
06/12/2025
Signed off — New Building
NEW CONSTRUCTION OF DETACHED 2-STORY PLUS CELLAR 2-FAMILY HOUSE.
Q00929523-S2
06/11/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/14/2025
Signed off — New Building
NEW CONSTRUCTION OF DETACHED 2-STORY PLUS CELLAR 2-FAMILY HOUSE.
Q00929523-S1
04/02/2025
Signed off — New Building
NEW CONSTRUCTION OF DETACHED 2-STORY PLUS CELLAR 2-FAMILY HOUSE.
Q00929523-S3
03/28/2025
Permit issued — Construction Fence
Q00929523-S3-FN
67 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FenceSigned-offExcellent Metropolitan03/28/2025
DOB NOWCurb CutSigned-offExcellent Metropolitan03/03/2025
DOB NOWSolarSigned-offAmergy Solar01/08/2025
DOB NOWPlumbingSigned-offCrown Plumbing09/18/2024
DOB NOWPlumbingSigned-offCrown Plumbing02/28/2024
DOB NOWMechanical SystemsPermit IssuedExcellent Metropolitan01/02/2024
1 project · most recent 02/25/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
02/25/2025Signed-offExcellent MetropolitanHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 02/25/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/25/2025Signed-offCrown PlumbingGas, Storm, Water/Sanitary
2 projects · most recent 01/07/2025
General Wiring
FiledStatusContractorScope
01/07/2025CompleteI.P. Electric—
03/15/2024CompleteKJK ElectricGeneral Wiring
1 project · most recent 02/25/2025
Steel Masonry Wood
FiledStatusContractorScope
02/25/2025Signed-offExcellent MetropolitanSteel, Masonry, Wood
1 project · most recent 02/25/2025
Fence
FiledStatusContractorScope
02/25/2025Signed-offExcellent MetropolitanFence
1 project · most recent 02/25/2025
Earthwork
FiledStatusContractorScope
02/25/2025Signed-offExcellent MetropolitanEarthwork
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
06/11/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
03/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/07/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
01/14/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/29/2024Pass-Final PL - UndergroundPassView ↗
09/20/2024Pass-Final PL - UndergroundPassView ↗
04/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/11/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 95
DateRequirementInspectorRole
03/06/2025MeteringXIONGCAI GUenergy_progress
03/06/2025Permanent certificateXIONGCAI GUenergy_progress
03/06/2025Maintenance informationXIONGCAI GUenergy_progress
03/06/2025HVAC-R and service water heating equipmentXIONGCAI GUenergy_progress
03/06/2025HVAC-R and service water piping design and insulationXIONGCAI GUenergy_progress
03/06/2025HVAC-R and service water heating system controlsXIONGCAI GUenergy_progress
03/06/2025Energy Code Compliance InspectionsXIONGCAI GUprogress
03/06/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
03/06/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
03/06/2025Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
03/06/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIONGCAI GUspecial
02/25/2025Maintenance informationXIONGCAI GUenergy_progress
02/25/2025HVAC-R and service water heating system controlsXIONGCAI GUenergy_progress
02/25/2025HVAC-R and service water piping design and insulationXIONGCAI GUenergy_progress
02/25/2025MeteringXIONGCAI GUenergy_progress
02/25/2025Permanent certificateXIONGCAI GUenergy_progress
02/25/2025HVAC-R and service water heating equipmentXIONGCAI GUenergy_progress
02/25/2025Energy Code Compliance InspectionsXIONGCAI GUprogress
02/25/2025Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
02/25/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
02/25/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIONGCAI GUspecial
02/25/2025Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
02/11/2025Footing and FoundationXIONGCAI GUprogress
02/11/2025Fenestration areasXIONGCAI GUenergy_progress
02/11/2025Air barrier - visual inspectionXIONGCAI GUenergy_progress
Latest 25 of 95.
162 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account