ECB10/13/2026At time of inspection observed a diesel fuel generator @ 1ST floor without the required FDNY permit for the use of the generator. Stop all use of diesel fuel generator.$1K due
ECB10/02/2026At inspection of a 2-story building, no active construction work was observed, however a construction fence was in place. Department recordsindicate fence permit Q01245952-S2-fn expired 07/15/2026. The expired$1K due
ECB11/06/2025BC3309.4.3 preconstruction survey: during inspection of a 3 story building, i observed a chimney at exposure #2 that was cracked/missing mortar and dislodged from the facade with potential of falling. I request$1K due
ECB11/06/2025BC3314.1 scope scaffold: during inspection of an active site, i observed supported scaffold on the interior at ex#2 in front of a incomplete cmu wall with blocks on planks. The scaffold was missing guardrails,$3K due
ECB11/06/2025BC3309.10 roof protection: during inspection of an active site 3 stories high, i observed that there was missing roof protection over the HVAC units on the roof at ex#2 all equipment on the roof must be protec$3K due
ECB10/30/2025Bc 3308.5 at time of inspection observed loose vertical debris netting at exposure 1 and 4 this creates unsafe conditions to public and property by not protecting against falling objects.maintain netting at all$3K due
ECB09/19/2025At time of inspection i observed exposed wiring & lighting under the sidewalk shed not enclosed in water-resistant & vandal-resistant fixtures, & all lamps, wiring, and accessory components shall conform to the$2K due
ECB05/19/2025Sidewalk shed.@3STORY NB site in structure phase observe permitted sidewalk shed job#Q00567469 in place not conform to plans-additional tall shed section in middle of exp#1 not on plan,tall section missing vert$12K due
ECB05/19/2025Sidewalk shed.@3STOYR NB site in structure phase observe tall sections of shed by sites gates vertical member all missing displacement protection(high visibility marking/brace)&are displaced¬ plumb with dist$10K due
ECB12/13/2023Bc 1704.1.4.2 failure to performing special inspection duties and responsibilities: upon ceu's strcutural audit it was observed that the special inspection agency, aa building and inspection(license #001519) pe$2K due
ECB09/22/2023Work does not conform to approved construction documents and/or amendments.as noted:at time of inspection on active construction site 3 story with mezzanine steel structure building erected to roof level.observ$6K due
ECB08/22/2023At inspection, it was observed: sidewalk shed at exposure-1 was not tight to facade or sealed as per 3307.6.4.5 thereby exposing public using sidewalk to danger of being struck from above, also no reflective pa$2K due
ECB05/08/2023Inadequate protection for adjoining property space.@3 story NB site i observe steel structure phase up to 3RD floor level towering over adjoin property @exposure#3 (43-63 bowne st) with missing overhead protect$2K due
ECB11/06/20252113.1.6.1CHIMNEY responsibility of owner of taller building: active 3 story site adjacent to a building with a chimney stack at exposure #2 i observed that the chimney had not been extended which is required wNothing owed — awaiting certificate of correction
ECB04/24/2017B106,1,BC1905.6.5. Low strength test result. As noted: @ time of insp.foundation stage low compressive strength result:south/east,west & north footings,footing lines A7,C7,D8,D9,elevator pit, foundation walls.Nothing owed — awaiting certificate of correction
ECB07/16/2015Failure to maintain: no guardrails. Note: 5 sty bldg under construction. Towards the rear of the site observed stair opening 3FT x 8FT approx w/no guardrail system around it. At another location observed anotheNothing owed — awaiting certificate of correction
ECB07/16/2015Sec. 3301.1.2 failure to comply w/NYC fire code-general no permit for oxygen/acetylene. Note: 5 sty bldg under construction. At time of inspection observed workers using torch to do steel work. Tanks were locatNothing owed — awaiting certificate of correction
ECB07/16/2015Sec. 3303.4.1 maintenance: slipping & tripping hazards. Note: 5 sty bldg under construction. The sidewalk at the front of the site along 45 ave. A section of the sidewalk has be left uneven,cracked & damaged.Nothing owed — awaiting certificate of correction
Church, synagogue, chapel · Owner of record: Boon Church of Overseas Chinese Mission · 7,500 sf lot · 1.97 FAR built · Flood zone X