← Back
Two stories - detached, small or mid-size
143-08 84 ROAD
QUEENS · BIN 4208437
💬 Discuss this project
1930Year Built
1.75Stories
A1Building Class
R6AZoning
1,159 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · Owner of record: 14308 84TH ROAD LLC · 4,300 sf lot · 0.27 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 12 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/15/2025$1.4M—19649 45 AVE LLC → Private party$1,208/sf building
08/26/2022$1.4M—14308 BRIARWOOD LLC → 19649 45 AVE LLC$1,251/sf building
05/16/2016$1.1M—Private party → 14308 BRIARWOOD LLC$949/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO208/05/2026
Building Lifecycle
All (32)Filed (2)Objection (9)Special Inspection (21)
08/05/2026
Filed — New Building
HEREWITH FILE NEW BUILDING IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE. FILED SUBSEQUENTLY TO JOB NUMBER Q01409428-I1
Q01409428-S1
07/24/2026
Special inspection requirement — Maintenance information
06/19/2026
Objection raised — Other
06/19/2026
Objection raised — Zoning
06/19/2026
Objection raised — Other
06/19/2026
Objection raised — Zoning
06/19/2026
Objection raised — Other
06/19/2026
Objection raised — Other
06/19/2026
Objection raised — Other
06/19/2026
Objection raised — Zoning
06/19/2026
Objection raised — Zoning
06/02/2026
Filed — New Building
HEREWITH FILE NEW BUILDING IN ORDER TO ERECT TEMPORARY CONSTRUCTION PLYWOOD FENCE. FILED SUBSEQUENTLY TO JOB NUMBER Q01409428-I1
Q01409428-I1
05/29/2026
Special inspection requirement — Concrete - Cast-In-Place
05/29/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
05/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/29/2026
Special inspection requirement — Masonry
05/29/2026
Special inspection requirement — Energy Code Compliance Inspections
05/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
05/29/2026
Special inspection requirement — Air barrier — testing
05/29/2026
Special inspection requirement — Lighting controls
05/29/2026
Special inspection requirement — Fenestration areas
05/29/2026
Special inspection requirement — Lighting in dwelling units
05/29/2026
Special inspection requirement — Exterior lighting power
05/29/2026
Special inspection requirement — Air barrier - visual inspection
05/29/2026
Special inspection requirement — Metering
05/29/2026
Special inspection requirement — Air barrier continuity plan testing
05/29/2026
Special inspection requirement — Insulation placement and R values
05/29/2026
Special inspection requirement — Protection of exposed foundation insulation
05/29/2026
Special inspection requirement — Fenestration air leakage
05/29/2026
Special inspection requirement — Interior lighting power
05/29/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
05/29/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Nothing on file for this building.
1 project · most recent 08/05/2026
Fence
FiledStatusContractorScope
08/05/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
07/24/2026Maintenance information—energy_progress
05/29/2026Concrete - Cast-In-Place—special
05/29/2026Exterior Insulation and Finish Systems (EIFS)—special
05/29/2026Fire-Resistant Penetrations and Joints—special
05/29/2026Masonry—special
05/29/2026Energy Code Compliance Inspections—progress
05/29/2026Fire-Resistance Rated Construction—progress
05/29/2026Air barrier — testing —energy_progress
05/29/2026Lighting controls—energy_progress
05/29/2026Fenestration areas—energy_progress
05/29/2026Lighting in dwelling units—energy_progress
05/29/2026Exterior lighting power—energy_progress
05/29/2026Air barrier - visual inspection—energy_progress
05/29/2026Metering—energy_progress
05/29/2026Air barrier continuity plan testing—energy_progress
05/29/2026Insulation placement and R values—energy_progress
05/29/2026Protection of exposed foundation insulation—energy_progress
05/29/2026Fenestration air leakage—energy_progress
05/29/2026Interior lighting power—energy_progress
05/29/2026Subsurface Investigations (Borings/Test Pits)—special
05/29/2026Fenestration and door U-factor and product ratings—energy_progress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026Q01409428-S1Request digital key ↗
08/14/2026Q01409428-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026Q01409428-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/14/2026Q01409428-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026Q01409428-S1Open ↗
08/16/2026Q01409428-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/14/2026Q01409428-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/14/2026Q01409428-I1Open ↗
▸DOB NOWSOIL REPORT1
08/14/2026Q01409428-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/14/2026Q01409428-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026Q01409428-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026Q01409428-I1Open ↗