Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofExcelsiorprephighschool-q, G. Washington Carver HS for Sci-qUnder Construction9p · 5 filings · 19 docs
ArchitectureDMMechanical
Issued Permit Scope
General Construction
Project Q01127272Permit Issued · 07/13/2026
Remove existing science lab and prep room sinks and associated plumbing piping. Remove gas turrets, MGCV and piping. Provide new Lavatory, water closet and sinks in new Prep Room and Classroom
On file for this project
33 documents
Project Q08040608Permit Issued · 04/28/2026
Structural framing for mechanical equipment
On file for this project
21 documents
Project Q01323011Approved
No filed description on record for this project.
On file for this project
20 documents
Latest 3 of 5 filings on this floor.
Floor 3Queens Preparatory Academy, Excelsiorprephighschool-qUnder Construction23p · 4 filings · 19 docs
ArchitectureMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Project Q01105802Permit Issued · 07/14/2026
Replace 1 drinking fountain with water cooler and related plumbing work
On file for this project
26 documents
Project Q08040608Permit Issued · 04/28/2026
Structural framing for mechanical equipment
On file for this project
21 documents
Project Q01323011Approved
No filed description on record for this project.
On file for this project
20 documents
Latest 3 of 4 filings on this floor.
Floor 2Queens Preparatory Academy, G. Washington Carver HS for Sci-Under Construction60p · 8 filings · 20 docs
ArchitectureDMElectricalGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Project Q01105802Permit Issued · 07/14/2026
Replace 1 drinking fountain with water cooler and related plumbing work
On file for this project
26 documents
Project Q01127272Permit Issued · 07/13/2026
Remove existing science lab and prep room sinks and associated plumbing piping. Remove gas turrets, MGCV and piping. Provide new Lavatory, water closet and sinks in new Prep Room and Classroom
On file for this project
33 documents
Project Q01155263Permit Issued · 06/08/2026
Renovating existing toilet for ADA compliance, remove existing water closets and lavatory and provide new fixtures and modify existing plumbing distribution piping and sanitary piping per new fixture locations.
On file for this project
22 documents
Latest 3 of 8 filings on this floor.
Floor 1G. Washington Carver HS for Sci-qUnder Construction32p · 5 filings · 20 docs
ArchitectureGeneralMechanicalPlumbing
Issued Permit Scope
General Construction · Mechanical Systems · Plumbing
Project Q01127272Permit Issued · 07/13/2026
Remove existing science lab and prep room sinks and associated plumbing piping. Remove gas turrets, MGCV and piping. Provide new Lavatory, water closet and sinks in new Prep Room and Classroom
On file for this project
33 documents
Project Q08040608Permit Issued · 04/28/2026
Structural framing for mechanical equipment
On file for this project
21 documents
Project Q00837064Permit Issued · 11/24/2025
Modification to the extisting Plumbing system for claasroom & lab conversion. Scope includes removal of 1 ark sink & one wask fountain, installation of 2 medical room sinks and the replacement of 2 drinking fountains
On file for this project
34 documents
Latest 3 of 5 filings on this floor.
CellarScience lab and prep room sink replacementUnder Construction1p · 2 filings · 19 docs
General
Project Q01127272Permit Issued · 07/13/2026
Remove existing science lab and prep room sinks and associated plumbing piping. Remove gas turrets, MGCV and piping. Provide new Lavatory, water closet and sinks in new Prep Room and Classroom
On file for this project
33 documents
Project Q01323011Approved
No filed description on record for this project.
On file for this project
20 documents
BasementUnder Construction5p · 1 filing · 17 docs
ArchitectureGeneralMechanical
Project Q08040608Permit Issued · 04/28/2026
Structural framing for mechanical equipment
On file for this project
21 documents
Sub-BasementG. Washington Carver HS for Sci-qUnder Construction17p · 4 filings · 17 docs
ArchitectureMechanicalStructural
Issued Permit Scope
General Construction · Mechanical Systems · Structural
Project Q08040608Permit Issued · 04/28/2026
Structural framing for mechanical equipment
On file for this project
21 documents
Project Q01323011Approved
No filed description on record for this project.
On file for this project
20 documents
Project Q01333884Approved
Installing an acoustical enclosure inside existing classroom to serve as a production studio. Remove and replace all existing flooring and finishes in the classroom. Install new ceiling.
On file for this project
16 documents
Latest 3 of 4 filings on this floor.
Site & exteriorG. Washington Carver HS for Sci-qUnder Construction9p · 2 filings · 11 docs
EquipmentGeneralMechanicalStructuralOther
Issued Permit Scope
Construction Fence · Sidewalk Shed
Project Q01234274Permit Issued · 10/19/2026
INSTALLATION OF NEW SIDEWALK SHED FOR HS 265Q AT 143-10 SPRINGFIELD BLVD, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
5 documents
Project Q01124946Permit Issued · 04/09/2026
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR HS 265Q AT 143-10 SPRINGFIELD BLVD, QUEENS AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
On file for this project
6 documents
Filed — no permit issuedSidewalk shed filing3 filings
Project Q01446533Plan Examiner Review
Filing for sidewalk shed in conjuction with Q01323011. No change in use, egress or occupancy.
Project Q01446534Plan Examiner Review
Filing for temporary construction fence in conjuction with Q01323011. No change in use, egress or occupancy.
Project Q01446538Plan Examiner Review
Filing for temporary supported scaffolding in conjuction with Q01323011. No change in use, egress or occupancy.