143-20 91 AVENUE
QUEENS · BIN 4213860
💬 Discuss this project
1925Year Built
2Stories
B2Building Class
R5Zoning
2,180 sfGross Floor Area
2Units
35 Open Violations ▸FDNY Report ↗
Two family frame · Owner of record: MAZURA INTERNATIONAL INC. · 2,000 sf lot · 1.09 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 13p · 2 filings · 19 docs
Basement3p · 2 filings · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AMERICAN HOUSES I LLC603/22/2026
AMERICAN HOUSES 1 LLC403/22/2026
AMERICAN HOURS 1 LLC103/22/2026
AMERICAN HANSES 1 LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/06/2023$900K—Private party → MAZURA INTERNATIONAL INC.$413/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI202/01/2023
ALBERTO ROMAN105/13/2022
ASHRAF CORP108/13/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHVISION DESIGN STUDIO403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARCH VISION CONSTRUCTIONGeneral Contractor303/21/2026
LLOYD G DRUMMOND PLBG&GENPlumbing107/08/2026
M & M PIPING AND HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394302/01/2023
AR-TECH ENGINEERING, P.C.6659105/13/2022
Building Lifecycle
All (88)Filed (4)Permit Issued (3)Signed Off (2)Violation (57)Inspection (7)Objection (10)Special Inspection (5)
12/11/2023
Signed off — Alteration
ADDRESS ECB VIOLATION # 35068748Z, INSTALL 2PCS BATH (1 LAV., & 1 TOILET) REMOVE BATHTUB AND KITCHEN AND RE-INSTALL & LAUNDRY FIXTURE AT CELLAR AS PER PLAN, REMOVING 3PS TOILET FIXTURE AND KITCHEN AT 1ST FLOOR AS PER PLAN, NO CHANGE IN USE EGRESS OR OCCUP
Q00664810-I1
04/14/2023
Permit issued — Plumbing
Q00664810-I1-PL
03/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
02/16/2023
Objection resolved — Addressed
02/07/2023
Objection raised — Scope
02/01/2023
Filed — Alteration
ADDRESS ECB VIOLATION # 35068748Z, INSTALL 2PCS BATH (1 LAV., & 1 TOILET) REMOVE BATHTUB AND KITCHEN AND RE-INSTALL & LAUNDRY FIXTURE AT CELLAR AS PER PLAN, REMOVING 3PS TOILET FIXTURE AND KITCHEN AT 1ST FLOOR AS PER PLAN, NO CHANGE IN USE EGRESS OR OCCUP
Q00664810-P2
02/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
10/19/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/02/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/24/2022
Signed off — Alteration
ADDRESS ECB VIOLATION # 35068748Z, LEGALIZE 2PCS BATH (1 LAV., & 1 TOILET) REMOVE BATH TUB AND KITCHEN AND RE-INSTALL & LAUNDRY FIXTURE AT CELLAR AS PER PLAN,REMOVING 3PS TOILET FIXTURE AND KITCHEN AT 1ST FLOOR AS PER PLAN,NO CHANGE IN USE EGRESS OR OCCUP
Q00500255-I1
08/10/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/01/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/27/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
06/07/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/24/2022
Objection resolved — Addressed
05/17/2022
Objection raised — Scope
05/13/2022
Filed — Alteration
ADDRESS ECB VIOLATION # 35068748Z, INSTALL 2PCS BATH (1 LAV., & 1 TOILET) REMOVE BATHTUB AND KITCHEN AND RE-INSTALL & LAUNDRY FIXTURE AT CELLAR AS PER PLAN, REMOVING 3PS TOILET FIXTURE AND KITCHEN AT 1ST FLOOR AS PER PLAN, NO CHANGE IN USE EGRESS OR OCCUP
Q00664810-P1
05/13/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/29/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/30/2022
Permit issued — Plumbing
Q00664810-I1-PL
01/31/2022
Objection raised — Energy
01/31/2022
Objection resolved — Addressed
01/31/2022
Objection raised — Other
01/31/2022
Objection resolved — Addressed
01/31/2022
Objection raised — Scope
01/31/2022
Objection resolved — Addressed
01/26/2022
Filed — Alteration
ADDRESS ECB VIOLATION # 35068748Z, INSTALL 2PCS BATH (1 LAV., & 1 TOILET) REMOVE BATHTUB AND KITCHEN AND RE-INSTALL & LAUNDRY FIXTURE AT CELLAR AS PER PLAN, REMOVING 3PS TOILET FIXTURE AND KITCHEN AT 1ST FLOOR AS PER PLAN, NO CHANGE IN USE EGRESS OR OCCUP
Q00664810-I1
12/03/2021
Permit issued — General Construction
Q00500255-I1-GC
08/13/2021
Filed — Alteration
ADDRESS ECB VIOLATION # 35068748Z, LEGALIZE 2PCS BATH (1 LAV., & 1 TOILET) REMOVE BATH TUB AND KITCHEN AND RE-INSTALL & LAUNDRY FIXTURE AT CELLAR AS PER PLAN,REMOVING 3PS TOILET FIXTURE AND KITCHEN AT 1ST FLOOR AS PER PLAN,NO CHANGE IN USE EGRESS OR OCCUP
Q00500255-I1
08/12/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
AKM HOQUE
04/08/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
04/08/2021
Special inspection requirement — Lighting in dwelling units
AKM HOQUE
01/09/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/08/2018
Violation issued (ECB, closed)
Construction
10/16/2018
Violation issued (ECB, closed)
Construction
08/07/2018
Violation issued (ECB, closed)
Construction
07/25/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/22/2018
Violation issued (ECB, closed)
Construction
05/01/2018
Violation issued (ECB, closed)
Construction
03/20/2018
Violation issued (ECB, closed)
Construction
01/30/2018
Violation issued (ECB, closed)
Construction
12/07/2017
Violation issued (ECB, closed)
Construction
10/31/2017
Violation issued (ECB, closed)
Construction
09/13/2017
Violation issued (ECB, closed)
Construction
08/23/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/01/2017
Violation issued (ECB, closed)
Construction
05/24/2017
Violation issued (ECB, closed)
Construction
03/22/2017
Violation issued (HPD, open)
B
03/22/2017
Violation issued (HPD, open)
B
03/22/2017
Violation issued (HPD, open)
B
03/22/2017
Violation issued (HPD, open)
B
03/22/2017
Violation issued (HPD, open)
B
03/22/2017
Violation issued (HPD, open)
B
03/22/2017
Violation issued (HPD, open)
B
10/14/2016
Violation issued (HPD, open)
B
10/14/2016
Violation issued (HPD, open)
A
10/14/2016
Violation issued (HPD, open)
B
10/14/2016
Violation issued (HPD, open)
B
10/14/2016
Violation issued (HPD, open)
B
10/14/2016
Violation issued (HPD, open)
B
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offM & M PIPING AND HEATING04/14/2023
DOB NOWPlumbingSigned-offLLOYD G DRUMMOND PLBG&GEN03/30/2022
DOB NOWGeneral ConstructionSigned-offARCH VISION CONSTRUCTION12/03/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
10/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/01/2022Pass-Final General Construction Non-Directive 14PassView ↗
06/27/2022Fail-Final General Construction Non-Directive 14FailView ↗
06/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
03/07/2023Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
02/01/2023Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
08/12/2021HVAC-R and service water piping design and insulationAKM HOQUEenergy_progress
04/08/2021Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
04/08/2021Lighting in dwelling unitsAKM HOQUEenergy_progress
▾Documents — 23 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026Q00500255-I1Request digital key ↗
08/26/2026Q00664810-P1Request digital key ↗
08/14/2026Q00664810-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION5
05/08/2025401590603Open ↗
02/19/2025401590603Open ↗
02/12/2025401590603Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026Q00500255-I1Open ↗
08/13/2026Q00664810-P1Open ↗
08/13/2026Q00664810-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/26/2026Q00500255-I1Open ↗
08/26/2026Q00664810-I1Open ↗
08/25/2026Q00664810-P2Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/26/2026Q00500255-I1Open ↗
09/26/2026Q00500255-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026Q00500255-I1Open ↗
08/13/2026Q00664810-P1Open ↗
08/13/2026Q00664810-P2Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00500255-I1Open ↗