← Back
BuildNYC
Two stories - detached, small or mid-size
143-20 GLASSBORO AVENUE
QUEENS · South Jamaica · BIN 4257957
💬 Discuss this project
1920Year Built
2Stories
A1Building Class
R4-1Zoning
1,296 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,338 sf lot · 0.55 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 27p · 2 filings · 15 docs
Floor 17p · 2 filings · 15 docs
Cellar7p · 2 filings · 15 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/01/2017$485K—MSR CAPITAL INC → Private party$374/sf building
07/15/2016$300K—Private party → MSR CAPITAL INC.$231/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Robert E. Ikes, III502/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
City Wide Expediting1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Total Restorationspecialty_contractor303/21/2026
Total RestorationGeneral Contractor103/21/2026
Marquis P & HPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
C.M. Testing Laboratory1352302/04/2022
Building Lifecycle
02/04/2022
Filed — Alteration
ALT 2:INSTALLATION OF GAS FIRED BOILER, WATER HEATER, BATHROOM AND MECHANICAL EQUIPMENT EXHAUST, AND FRESH AIR INTAKE. WORK WILL NOT AFFECT USE, EGRESS, OR OCCUPANCY.
Q00226539-P2
12/23/2021
Permit expired, never signed off — Plumbing
The city's record still shows this permit as issued, with no sign-off on its filing
Q00226488-I1-PL
05/11/2021
Filed — Alteration
MODIFICATION TO PLUMBING FIXTURES IN 1 FAMILY RESIDENCE AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
Q00226488-P1
05/11/2021
Filed — Alteration
ALT 2:INSTALLATION OF GAS FIRED BOILER, WATER HEATER, BATHROOM AND MECHANICAL EQUIPMENT EXHAUST, AND FRESH AIR INTAKE. WORK WILL NOT AFFECT USE, EGRESS, OR OCCUPANCY.
Q00226539-P1
05/04/2021
Special inspection requirement — HVAC and service water heating equipment
JOHN SEMIOLI
26 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMarquis P & H12/23/2020
DOB NOWMechanical SystemsSigned-offTotal Restoration06/24/2020
BISOTISSUEDTotal Restoration01/22/2020
1 project · most recent 02/04/2022
Heating Systems
FiledStatusContractorScope
02/04/2022Signed-offTotal RestorationHeating Systems
1 project · most recent 05/11/2021
Gas Water/Sanitary
FiledStatusContractorScope
05/11/2021Permit IssuedMarquis P & HGas, Water/Sanitary
2 projects · most recent 02/01/2020
General Wiring
FiledStatusContractorScope
02/01/2020CompleteHome Run ElectricGeneral Wiring
05/16/2019Permit IssuedAll Ways Electric Corp.w—
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
05/04/2021HVAC and service water heating equipment JOHN SEMIOLIenergy_progress
05/04/2021HVAC and service water heating system controls JOHN SEMIOLIenergy_progress
29 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account