143-21 QUINCE AVENUE
QUEENS · BIN 4118227
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R2AZoning
2,299 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic31p · 1 filing · 20 docs
Floor 231p · 1 filing · 20 docs
Floor 153p · 1 filing · 20 docs
Cellar33p · 1 filing · 20 docs
Site & exterior51p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
55 97 PL2407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/19/2019$615K—Private party → SMAB HOMES INC$268/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Li Architect Associate805/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Li Architect Associate1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
K.S.K. Mechanicalspecialty_contractor603/21/2026
K.S.K. MechanicalScaffold107/08/2026
Dynamic Plumbing & SprinklerPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Li Architect Associate, P1104405/13/2024
Building Lifecycle
08/28/2024
Planting requirement. Noted: at time of inspection observed the planting area at the right side of premises was removed & replaced with concrete.;…
ECB violation · closed
08/28/2024
Work without a permit. Noted: at front of premises right side created curb cut approx. 9FT in length with approx. 10 inch of splay on the left…
ECB violation · closed
05/28/2024
Permit expired, never signed off — General Construction
The city's record still shows this permit as issued, with no sign-off on its filing
Q00834917-I1-GC-CX
05/20/2024
Special inspection requirement — Insulation placement and R values
Ling Li
05/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ling Li
71 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offK.S.K. Mechanical09/25/2023
DOB NOWGeneral ConstructionPermit IssuedK.S.K. Mechanical09/18/2023
DOB NOWConstruction FenceSigned-offK.S.K. Mechanical09/18/2023
DOB NOWPlumbingSigned-offCitywide Plumbing & Heating & SPKLS09/01/2023
1 project · most recent 05/13/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/13/2024Signed-offDynamic Plumbing & SprinklerGas, Storm, Water/Sanitary
2 projects · most recent 10/20/2023
General Wiring
FiledStatusContractorScope
10/20/2023CompleteAL-Lectric Elect'l ContractingGeneral Wiring
09/06/2023CompleteAL-Lectric Elect'l Contracting—
1 project · most recent 05/13/2024
FiledStatusContractorScope
05/13/2024Signed-offK.S.K. Mechanical—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
03/14/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/07/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
01/23/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
01/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 76
DateRequirementInspectorRole
05/20/2024Subgrade InspectionsLing Lispecial
05/20/2024MasonryLing Lispecial
05/20/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationLing Lispecial
05/20/2024Mechanical SystemsLing Lispecial
05/20/2024Fire-Resistant Penetrations and JointsLing Lispecial
05/20/2024Concrete - Cast-In-PlaceLing Lispecial
05/20/2024Fire-Resistance Rated ConstructionLing Liprogress
05/20/2024Energy Code Compliance InspectionsLing Liprogress
05/20/2024FinalLing Liprogress
05/20/2024PreliminaryLing Liprogress
05/20/2024Fenestration areasLing Lienergy_progress
05/20/2024HVAC-R and service water piping design and insulationLing Lienergy_progress
05/20/2024Fenestration and door U-factor and product ratingsLing Lienergy_progress
05/20/2024Insulation placement and R valuesLing Lienergy_progress
05/20/2024Protection of exposed foundation insulationLing Lienergy_progress
05/20/2024HVAC-R and service water heating system controlsLing Lienergy_progress
05/20/2024Fenestration air leakageLing Lienergy_progress
05/20/2024Interior lighting powerLing Lienergy_progress
05/20/2024HVAC-R and service water heating equipmentLing Lienergy_progress
04/22/2024HVAC-R and service water heating equipmentLing Lienergy_progress
04/22/2024Concrete - Cast-In-PlaceLing Lispecial
04/22/2024Fire-Resistant Penetrations and JointsLing Lispecial
04/22/2024MasonryLing Lispecial
04/22/2024Mechanical SystemsLing Lispecial
04/22/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationLing Lispecial
Latest 25 of 76.
38 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account