← Back
Three families
143 22 STREET
BROOKLYN · BIN 3009311
💬 Discuss this project
1910Year Built
2Stories
C0Building Class
M1-2DZoning
1,944 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · 1,878 sf lot · 1.04 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.410/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
U.S. CHIMNEY CORPGeneral Contractor107/08/2026
CLEAN TECH MECHANICAL INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851104/27/2022
Building Lifecycle
All (18)Filed (4)Permit Issued (2)Signed Off (2)Violation (3)Inspection (4)Special Inspection (3)
06/06/2025
Violation issued (HPD, closed)
A
11/29/2024
Violation issued (HPD, closed)
I
05/01/2024
Signed off — Alteration
REPLACE GAS BOILER AND TWO (2) GAS WATER HEATERS.
B00703935-I1
05/01/2024
Signed off — Alteration
INSTALL NEW 10" B-VENT CHIMNEY AS PER PLANS.
B00704098-I1
03/20/2023
Violation issued (HPD, closed)
A
10/24/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/24/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/21/2022
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
10/20/2022
Filed — Alteration
REPLACE GAS BOILER AND TWO (2) GAS WATER HEATERS.
B00703935-P2
09/28/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/26/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/02/2022
Permit issued — General Construction
B00704098-I1-GC
05/27/2022
Filed — Alteration
REPLACE GAS BOILER AND TWO (2) GAS WATER HEATERS.
B00703935-P1
05/06/2022
Permit issued — Plumbing
B00703935-I1-PL
04/27/2022
Filed — Alteration
INSTALL NEW 10" B-VENT CHIMNEY AS PER PLANS.
B00704098-I1
04/26/2022
Filed — Alteration
REPLACE GAS BOILER AND TWO (2) GAS WATER HEATERS.
B00703935-I1
03/23/2022
Special inspection requirement — Chimneys and vents
LOUIS ARENA
03/22/2022
Special inspection requirement — Final
LOUIS ARENA
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offU.S. CHIMNEY CORP06/02/2022
DOB NOWPlumbingSigned-offCLEAN TECH MECHANICAL INC05/06/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/24/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/26/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
10/21/2022Energy Code Compliance InspectionsLOUIS ARENAprogress
03/23/2022Chimneys and ventsLOUIS ARENAspecial
03/22/2022FinalLOUIS ARENAprogress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/29/2026B00703935-P2Request digital key ↗
08/29/2026B00703935-P1Request digital key ↗
08/29/2026B00703935-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/29/2026B00703935-P1Open ↗
08/29/2026B00703935-I1Open ↗
08/29/2026B00703935-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B00703935-I1Open ↗
08/23/2026B00704098-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B00704098-I1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/29/2026B00703935-P1Open ↗
08/29/2026B00703935-I1Open ↗
08/29/2026B00703935-P2Open ↗
Showing 3 of 4 on file for this type