← Back
Two family converted from one family
143-24 FARMERS BOULEVARD
💬 Discuss this project
1920Year Built
2.5Stories
B3Building Class
R3AZoning
2,381 sfGross Floor Area
2Units
4 Open Violations 3 unresolved · 1 paperwork only ▸FDNY Report ↗
Two family converted from one family · 8,446 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralFire ProtectionGeneral
Filed — no permit issued29p · 1 filing · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEDINA DESIGN & DEVELOPMENT GROUP208/06/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AMERICAN RIGGING CORPElectrical103/21/2026
HEMNATH, BHOOWANESHWARNAUTHElectrical103/21/2026
HICKEY, DAVIDElectrical103/21/2026
Building Lifecycle
All (68)Filed (2)Violation (5)Objection (31)Special Inspection (30)
03/24/2026
Objection resolved — Resolved
03/24/2026
Objection resolved — Resolved
03/24/2026
Objection resolved — Resolved
03/24/2026
Objection resolved — Resolved
03/24/2026
Objection resolved — Resolved
02/05/2026
Objection resolved — Addressed
02/05/2026
Objection resolved — Addressed
09/27/2025
Objection resolved — Addressed
09/27/2025
Objection resolved — Addressed
09/27/2025
Objection resolved — Resolved
09/27/2025
Objection resolved — Addressed
09/27/2025
Objection resolved — Addressed
09/27/2025
Objection resolved — Addressed
09/27/2025
Objection resolved — Addressed
09/05/2025
Objection raised — Plumbing
09/05/2025
Objection raised — Plumbing
09/05/2025
Objection raised — Plumbing
09/05/2025
Objection raised — Zoning
09/05/2025
Objection raised — Zoning
09/05/2025
Objection raised — Zoning
09/05/2025
Objection raised — Energy
09/05/2025
Objection raised — Energy
09/05/2025
Objection raised — Ventilation
09/05/2025
Objection raised — Scope
09/05/2025
Objection raised — Scope
09/05/2025
Objection raised — Zoning
09/05/2025
Objection raised — Zoning
09/05/2025
Objection raised — Structural
09/05/2025
Objection raised — Ventilation
09/05/2025
Objection raised — Zoning
09/05/2025
Objection raised — Zoning
08/06/2025
Filed — Alteration
Full Building Renovation and Horizontal Enlargement: Window Replacement, Code Compliance, and Utility Removals
Q01227283-S1
08/06/2025
Filed — Alteration
Full Building Renovation and Horizontal Enlargement: Window Replacement, Code Compliance, and Utility Removals
Q01227283-I1
08/06/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
08/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
08/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
08/06/2025
Special inspection requirement — Maintenance information
08/06/2025
Special inspection requirement — Metering
08/06/2025
Special inspection requirement — Permanent certificate
08/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
05/16/2025
Special inspection requirement — Energy Code Compliance Inspections
05/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
05/16/2025
Special inspection requirement — Preliminary
05/16/2025
Special inspection requirement — Final
05/16/2025
Special inspection requirement — Lighting in dwelling units
05/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
05/16/2025
Special inspection requirement — Electric vehicle service equipment requirements
05/16/2025
Special inspection requirement — Air barrier — testing
05/16/2025
Special inspection requirement — Maintenance information
05/16/2025
Special inspection requirement — Exterior lighting power
05/16/2025
Special inspection requirement — Fenestration areas
05/16/2025
Special inspection requirement — Air barrier - visual inspection
05/16/2025
Special inspection requirement — Fenestration air leakage
05/16/2025
Special inspection requirement — Interior lighting power
05/16/2025
Special inspection requirement — Metering
05/16/2025
Special inspection requirement — Permanent certificate
05/16/2025
Special inspection requirement — Air barrier continuity plan testing
05/16/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
05/16/2025
Special inspection requirement — Protection of exposed foundation insulation
Latest 60 of 68 events.
Nothing on file for this building.
1 project · most recent 08/06/2025
Water/Sanitary
FiledStatusContractorScope
08/06/2025——Water/Sanitary
1 project · most recent 08/06/2025
Wood
FiledStatusContractorScope
08/06/2025——Wood
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
08/06/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
08/06/2025Fire-Resistant Penetrations and Joints—special
08/06/2025HVAC-R and service water heating equipment—energy_progress
08/06/2025HVAC-R and service water piping design and insulation—energy_progress
08/06/2025Maintenance information—energy_progress
08/06/2025Metering—energy_progress
08/06/2025Permanent certificate—energy_progress
08/06/2025HVAC-R and service water heating system controls—energy_progress
05/16/2025Energy Code Compliance Inspections—progress
05/16/2025Fire-Resistance Rated Construction—progress
05/16/2025Preliminary—progress
05/16/2025Final—progress
05/16/2025Lighting in dwelling units—energy_progress
05/16/2025Fenestration and door U-factor and product ratings—energy_progress
05/16/2025Electric vehicle service equipment requirements—energy_progress
05/16/2025Air barrier — testing —energy_progress
05/16/2025Maintenance information—energy_progress
05/16/2025Exterior lighting power—energy_progress
05/16/2025Fenestration areas—energy_progress
05/16/2025Air barrier - visual inspection—energy_progress
05/16/2025Fenestration air leakage—energy_progress
05/16/2025Interior lighting power—energy_progress
05/16/2025Metering—energy_progress
05/16/2025Permanent certificate—energy_progress
05/16/2025Air barrier continuity plan testing—energy_progress
Latest 25 of 34.
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/19/2026Q01227283-I1Request digital key ↗
08/14/2026Q01227283-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/19/2026Q01227283-I1Open ↗
08/13/2026Q01227283-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01227283-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/19/2026Q01227283-I1Open ↗
08/19/2026Q01227283-S1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/19/2026Q01227283-I1Open ↗
08/14/2026Q01227283-S1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01227283-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q01227283-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01227283-I1Open ↗