← Back
BuildNYC
Cape Cod
143-25 HOOVER AVENUE
QUEENS · BIN 4208512
💬 Discuss this project
1940Year Built
1.5Stories
A0Building Class
R1-2Zoning
813 sfGross Floor Area
1Units
Rent Stabilized1 Active Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Cape Cod · 4,408 sf lot · 0.18 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 220p · 2 filings · 20 docs
Floor 121p · 2 filings · 20 docs
Cellar13p · 1 filing · 9 docs
Site & exterior11p · 1 filing · 9 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/29/2015$550K—Private party → Private party$677/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Haym S. Gross, Architect503/12/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
H Building ManagementGeneral Contractor603/21/2026
Kishan PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rike Tech Associates2965503/12/2025
Building Lifecycle
08/18/2026
Planting requirement at front yard noted; planting area was removed and replaced with pavers. Front yard is contrary to zr for R1-2 district.;…
ECB violation · open
04/22/2025
Closed: Work without a permit: completed 2ND floors additions with unfinished electrical exposure with column supports, rear new porch with glass railing,…
DOB violation · closed on the city's record
04/11/2025
Signed off — Alteration
plumbing
Q01052991-I1
04/07/2025
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/07/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
60 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offH Building Management03/10/2025
DOB NOWPlumbingSigned-offN and S Plumbing10/30/2024
DOB NOWStructuralSigned-offH Building Management10/23/2024
1 project · most recent 09/13/2024
General Wiring
FiledStatusContractorScope
09/13/2024CompleteJoseph Weinstein ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/07/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/07/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/03/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
04/03/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/14/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/06/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
03/28/2025Fire-Resistant Penetrations and JointsSYED RIZVIspecial
03/28/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesSYED RIZVIspecial
03/28/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSYED RIZVIspecial
03/11/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesSYED RIZVIspecial
03/11/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSYED RIZVIspecial
03/11/2025Fire-Resistant Penetrations and JointsSYED RIZVIspecial
12/26/2024Fenestration and door U-factor and product ratingsHAYM GROSSenergy_progress
12/26/2024Fenestration air leakageHAYM GROSSenergy_progress
12/26/2024Air barrier - visual inspectionHAYM GROSSenergy_progress
12/26/2024Insulation placement and R valuesHAYM GROSSenergy_progress
12/26/2024Structural Stability – Alterations of existing buildingsSYED RIZVIspecial
12/26/2024Fenestration areasHAYM GROSSenergy_progress
12/26/2024Fire-Resistant Penetrations and JointsSYED RIZVIspecial
12/26/2024Structural Wood FrameSYED RIZVIprogress
12/26/2024Energy Code Compliance InspectionsHAYM GROSSprogress
12/26/2024Fire-Resistance Rated ConstructionSYED RIZVIprogress
12/26/2024FinalHAYM GROSSprogress
11/08/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesSYED RIZVIspecial
11/08/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSYED RIZVIspecial
11/08/2024Fire-Resistant Penetrations and JointsSYED RIZVIspecial
31 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account