← Back
Two stories - detached, small or mid-size
143-31 HOOVER AVENUE
QUEENS · Jamaica Hills-Briarwood · BIN 4208510
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R1-2Zoning
1,884 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Roof13p · 2 filings · 20 docs
Floor 231p · 1 filing · 20 docs
Floor 129p · 1 filing · 20 docs
Cellar22p · 1 filing · 20 docs
Site & exterior13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FRSS GROUP303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AA BLDG & INSP SVC LLC506/03/2026
BORIS BALKHIYEV, PE105/04/2025
RAS PE CONSULTING ENGINEERS310/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Advanced Solar Solutions103/21/2026
DMCONSULTING6860603/21/2026
Mdl consulting services303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRSS GROUP CORPGeneral Contractor707/08/2026
ADVANCED SOLAR SOLUTIONSGeneral Contractor203/21/2026
ALL PRO PLBG & HTG INCPlumbing207/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323706/03/2026
MB INSPECTIONS, CORP.8703105/04/2025
Building Lifecycle
All (87)Filed (9)Permit Issued (9)Signed Off (6)Violation (6)Inspection (5)Objection (22)Special Inspection (30)
07/14/2026
Signed off — Alteration
Q01052195-I1
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM ALICEA
06/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM ALICEA
06/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM ALICEA
06/30/2026
Special inspection requirement — Permanent certificate
WILLIAM ALICEA
06/30/2026
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM ALICEA
06/30/2026
Special inspection requirement — Maintenance information
WILLIAM ALICEA
06/30/2026
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM ALICEA
06/04/2026
Signed off — Alteration
Herewith filing structural * partial demolition plans of 2-story ALT-1 building filed in conjunction with job # Q01065694-I1. The proposed STR involves timber framing over steel frame & stud walls.
Q01065694-I1
06/03/2026
Filed — Alteration
Herewith filing structural * partial demolition plans of 2-story ALT-1 building filed in conjunction with job # Q01065694-I1. The proposed STR involves timber framing over steel frame & stud walls.
Q01065694-P2
06/02/2026
Signed off — Alteration
Herewith filing structural * partial demolition plans of 2-story ALT-1 building filed in conjunction with job # Q01065694-I1. The proposed STR involves timber framing over steel frame & stud walls.
Q01065694-S2
05/28/2026
Signed off — Alteration
SOLAR TAX INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Q01219359-I1
04/23/2026
Filed — Alteration
Herewith filing structural * partial demolition plans of 2-story ALT-1 building filed in conjunction with job # Q01065694-I1. The proposed STR involves timber framing over steel frame & stud walls.
Q01065694-P1
04/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM ALICEA
04/23/2026
Special inspection requirement — Permanent certificate
WILLIAM ALICEA
04/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM ALICEA
04/23/2026
Special inspection requirement — Maintenance information
WILLIAM ALICEA
04/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM ALICEA
04/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM ALICEA
04/23/2026
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM ALICEA
04/14/2026
Permit issued — Plumbing
Q01065694-S4-PL
11/13/2025
Signed off — Alteration
Herewith filing structural * partial demolition plans of 2-story ALT-1 building filed in conjunction with job # Q01065694-I1. The proposed STR involves timber framing over steel frame & stud walls.
Q01065694-S1
11/13/2025
Signed off — Alteration
Herewith filing structural * partial demolition plans of 2-story ALT-1 building filed in conjunction with job # Q01065694-I1. The proposed STR involves timber framing over steel frame & stud walls.
Q01065694-S3
05/30/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/30/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/30/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/15/2025
Permit issued — Solar
Q01219359-I1-SL
05/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/04/2025
Filed — Alteration
SOLAR TAX INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
Q01219359-I1
04/02/2025
Violation issued (ECB, closed)
Construction
04/02/2025
Violation issued (ECB, closed)
Construction
04/02/2025
Violation issued (ECB, closed)
Unknown
01/17/2025
Permit issued — Support of Excavation
Q01065694-S1-SE
01/16/2025
Permit issued — Foundation
Q01065694-S2-FO-EA
12/24/2024
Permit issued — Construction Fence
Q01052195-I1-FN
12/24/2024
Permit issued — Mechanical Systems
Q01065694-I1-GC
12/24/2024
Permit issued — Plumbing
Q01065694-S4-PL
12/24/2024
Permit issued — General Construction
Q01065694-I1-MS
12/24/2024
Permit issued — Structural
Q01065694-S3-ST
10/21/2024
Special inspection requirement — Structural Steel - Details
WILLIAM ALICEA
10/21/2024
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM ALICEA
10/21/2024
Special inspection requirement — Structural Steel - High Strength Bolting
WILLIAM ALICEA
10/21/2024
Special inspection requirement — Structural Steel - Welding
WILLIAM ALICEA
10/04/2024
Filed — Alteration
Herewith filing structural * partial demolition plans of 2-story ALT-1 building filed in conjunction with job # Q01065694-I1. The proposed STR involves timber framing over steel frame & stud walls.
Q01065694-S2
10/04/2024
Filed — Alteration
Herewith filing structural * partial demolition plans of 2-story ALT-1 building filed in conjunction with job # Q01065694-I1. The proposed STR involves timber framing over steel frame & stud walls.
Q01065694-S1
10/04/2024
Filed — Alteration
Herewith filing structural * partial demolition plans of 2-story ALT-1 building filed in conjunction with job # Q01065694-I1. The proposed STR involves timber framing over steel frame & stud walls.
Q01065694-S3
10/03/2024
Filed — Alteration
Herewith filing structural * partial demolition plans of 2-story ALT-1 building filed in conjunction with job # Q01065694-I1. The proposed STR involves timber framing over steel frame & stud walls.
Q01065694-S4
09/25/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
FAHAD FATEH
09/25/2024
Special inspection requirement — Footing and Foundation
WILLIAM ALICEA
09/25/2024
Special inspection requirement — Final
WILLIAM ALICEA
09/25/2024
Special inspection requirement — Final
HAYM GROSS
09/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
WILLIAM ALICEA
09/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
WILLIAM ALICEA
09/25/2024
Special inspection requirement — Concrete - Cast-In-Place
WILLIAM ALICEA
09/25/2024
Special inspection requirement — Subgrade Inspections
WILLIAM ALICEA
09/18/2024
Objection raised — Other
09/18/2024
Objection resolved — Addressed
09/09/2024
Objection resolved — Addressed
08/19/2024
Objection resolved — Addressed
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC04/14/2026
DOB NOWSolarSigned-offADVANCED SOLAR SOLUTIONS05/15/2025
DOB NOWSupport of ExcavationSigned-offFRSS GROUP01/17/2025
DOB NOWFoundationSigned-offFRSS GROUP01/16/2025
DOB NOWConstruction FenceSigned-offFRSS GROUP12/24/2024
DOB NOWMechanical SystemsSigned-offFRSS GROUP12/24/2024
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC12/24/2024
DOB NOWGeneral ConstructionSigned-offFRSS GROUP12/24/2024
DOB NOWStructuralSigned-offFRSS GROUP12/24/2024
BISPLISSUEDFIRST CHOICE PLG09/16/2008
BISOTISSUEDN/A03/28/2006
1 project · most recent 06/03/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/03/2026Signed-offFRSS GROUP CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric M4H36W06060615-B 40,000 BTU ×2
Heating
Mitsubishi Electric M4H36W06060615-B 38,000 BTU ×2
Ventilation
Mitsubishi Electric M4H36W06060615-B 38,000 BTU ×2
2 projects · most recent 04/30/2025
General Wiring
FiledStatusContractorScope
04/30/2025CompleteSOURCE ELECTRIC INC1 meters
01/04/2025CompleteKINGS ELECTRIC CO., INC.General Wiring
1 project · most recent 06/03/2026
Wood
FiledStatusContractorScope
06/03/2026Signed-offALL PRO PLBG & HTG INCWood
1 project · most recent 05/04/2025
FiledStatusContractorScope
05/04/2025Signed-offADVANCED SOLAR SOLUTIONS26 panels, 14.3 kw, 1,067.12 roof_area_sqft
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/30/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/30/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
06/30/2026Fire-Resistant Penetrations and JointsWILLIAM ALICEAspecial
06/30/2026HVAC-R and service water heating equipmentWILLIAM ALICEAenergy_progress
06/30/2026HVAC-R and service water piping design and insulationWILLIAM ALICEAenergy_progress
06/30/2026Permanent certificateWILLIAM ALICEAenergy_progress
06/30/2026HVAC-R and service water heating system controlsWILLIAM ALICEAenergy_progress
06/30/2026Maintenance informationWILLIAM ALICEAenergy_progress
06/30/2026Energy Code Compliance InspectionsWILLIAM ALICEAprogress
04/23/2026Fire-Resistant Penetrations and JointsWILLIAM ALICEAspecial
04/23/2026Permanent certificateWILLIAM ALICEAenergy_progress
04/23/2026HVAC-R and service water heating system controlsWILLIAM ALICEAenergy_progress
04/23/2026Maintenance informationWILLIAM ALICEAenergy_progress
04/23/2026HVAC-R and service water heating equipmentWILLIAM ALICEAenergy_progress
04/23/2026HVAC-R and service water piping design and insulationWILLIAM ALICEAenergy_progress
04/23/2026Energy Code Compliance InspectionsWILLIAM ALICEAprogress
10/21/2024Structural Steel - DetailsWILLIAM ALICEAspecial
10/21/2024Concrete - Cast-In-PlaceWILLIAM ALICEAspecial
10/21/2024Structural Steel - High Strength BoltingWILLIAM ALICEAspecial
10/21/2024Structural Steel - WeldingWILLIAM ALICEAspecial
09/25/2024Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
09/25/2024Footing and FoundationWILLIAM ALICEAprogress
09/25/2024FinalWILLIAM ALICEAprogress
09/25/2024FinalHAYM GROSSprogress
09/25/2024Structural Stability – Alterations of existing buildingsWILLIAM ALICEAspecial
09/25/2024Structural Stability – Alterations of existing buildingsWILLIAM ALICEAspecial
09/25/2024Concrete - Cast-In-PlaceWILLIAM ALICEAspecial
Latest 25 of 48.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/22/2026Q01052195-I1Request digital key ↗
08/20/2026Q01219359-I1Request digital key ↗
08/16/2026Q01065694-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01065694-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 21
08/13/2026Q01065694-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026Q01065694-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 11
08/13/2026Q01065694-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature10
09/01/2026Q01065694-P1Open ↗
09/01/2026Q01065694-P1Open ↗
09/01/2026Q01065694-S3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/22/2026Q01052195-I1Open ↗
08/20/2026Q01219359-I1Open ↗
08/16/2026Q01065694-S3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026Q01065694-P1Open ↗
09/01/2026Q01065694-S3Open ↗
08/26/2026Q01065694-S2Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/16/2026Q01065694-P2Open ↗
08/16/2026Q01065694-P1Open ↗
08/16/2026Q01065694-S4Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026Q01065694-S2Open ↗
08/13/2026Q01065694-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q01065694-S2Open ↗
08/13/2026Q01065694-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01219359-I1Open ↗
▸Other Documents5
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q01065694-S2Open ↗
08/13/2026Q01065694-S1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01065694-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01065694-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026Q01065694-I1Open ↗