← Back
BuildNYC
Two stories - detached, small or mid-size
143-31 HOOVER AVENUE
QUEENS · BIN 4208510
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R1-2Zoning
1,884 sfGross Floor Area
1Units
0 Active ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 4,000 sf lot · 0.47 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofYaggy DMC HVAC-R and service water piping12p · 2 filings · 20 docs
Floor 2Yaggy DMC HVAC-R and service water piping30p · 1 filing · 20 docs
Floor 1Yaggy DMC HVAC-R and service water piping28p · 1 filing · 20 docs
CellarYaggy DMC HVAC-R and service water piping21p · 1 filing · 20 docs
Site & exteriorYaggy DMC HVAC-R and service water piping13p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AA Building & Inspection Service506/03/2026
Boris Balkhiyev, PE105/04/2025
RAS PE Consulting Engineers310/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Advanced Solar Solutions103/21/2026
Dmconsulting6860603/21/2026
MDL consulting services403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FRSS GroupGeneral Contractor607/08/2026
All Pro Plumbing & HeatingPlumbing207/02/2026
Advanced Solar Solutionsspecialty_contractor203/21/2026
FRSS GroupScaffold104/09/2026
FRSS Groupspecialty_contractor104/09/2026
First Choice PLGPlumbing109/16/2008
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
World Design Architecture9323706/03/2026
MB Inspections8703105/04/2025
Building Lifecycle
10/30/2026
Signed off — Alteration
Herewith filing structural * partial demolition plans of 2-story ALT-1 building filed in conjunction with job # Q01065694-I1. The proposed STR involves timber framing over steel frame & stud walls.
Q01065694-S4
07/14/2026
Signed off — Alteration
Q01052195-I1
06/30/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM ALICEA
06/30/2026
Special inspection requirement — HVAC-R and service water heating equipment
WILLIAM ALICEA
06/30/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM ALICEA
80 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAll Pro Plumbing & Heating04/14/2026
DOB NOWSolarSigned-offAdvanced Solar Solutions05/15/2025
DOB NOWSupport of ExcavationSigned-offFRSS Group01/17/2025
DOB NOWFoundationSigned-offFRSS Group01/16/2025
DOB NOWMechanical SystemsSigned-offFRSS Group12/24/2024
DOB NOWStructuralSigned-offFRSS Group12/24/2024
DOB NOWConstruction FenceSigned-offFRSS Group12/24/2024
DOB NOWPlumbingSigned-offAll Pro Plumbing & Heating12/24/2024
DOB NOWGeneral ConstructionSigned-offFRSS Group12/24/2024
BISPLISSUEDFirst Choice PLG09/16/2008
BISOTISSUEDN/A03/28/2006
1 project · most recent 06/03/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScope
06/03/2026Signed-offFRSS GroupAir Conditioning Systems, Heating Systems, Ventilation Systems
2 projects · most recent 04/30/2025
General Wiring
FiledStatusContractorScope
04/30/2025CompleteSource Electric—
01/04/2025CompleteKings ElectricGeneral Wiring
1 project · most recent 06/03/2026
Wood
FiledStatusContractorScope
06/03/2026Signed-offAll Pro Plumbing & HeatingWood
1 project · most recent 05/04/2025
FiledStatusContractorScope
05/04/2025Signed-offAdvanced Solar Solutions—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/30/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/30/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/30/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
06/30/2026Fire-Resistant Penetrations and JointsWILLIAM ALICEAspecial
06/30/2026HVAC-R and service water heating equipmentWILLIAM ALICEAenergy_progress
06/30/2026HVAC-R and service water piping design and insulationWILLIAM ALICEAenergy_progress
06/30/2026Permanent certificateWILLIAM ALICEAenergy_progress
06/30/2026HVAC-R and service water heating system controlsWILLIAM ALICEAenergy_progress
06/30/2026Maintenance informationWILLIAM ALICEAenergy_progress
06/30/2026Energy Code Compliance InspectionsWILLIAM ALICEAprogress
04/23/2026Fire-Resistant Penetrations and JointsWILLIAM ALICEAspecial
04/23/2026Maintenance informationWILLIAM ALICEAenergy_progress
04/23/2026HVAC-R and service water heating equipmentWILLIAM ALICEAenergy_progress
04/23/2026HVAC-R and service water piping design and insulationWILLIAM ALICEAenergy_progress
04/23/2026Energy Code Compliance InspectionsWILLIAM ALICEAprogress
04/23/2026Permanent certificateWILLIAM ALICEAenergy_progress
04/23/2026HVAC-R and service water heating system controlsWILLIAM ALICEAenergy_progress
10/21/2024Structural Steel - WeldingWILLIAM ALICEAspecial
10/21/2024Structural Steel - High Strength BoltingWILLIAM ALICEAspecial
10/21/2024Structural Steel - DetailsWILLIAM ALICEAspecial
10/21/2024Concrete - Cast-In-PlaceWILLIAM ALICEAspecial
09/25/2024Concrete - Cast-In-PlaceWILLIAM ALICEAspecial
09/25/2024Structural Stability – Alterations of existing buildingsWILLIAM ALICEAspecial
09/25/2024Subgrade InspectionsWILLIAM ALICEAspecial
09/25/2024Subsurface Investigations (Borings/Test Pits)FAHAD FATEHspecial
09/25/2024FinalHAYM GROSSprogress
09/25/2024Footing and FoundationWILLIAM ALICEAprogress
09/25/2024Structural Stability – Alterations of existing buildingsWILLIAM ALICEAspecial
Latest 25 of 48.
68 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account