← Back
BuildNYC
Two family converted from one family
143-40 FRANKLIN AVENUE
QUEENS · BIN 4117111
💬 Discuss this project
1920Year Built
2Stories
B3Building Class
R3XZoning
1,342 sfGross Floor Area
2Units
Two family converted from one family · 6,900 sf lot · 0.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction6p · 1 filing · 20 docs
Floor 2Under Construction2p · 1 filing · 20 docs
Floor 1
CellarUnder Construction15p · 1 filing · 20 docs
Site & exteriorChen's ResidencyUnder Construction12p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/14/2026$1.7M—THE JOAN M. DAMIAN TRUST → Private party$1,282/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Arc Consulting Engineers1011/06/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HY Design & DevelopmentGeneral Contractor111/08/2026
Polar ContractingGeneral Contractor109/22/2026
L&L Construction DevelopmentScaffold111/08/2026
Polar ContractingScaffold109/07/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Arc Consulting Engineers4083307/17/2026
Building Lifecycle
11/12/2026
Objection resolved — Resolved
11/10/2026
Objection raised — Other
11/09/2026
Permit issued — Support of Excavation
Q01410922-S4-SE
11/06/2026
Filed — New Building
PROPOSED TWO STORY WITH ATTIC, TWO (2) RESIDENTIAL FAMILY NEW BUILDING. AS PER PLAN, OBTAIN CERTIFICATE OF OCCUPANCY.
Q01410922-S7
11/06/2026
Filed — New Building
PROPOSED TWO STORY WITH ATTIC, TWO (2) RESIDENTIAL FAMILY NEW BUILDING. AS PER PLAN, OBTAIN CERTIFICATE OF OCCUPANCY.
Q01410922-S3
72 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationPermit IssuedHY Design & Development11/09/2026
DOB NOWFoundationPermit IssuedHY Design & Development11/06/2026
DOB NOWConstruction FencePermit IssuedL&L Construction Development11/04/2026
DOB NOWFull DemolitionSigned-offPolar Contracting09/21/2026
DOB NOWConstruction FencePermit IssuedPolar Contracting09/03/2026
1 project · most recent 11/06/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
11/06/2026Permit IssuedHY Design & DevelopmentHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 11/06/2026
Storm Water/Sanitary
FiledStatusContractorScope
11/06/2026——Storm, Water/Sanitary
1 project · most recent 10/28/2026
General Wiring
FiledStatusContractorScope
10/28/2026Permit IssuedGalaxy ElectricGeneral Wiring
1 project · most recent 11/06/2026
FiledStatusContractorScope
11/06/2026Permit IssuedHY Design & Development—
1 project · most recent 05/28/2026
Fence
FiledStatusContractorScope
05/28/2026Permit IssuedL&L Construction DevelopmentFence
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
07/15/2026Lighting controls—energy_progress
07/14/2026Excavations - Sheeting, Shoring, and Bracing—special
07/14/2026Structural Stability – Alterations of existing buildings—special
07/14/2026Subgrade Inspections—special
07/14/2026Subsurface Conditions – Fill Placement & In-Place Density—special
07/13/2026Concrete - Cast-In-Place—special
07/13/2026Structural Stability – Alterations of existing buildings—special
07/13/2026Structural Steel - Details—special
07/13/2026Structural Steel - High Strength Bolting—special
07/13/2026Structural Steel - Welding—special
06/11/2026Energy Code Compliance Inspections—progress
06/11/2026Maintenance information—energy_progress
06/11/2026HVAC-R and service water piping design and insulation—energy_progress
06/11/2026HVAC-R and service water heating equipment—energy_progress
06/11/2026HVAC-R and service water heating system controls—energy_progress
06/11/2026Fire-Resistant Penetrations and Joints—special
06/11/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
06/10/2026Fire-Resistance Rated Construction—progress
06/10/2026Concrete - Cast-In-Place—special
06/10/2026Fire-Resistant Penetrations and Joints—special
06/10/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
06/10/2026Energy Code Compliance Inspections—progress
06/10/2026Metering—energy_progress
06/10/2026Air barrier — testing —energy_progress
06/10/2026Permanent certificate—energy_progress
Latest 25 of 35.
25 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account