HPD09/13/2000SECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES KITCHEN AND BATHROOM. IN THE ENTIRE APARTMENT LOCATED AT APT 1, 2nd STORY
ECB12/30/2016FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. TIME OF INSP 10:10AM, @ TIME OF INSP IN CELLAR I OBSERVED UNION-PROHIBITED MATERIAL ON GAS LINE FOR 1ST FLR APT. OBSERVED IN CELLAR CLOSE TO BOILER OPEN ENDEDNothing owed — awaiting certificate of correction
ECB11/23/2011WORK W/O PERMIT.WORK NOTED:@ REAR YARD OF PREMISES,A WOODEN FRAME CANOPY ERECTED APPROX 28'L X20'W & 15'H W/ WOODEN COLUMNS INSTALLED INTO A CONCRETE BASE.ALSO NEW ELECTRICAL WORK INSTALLED.CANOPY IS BEING USEDNothing owed — awaiting certificate of correction
ECB07/12/2005FAILURE TO MAINTAIN BUILDING DEFECTS ARE (1) AT REAR OF GARAGE APPROX 100 SQ FT OF SHEETROCK ON CEILING HAS COLLAPSED DUE TO LEAKING ROOF WOODEN ROOFTENS EXPOSED (2) AT FRONT END OF GARAGE CONCRETE FLOORNothing owed — awaiting certificate of correction
Locations of Work
No floor-level scope or drawing coverage on file for this building.