0 Open ViolationsFDNY Report ↗
Flood zone X500
Locations of Work
ArchitectureFire Protection
Roof1p · 1 filing · 10 docs
Floor 11p · 1 filing · 10 docs
Cellar1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
155 DEVELOPERS1807/08/2026
KAIETEUR CONSTRUCTION203/22/2026
229 STREET DEVELOPERS503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC208/13/2025
MOMENTUM SOLAR207/18/2025
SIDERIS KEFALAS ENGINEERS PC209/18/2023
SION CONSULTING ENGINEERING PC304/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING803/21/2026
KAMTECH RESTORATION CORP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KAIETEUR CONSTRUCTION INC.General Contractor307/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing207/08/2026
KAMTECH RESTORATION CORPGeneral Contractor107/08/2026
LG ELITE PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854208/13/2025
MXV SIA LLC9281207/18/2025
SION CONSULTING ENG. PC1108409/18/2023
Building Lifecycle
All (51)Filed (9)Permit Issued (7)Signed Off (6)Violation (2)Inspection (7)Special Inspection (20)
09/24/2025
Signed off — Alteration
Q01210467-I1
09/16/2025
Special inspection requirement — Final
TOM PETERSEN
09/16/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
09/16/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
09/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
09/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
09/15/2025
Signed off — Alteration
Q01090485-I1
08/13/2025
Filed — Alteration
Q01210467-P1
07/18/2025
Filed — Alteration
Q01090485-P1
07/18/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
07/18/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
07/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
07/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
07/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
07/18/2025
Special inspection requirement — Final
Mina Makar
07/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
07/18/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
07/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
07/18/2025
Special inspection requirement — Final
Mina Makar
04/16/2025
Permit issued — Solar
Q01210467-I1-SL
04/14/2025
Filed — Alteration
Q01210467-I1
08/30/2024
Permit issued — Solar
Q01090485-I1-SL
08/27/2024
Filed — Alteration
Q01090485-I1
03/12/2024
Signed off — Alteration
Q00685600-I1
03/12/2024
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM (WITH LESS THAN 30 HEADS) AND ALSO PLUMBING FIXTURES AND PLUMBING PIPING FOR NEW 2-FAMILY BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # 440660027.
Q00476503-S1
02/27/2024
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM (WITH LESS THAN 30 HEADS) AND ALSO PLUMBING FIXTURES AND PLUMBING PIPING FOR NEW 2-FAMILY BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # 440660027.
Q00476503-I1
10/16/2023
Permit issued — Plumbing
Q00476503-I1-PL
09/22/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
09/22/2023
Special inspection requirement — HVAC-R and service water heating system controls
sion hourizadeh
09/22/2023
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
09/22/2023
Special inspection requirement — Maintenance information
sion hourizadeh
09/22/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
sion hourizadeh
09/18/2023
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM (WITH LESS THAN 30 HEADS) AND ALSO PLUMBING FIXTURES AND PLUMBING PIPING FOR NEW 2-FAMILY BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # 440660027.
Q00476503-P1
08/22/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
06/30/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/17/2023
Violation issued (ECB, closed)
Construction
06/16/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/08/2023
Permit issued — Plumbing
Q00476503-S1-PL
04/21/2023
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM (WITH LESS THAN 30 HEADS) AND ALSO PLUMBING FIXTURES AND PLUMBING PIPING FOR NEW 2-FAMILY BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # 440660027.
Q00476503-S1
03/24/2023
Permit issued — Earth Work
Q00685600-I1-FO-EA
11/21/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
11/21/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
11/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/21/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/05/2022
Signed off — Alteration
Q00664503-I1
09/22/2022
Violation issued (ECB, closed)
Construction
09/21/2022
Permit issued — Plumbing
Q00476503-I1-PL
02/25/2022
Filed — Alteration
Q00685600-I1
01/26/2022
Permit issued — Construction Fence
Q00664503-I1-FN
01/20/2022
Filed — Alteration
Q00664503-I1
04/22/2021
Filed — Alteration
INSTALLATION OF SPRINKLER SYSTEM (WITH LESS THAN 30 HEADS) AND ALSO PLUMBING FIXTURES AND PLUMBING PIPING FOR NEW 2-FAMILY BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING, BIS # 440660027.
Q00476503-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offKAMTECH RESTORATION CORP04/16/2025
DOB NOWSolarSigned-offMOMENTUM SOLAR08/30/2024
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT10/16/2023
DOB NOWPlumbingSigned-offLG ELITE PLUMBING INC06/08/2023
DOB NOWEarth WorkSigned-offKAIETEUR CONSTRUCTION INC03/24/2023
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT09/21/2022
DOB NOWConstruction FenceSigned-offKAIETEUR CONSTRUCTION INC01/26/2022
BIS—ISSUEDKAIETEUR CONSTRUCTION INC.02/27/2023
BIS—ISSUEDKAIETEUR CONSTRUCTION INC.08/04/2022
BIS—ISSUEDKAIETEUR CONSTRUCTION INC.02/28/2022
BIS—ISSUEDKAIETEUR CONSTRUCTION INC.02/01/2022
3 projects · most recent 04/10/2025
General Wiring
FiledStatusContractorScope
04/10/2025CompleteBERGER QUALITY ELEC'L CON—
08/02/2024CompleteISLAND ELECTRIC CORP—
12/19/2023CompleteLENS ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
08/22/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
06/30/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/16/2023Pass-Final PL - UndergroundPassView ↗
11/21/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/21/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/21/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/21/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
09/16/2025FinalTOM PETERSENprogress
09/16/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
09/16/2025Energy Code Compliance InspectionsTOM PETERSENprogress
09/16/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
09/16/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
07/18/2025Air barrier - visual inspectionMina Makarenergy_progress
07/18/2025Air barrier - visual inspectionMina Makarenergy_progress
07/18/2025Fire-Resistant Penetrations and JointsMina Makarspecial
07/18/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
07/18/2025Energy Code Compliance InspectionsMina Makarprogress
07/18/2025FinalMina Makarprogress
07/18/2025Fire-Resistant Penetrations and JointsMina Makarspecial
07/18/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
07/18/2025Energy Code Compliance InspectionsMina Makarprogress
07/18/2025FinalMina Makarprogress
09/22/2023HVAC-R and service water piping design and insulationsion hourizadehenergy_progress
09/22/2023HVAC-R and service water heating system controlssion hourizadehenergy_progress
09/22/2023HVAC-R and service water heating equipmentsion hourizadehenergy_progress
09/22/2023Maintenance informationsion hourizadehenergy_progress
09/22/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationsion hourizadehspecial
▾Documents — 143 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch7
08/27/2026Q00476503-S1Request digital key ↗
08/26/2026Q00664503-I1Request digital key ↗
08/26/2026Q00685600-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/27/2026Q00476503-P1Request digital key ↗
08/27/2026Q00476503-I1Request digital key ↗
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION6
04/29/2024440660027Open ↗
03/20/2024440660027Open ↗
10/31/2023440660027Open ↗
Showing 3 of 6 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/27/2023440660027Open ↗
▸BISWORK PERMIT APPLICATION1
02/01/2022440660027Open ↗
▸Zoning, Tax Lot & Property Records5
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
02/18/2021440660027Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
11/10/2021440660027Open ↗
▸BISVERIFY TAX LOT1
03/05/2024440660027Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/13/2024440660027Open ↗
▸BISZONING DIAGRAM1
11/09/2021440660027Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026Q00476503-I1Open ↗
08/26/2026Q00664503-I1Open ↗
08/20/2026Q01210467-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/14/2026Q01090485-P1Open ↗
09/14/2026Q01090485-P1Open ↗
09/01/2026Q01090485-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/14/2026Q01090485-P1Open ↗
09/01/2026Q01090485-I1Open ↗
08/25/2026Q00476503-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/18/2021440660027Open ↗
▸Trade Schedules & Equipment11
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
05/10/2024440660027Open ↗
05/09/2024440660027Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
03/05/2024440660027Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
03/05/2024440660027Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
08/25/2021440660027Open ↗
▸BISSPRINKLER SYSTEMS1
03/05/2024440660027Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
03/05/2024440660027Open ↗
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
05/10/2024440660027Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
03/05/2024440660027Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
05/10/2024440660027Open ↗
▸BISHEATING SYSTEMS1
03/05/2024440660027Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
03/24/2021440660027Open ↗
02/26/2021440660027Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
08/25/2021440660027Open ↗
▸BISSTREET TREE SIGNOFF1
03/05/2024440660027Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
01/18/2022440660027Open ↗
01/18/2022440660027Open ↗
03/14/2021440660027Open ↗
Showing 3 of 5 on file for this type
▸BISAIR SEALING AND INSULATION - VISUAL1
03/05/2024440660027Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
03/24/2021440660027Open ↗
▸BISINTERIOR LIGHTING POWER1
03/05/2024440660027Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
03/05/2024440660027Open ↗
▸BISFENESTRATION AREAS1
03/05/2024440660027Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
03/05/2024440660027Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/05/2024440660027Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
03/05/2024440660027Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
03/05/2024440660027Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00476503-I1Open ↗
▸Inspections & Test Reports28
▸BISTECHNICAL REPORT: RESPONSIBILITY9
05/09/2024440660027Open ↗
05/09/2024440660027Open ↗
04/03/2024440660027Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION5
05/10/2024440660027Open ↗
05/10/2024440660027Open ↗
05/09/2024440660027Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
03/13/2024440660027Open ↗
01/18/2022440660027Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
03/05/2024440660027Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
05/10/2024440660027Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
03/05/2024440660027Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
03/05/2024440660027Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
03/05/2024440660027Open ↗
▸BISMASONRY1
03/05/2024440660027Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
03/05/2024440660027Open ↗
▸BISSOIL REPORT1
02/18/2021440660027Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
03/05/2024440660027Open ↗
▸BISSOIL PERC. TEST-INDIVID ON-SITE PRIVATE SEWAGE DISP.(SEPTIC)1
03/05/2024440660027Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q00685600-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00685600-I1Open ↗
▸Approvals, Objections & Sign-offs7
▸BISSCHEDULE A - OCCUPANCY / USE4
04/29/2024440660027Open ↗
05/24/2021440660027Open ↗
03/14/2021440660027Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWUtility Company Final Acceptance Letter2
08/13/2026Q01210467-I1Open ↗
08/13/2026Q01090485-I1Open ↗
▸BISCONCURRENT SIGNOFF OF 300 SQ. FT.MINIMUM ACCESSORY DETACHEDGARAGE PER PROCURED #FLOORAREA# BONUS (ZR 23-142)1
05/10/2024440660027Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION7
04/04/2024440660027Open ↗
04/03/2024440660027Open ↗
11/30/2023440660027Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
02/18/2021440660027Open ↗
▸Other Documents19
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION5
05/10/2024440660027Open ↗
08/25/2021440660027Open ↗
03/24/2021440660027Open ↗
Showing 3 of 5 on file for this type
▸BISPLOT DIAGRAM3
03/14/2021440660027Open ↗
02/26/2021440660027Open ↗
02/18/2021440660027Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
05/10/2024440660027Open ↗
05/10/2024440660027Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
05/10/2024440660027Open ↗
▸BISSITE SURVEY: INITIAL.TO INDICATE LOTSUBDIVISION LINE1
01/18/2022440660027Open ↗
▸BISMAINTENANCE INFORMATION1
03/05/2024440660027Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
03/13/2024440660027Open ↗
▸BISPERMANENT CERTIFICATE1
03/05/2024440660027Open ↗
▸BISPROTECTION OF EXPOSED FOUNDATION INSULATION1
03/05/2024440660027Open ↗
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM1
03/13/2024440660027Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
03/05/2024440660027Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00685600-I1Open ↗