1948Year Built
6Stories
D4Building Class
R6AZoning
135,102 sfGross Floor Area
110Units
LL97 CoveredRent Stabilized124 Active Violations 3 old, status unconfirmed ▸FISP: UNSAFEFDNY Report ↗
Elevator cooperative · Owner of record: 143 50 Hoover Owners · 57,742 sf lot · 2.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofOwners CorpUnder Construction5p · 2 filings · 15 docs
Floor 7Owners CorpUnder Construction2p · 1 filing · 11 docs
Floor 6Owners CorpUnder Construction2p · 1 filing · 11 docs
Floor 5Owners CorpUnder Construction2p · 1 filing · 11 docs
Floor 4Owners CorpUnder Construction2p · 1 filing · 11 docs
Floor 3Owners CorpUnder Construction2p · 1 filing · 11 docs
Floor 2Owners CorpUnder Construction2p · 1 filing · 11 docs
Floor 1Unit 1AUnder Construction7p · 4 filings · 20 docs
BasementSprinkler head replacement in laundry room3p · 1 filing · 18 docs
Sub-BasementSprinkler head replacement in laundry room8p · 1 filing · 18 docs
Site & exteriorHeavy duty sidewalk shed installationUnder Construction11p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hoover Owners1503/22/2026
First Serivce Residential103/21/2026
Spiros Construction SGC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Mahfuzar Rahman111/04/2025
Ashraf210/23/2025
Rand Engineering & Architecture110/01/2025
Kce Consulting Engineering212/12/2024
New Age301/09/2024
KMB Design Group110/02/2020
Navi Structural Engineering207/24/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rand Engineering & Arch203/21/2026
AK Consulting Services203/21/2026
Hierarch-E203/21/2026
Eurocelt Expediting403/21/2026
CCM Services Group103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Andamio ScaffoldingScaffold507/08/2026
Universal SystemsScaffold407/08/2026
Demar Plumbingspecialty_contractor203/21/2026
Safe Way ConstructionGeneral Contractor107/08/2026
Triple Square ContractingGeneral Contractor104/09/2026
Demar MechanicalPlumbing107/08/2026
Wire Electric Inst CoElectrical103/22/2026
Demar PlumbingFire Protection107/08/2026
Jacobs TelecommunGeneral Contractor107/08/2026
Pofi ConstructionGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Rand Engineering & Architects266110/01/2025
Kce Consulting Engineering3712112/12/2024
New Age Engineering7746401/09/2024
KMB Design Group513110/02/2020
Building Lifecycle
02/20/2028
Facade inspection report due (FISP Cycle 9, sub-cycle B)
The filing window opened 02/21/2026. No Cycle 9 filing on record yet
10/14/2026
Boiler inspection report filed
Initial · no defects · Accepted
09/30/2026
Elevator Category 1 inspection report filed
09/24/2026
Co-op apartment 302 sold for $225,000
09/23/2026
Filed — Alteration
Suspended Scaffold installation for facade repairs and inspections as per plans filed herewith.
Q01285934-P1
298 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedBalaton Consulting07/20/2026
DOB NOWGeneral ConstructionSigned-offTriple Square Contracting01/22/2026
DOB NOWStructuralPermit IssuedPofi Construction11/24/2025
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding11/17/2025
DOB NOWSuspended ScaffoldPermit IssuedBalaton Consulting09/29/2025
DOB NOWStructuralSigned-offSafe Way Construction01/21/2025
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding11/21/2024
DOB NOWPlumbingSigned-offDemar Mechanical02/21/2024
DOB NOWMechanical SystemsSigned-offDemar Plumbing02/13/2024
DOB NOWSprinklersSigned-offDemar Plumbing02/13/2024
DOB NOWSidewalk ShedPermit IssuedAndamio Scaffolding12/01/2023
DOB NOWAntennaSigned-offArmentum Digital Infrastr11/30/2020
DOB NOWSupported ScaffoldSigned-offUniversal Systems07/24/2018
DOB NOWSidewalk ShedSigned-offUniversal Systems05/31/2018
BISOTISSUEDJacobs Telecommun12/04/2019
BISOTISSUEDAjp Contracting06/13/2018
BISPLISSUEDP.A.C. Heating08/24/2015
BISEQISSUEDAtco Restoration08/06/2015
BISOTISSUEDC & J Restoration04/23/2015
BISOTISSUEDC & J Restoration03/26/2015
BISOTISSUEDDigital Construction Technologies02/12/2015
BISMHISSUEDDigital Construction Technologies01/20/2015
BISEQISSUEDEverest Scaffolding09/15/2014
BISOTISSUEDC & J Restoration09/09/2014
BISPLISSUEDGerard's Plumbing & Heating06/13/2014
BISBLISSUEDGerard's Plumbing & Heating06/13/2014
BISOTISSUEDXinos Construction04/20/2011
BISEQISSUEDXinos Construction03/10/2011
BISOTISSUEDS&S Kings08/19/2010
BISEQISSUEDXinos Construction06/21/2010
BISBLISSUEDC C Controlled Combustion04/22/2010
BISOTISSUEDXinos Construction07/10/2006
BISEQISSUEDRegional Scaffolding & Hoisting08/06/1996
5 projects · most recent 09/30/2026
General Wiring
FiledStatusContractorScope
09/30/2026CompleteE & M Electrical NY—
11/16/2023Permit IssuedBorowide Elect'l Contractors—
09/05/2023Permit IssuedWire Electric Inst CoGeneral Wiring
03/13/2020CompleteAll Boro ElectricGeneral Wiring
05/23/2018CompleteTop Shelf Electric—
1 project · most recent 10/01/2025
Steel
FiledStatusContractorScope
10/01/2025Permit IssuedPofi ConstructionSteel
1 project · most recent 10/23/2025
Sidewalk Shed
FiledStatusContractorScope
10/23/2025Permit IssuedAndamio ScaffoldingSidewalk Shed
2 projects · most recent 09/23/2026
Suspended Scaffold Tenant Protection Plan 72 Hour
FiledStatusContractorScope
09/23/2026Permit IssuedBalaton ConsultingSuspended Scaffold
10/01/2025Permit IssuedPofi ConstructionTenant Protection Plan 72 Hour
1 project · most recent 09/23/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
09/23/2026Permit IssuedBalaton ConsultingSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/04/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/22/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
05/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/29/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 13
DateRequirementInspectorRole
10/16/2024Final—progress
10/16/2024Structural Steel - Details—special
10/16/2024Structural Stability – Alterations of existing buildings—special
10/16/2024Structural Steel - Welding—special
01/09/2024Chimneys and ventsStephen Shishkospecial
01/08/2024Fire-Resistant Penetrations and JointsStephen Shishkospecial
12/19/2023Tenant Protection Plan ComplianceStephen Shishkospecial
12/19/2023Tenant Protection Plan ComplianceStephen Shishkospecial
12/19/2023Sprinkler SystemsStephen Shishkospecial
12/19/2023Tenant Protection Plan ComplianceStephen Shishkospecial
12/19/2023Mechanical SystemsStephen Shishkospecial
12/19/2023FinalStephen Shishkoprogress
05/29/2018FinalHumayun Ahmedprogress