← Back
Two family frame
143-84 232ND STREET
QUEENS · BIN 4620813
💬 Discuss this project
2021Year Built
2Stories
B2Building Class
R3-1Zoning
2,192 sfGross Floor Area
2Units
Two family frame · 3,821 sf lot · 0.57 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Floor 223p · 3 filings · 20 docs
Floor 121p · 2 filings · 20 docs
Cellar26p · 3 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/02/2024$1.3M—166-16 88 AVE LLC → Private party$588/sf building
09/30/2020$530K—Private party → 166-16 88 AVE LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC1103/28/2024
ADVANCE DESIGN GROUP, INC306/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING2403/21/2026
STONECORE LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AB PLUS R CONSTRUCTION INGeneral Contractor1407/08/2026
FIRST WORLD DEVELOPMENTGeneral Contractor303/21/2026
BRUCHE MECHANICAL NY LLCFire Protection207/08/2026
PLBG P & H INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURY TESTING & CONSULT40811303/28/2024
TRIANGLE INSPECTION & TES7495703/28/2024
Building Lifecycle
All (130)Filed (14)Permit Issued (13)Signed Off (4)Inspection (11)Objection (58)Special Inspection (30)
05/17/2024
Signed off — Alteration
INSTALLATION OF AUTOMATIC WET SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
Q00667204-I1
05/17/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/14/2024
Signed off — Alteration
This plumbing application in conjunction with New building application Q00490201.
Q00525818-I1
04/17/2024
Special inspection requirement — Permanent certificate
ALDO BRAVO
04/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALDO BRAVO
04/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
04/17/2024
Special inspection requirement — Maintenance information
ALDO BRAVO
04/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALDO BRAVO
04/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALDO BRAVO
04/17/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ALDO BRAVO
04/17/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
04/17/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
04/17/2024
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
03/28/2024
Filed — Alteration
This plumbing application in conjunction with New building application Q00490201.
Q00525818-P6
03/28/2024
Signed off — New Building
THIS APPLICATION IS FILED TO ADD FOUNDATION AND STRUCTURE WORK TYPE TO NB
Q00490201-S1
03/27/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALDO BRAVO
03/27/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALDO BRAVO
03/27/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
03/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
03/27/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ALDO BRAVO
03/27/2024
Special inspection requirement — Permanent certificate
ALDO BRAVO
03/27/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALDO BRAVO
03/27/2024
Special inspection requirement — Maintenance information
ALDO BRAVO
02/05/2024
Permit issued — General Construction
Q00490201-S1-GC
01/18/2024
Filed — Alteration
This plumbing application in conjunction with New building application Q00490201.
Q00525818-P5
01/18/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALDO BRAVO
01/18/2024
Special inspection requirement — Maintenance information
ALDO BRAVO
01/18/2024
Special inspection requirement — Permanent certificate
ALDO BRAVO
01/18/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ALDO BRAVO
01/18/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Rajasekhar Sakhamuri
01/18/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
01/18/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALDO BRAVO
01/18/2024
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
01/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
01/18/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALDO BRAVO
12/19/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/15/2023
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
12/15/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/01/2023
Filed — Alteration
This plumbing application in conjunction with New building application Q00490201.
Q00525818-P4
11/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/26/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/31/2023
Filed — New Building
THIS APPLICATION IS FILED TO ADD FOUNDATION AND STRUCTURE WORK TYPE TO NB
Q00490201-P1
07/07/2023
Filed — Alteration
This plumbing application in conjunction with New building application Q00490201.
Q00525818-P3
07/07/2023
Permit issued — Plumbing
Q00525818-I1-PL
07/07/2023
Permit issued — Sprinklers
Q00667204-I1-EW-SP
06/13/2023
Filed — Alteration
INSTALLATION OF AUTOMATIC WET SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
Q00667204-P2
05/22/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/09/2023
Permit issued — General Construction
Q00490201-I1-GC
02/27/2023
Filed — Alteration
This plumbing application in conjunction with New building application Q00490201.
Q00525818-P2
01/10/2023
Signed off — Alteration
Q00433631-I1
12/30/2022
Filed — Alteration
INSTALLATION OF AUTOMATIC WET SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
Q00667204-P1
05/12/2022
Permit issued — Sprinklers
Q00667204-I1-EW-SP
05/10/2022
Permit issued — Construction Fence
Q00433631-I1-FN
05/10/2022
Permit issued — General Construction
Q00490201-I1-GC
05/06/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/06/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/12/2022
Permit issued — Construction Fence
Q00433631-I1-FN
04/05/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAB PLUS R CONSTRUCTION IN02/05/2024
DOB NOWPlumbingSigned-offPLBG P & H INC07/07/2023
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC07/07/2023
DOB NOWGeneral ConstructionPermit IssuedAB PLUS R CONSTRUCTION IN05/09/2023
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC05/12/2022
DOB NOWConstruction FenceSigned-offAB PLUS R CONSTRUCTION IN05/10/2022
DOB NOWGeneral ConstructionPermit IssuedAB PLUS R CONSTRUCTION IN05/10/2022
DOB NOWConstruction FenceSigned-offAB PLUS R CONSTRUCTION IN04/12/2022
DOB NOWPlumbingSigned-offPLBG P & H INC03/11/2022
DOB NOWStructuralSigned-offAB PLUS R CONSTRUCTION IN10/29/2021
DOB NOWStructuralSigned-offAB PLUS R CONSTRUCTION IN10/29/2021
DOB NOWGeneral ConstructionPermit IssuedAB PLUS R CONSTRUCTION IN10/26/2021
DOB NOWConstruction FenceSigned-offFIRST WORLD DEVELOPMENT02/16/2021
2 projects · most recent 12/28/2021
General Wiring
FiledStatusContractorScope
12/28/2021CompleteRONEY ELECTRIC INCGeneral Wiring
06/26/2018CompleteWINDSOR ELEC CONT'G INC.General Wiring
1 project · most recent 07/31/2023
Wood
FiledStatusContractorScope
07/31/2023Signed-offAB PLUS R CONSTRUCTION INWood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
05/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/19/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/15/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
12/15/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/26/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/22/2023Pass-Final CND-Occupancy InspectionPassView ↗
05/06/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/06/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/05/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/05/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 116
DateRequirementInspectorRole
04/17/2024Energy Code Compliance InspectionsALDO BRAVOprogress
04/17/2024HVAC-R and service water heating system controlsALDO BRAVOenergy_progress
04/17/2024Permanent certificateALDO BRAVOenergy_progress
04/17/2024Maintenance informationALDO BRAVOenergy_progress
04/17/2024HVAC-R and service water piping design and insulationALDO BRAVOenergy_progress
04/17/2024HVAC-R and service water heating equipmentALDO BRAVOenergy_progress
04/17/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
04/17/2024Fire-Resistant Penetrations and JointsALDO BRAVOspecial
04/17/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
04/17/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationALDO BRAVOspecial
03/27/2024Fire-Resistant Penetrations and JointsALDO BRAVOspecial
03/27/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationALDO BRAVOspecial
03/27/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
03/27/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
03/27/2024Energy Code Compliance InspectionsALDO BRAVOprogress
03/27/2024Permanent certificateALDO BRAVOenergy_progress
03/27/2024Maintenance informationALDO BRAVOenergy_progress
03/27/2024HVAC-R and service water heating equipmentALDO BRAVOenergy_progress
03/27/2024HVAC-R and service water piping design and insulationALDO BRAVOenergy_progress
03/27/2024HVAC-R and service water heating system controlsALDO BRAVOenergy_progress
01/18/2024HVAC-R and service water heating equipmentALDO BRAVOenergy_progress
01/18/2024Fire-Resistant Penetrations and JointsALDO BRAVOspecial
01/18/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationALDO BRAVOspecial
01/18/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesRajasekhar Sakhamurispecial
01/18/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
Latest 25 of 116.
▾Documents — 123 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch13
08/27/2026Q00525818-P5Request digital key ↗
08/27/2026Q00525818-P1Request digital key ↗
08/27/2026Q00525818-P2Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00433631-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00490201-P1Open ↗
08/13/2026Q00490201-I1Open ↗
08/13/2026Q00490201-S1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q00490201-I1Open ↗
08/13/2026Q00490201-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00490201-I1Open ↗
▸Seals & Professional Certifications67
▸DOB NOWSpecial Inspector Seal & Signature31
09/05/2026Q00490201-S1Open ↗
09/05/2026Q00490201-S1Open ↗
09/01/2026Q00667204-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWProgress Inspector Seal & Signature22
09/05/2026Q00490201-S1Open ↗
09/05/2026Q00490201-S1Open ↗
08/28/2026Q00525818-P3Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/27/2026Q00525818-P6Open ↗
08/27/2026Q00525818-P5Open ↗
08/27/2026Q00525818-P4Open ↗
Showing 3 of 14 on file for this type
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00490201-I1Open ↗
08/13/2026Q00490201-P1Open ↗
08/13/2026Q00490201-S1Open ↗
▸DOB NOWStandpipe Alarms Drawings2
08/13/2026Q00490201-S1—
08/13/2026Q00490201-I1—
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00490201-I1Open ↗
08/13/2026Q00490201-S1Open ↗
08/13/2026Q00490201-P1Open ↗
▸DOB NOWStreet Tree Sign Off2
08/13/2026Q00490201-S1Open ↗
08/13/2026Q00490201-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026Q00490201-S1Open ↗
08/13/2026Q00490201-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00490201-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00490201-I1Open ↗
08/13/2026Q00525818-I1Open ↗
▸Inspections & Test Reports15
▸DOB NOWSOIL REPORT10
08/13/2026Q00525818-P6Open ↗
08/13/2026Q00490201-I1Open ↗
08/13/2026Q00525818-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026Q00490201-S1Open ↗
08/13/2026Q00525818-I1Open ↗
08/13/2026Q00490201-I1Open ↗
▸DOB NOWTR4 Plot Diagram2
08/13/2026Q00490201-S1Open ↗
08/13/2026Q00490201-I1Open ↗
▸Other Documents6
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00490201-I1Open ↗
08/13/2026Q00490201-P1Open ↗
08/13/2026Q00490201-S1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00490201-I1Open ↗
08/13/2026Q00490201-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00490201-I1Open ↗