← Back
Two family frame
143-86 232ND STREET
💬 Discuss this project
2021Year Built
2Stories
B2Building Class
R3-1Zoning
2,238 sfGross Floor Area
2Units
Two family frame · 3,821 sf lot · 0.59 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbingFire Protection
Floor 223p · 2 filings · 20 docs
Floor 123p · 2 filings · 20 docs
Cellar24p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
166-16 88 AVENUE403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/14/2024$1.3M—166-16 88 AVE LLC → Private party$576/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC1203/28/2024
ADVANCE DESIGN GROUP, INC304/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING2603/21/2026
STONECORE LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AB PLUS R CONSTRUCTION INGeneral Contractor1107/08/2026
BRUCHE MECHANICAL NY LLCFire Protection107/08/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURY TESTING & CONSULT40811203/28/2024
Building Lifecycle
All (123)Filed (15)Permit Issued (10)Signed Off (5)Inspection (9)Objection (54)Special Inspection (30)
05/28/2024
Signed off — Alteration
INSTALLATION OF AUTOMATIC WET SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
Q00667210-I1
05/14/2024
Signed off — Alteration
this application is filed to add new plumbing fixtures
Q00505258-I1
04/16/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ALDO BRAVO
04/16/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
ALDO BRAVO
04/16/2024
Special inspection requirement — Permanent certificate
ALDO BRAVO
04/16/2024
Special inspection requirement — Maintenance information
ALDO BRAVO
04/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
04/16/2024
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
04/16/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
03/28/2024
Signed off — New Building
NEW 2 STORY 2 FAMILY FRAME DWELLING WITH CELLAR
Q00488096-S1
03/28/2024
Filed — Alteration
this application is filed to add new plumbing fixtures
Q00505258-P5
03/27/2024
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
03/27/2024
Special inspection requirement — Permanent certificate
ALDO BRAVO
03/27/2024
Special inspection requirement — Maintenance information
ALDO BRAVO
03/27/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ALDO BRAVO
03/27/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
ALDO BRAVO
03/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
02/27/2024
Filed — Alteration
this application is filed to add new plumbing fixtures
Q00505258-P4
02/26/2024
Special inspection requirement — Energy Code Compliance Inspections
ALDO BRAVO
02/26/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
02/26/2024
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
ALDO BRAVO
02/26/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALDO BRAVO
02/26/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ALDO BRAVO
02/26/2024
Special inspection requirement — Maintenance information
ALDO BRAVO
02/26/2024
Special inspection requirement — Permanent certificate
ALDO BRAVO
02/05/2024
Signed off — Alteration
THIS APPLICATION IS FILEDTO ADD NEW 10' CURB CUT
Q00505270-I1
02/05/2024
Permit issued — Foundation
Q00488096-S1-GC
12/19/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/15/2023
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
12/15/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
10/26/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/11/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
09/01/2023
Filed — Alteration
THIS APPLICATION IS FILEDTO ADD NEW 10' CURB CUT
Q00505270-P1
08/31/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
08/18/2023
Special inspection requirement — Electric vehicle service equipment requirements
ALDO BRAVO
08/18/2023
Special inspection requirement — Permanent certificate
ALDO BRAVO
08/18/2023
Special inspection requirement — Maintenance information
ALDO BRAVO
08/18/2023
Special inspection requirement — Lighting in dwelling units
ALDO BRAVO
08/18/2023
Special inspection requirement — Insulation placement and R values
ALDO BRAVO
08/18/2023
Special inspection requirement — Fenestration areas
ALDO BRAVO
08/18/2023
Special inspection requirement — Fenestration air leakage
ALDO BRAVO
08/18/2023
Special inspection requirement — Air barrier - visual inspection
ALDO BRAVO
08/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
ALDO BRAVO
07/31/2023
Filed — New Building
NEW 2 STORY 2 FAMILY FRAME DWELLING WITH CELLAR
Q00488096-P1
07/07/2023
Filed — Alteration
this application is filed to add new plumbing fixtures
Q00505258-P3
06/22/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/24/2023
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
05/22/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/09/2023
Permit issued — General Construction
Q00488096-I1-GC
04/20/2023
Filed — Alteration
INSTALLATION OF AUTOMATIC WET SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
Q00667210-P2
02/27/2023
Filed — Alteration
this application is filed to add new plumbing fixtures
Q00505258-P2
01/10/2023
Signed off — Alteration
TEMPORARY CONSTRUCTION 8' FEET HIGH FENCE
Q00603346-I1
12/30/2022
Filed — Alteration
INSTALLATION OF AUTOMATIC WET SPRINKLER SYSTEM THROUGHOUT THE BUILDING.
Q00667210-P1
12/14/2022
Permit issued — Construction Fence
Q00603346-I1-FN
12/13/2022
Permit issued — Curb Cut
Q00505270-I1-CC
05/20/2022
Permit issued — Sprinklers
Q00667210-I1-EW-SP
05/10/2022
Permit issued — General Construction
Q00488096-I1-GC
03/30/2022
Permit issued — Plumbing
Q00505258-I1-PL
03/03/2022
Objection raised — Other
Latest 60 of 123 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offAB PLUS R CONSTRUCTION IN02/05/2024
DOB NOWGeneral ConstructionPermit IssuedAB PLUS R CONSTRUCTION IN05/09/2023
DOB NOWConstruction FenceSigned-offAB PLUS R CONSTRUCTION IN12/14/2022
DOB NOWCurb CutSigned-offAB PLUS R CONSTRUCTION IN12/13/2022
DOB NOWSprinklersSigned-offBRUCHE MECHANICAL NY LLC05/20/2022
DOB NOWGeneral ConstructionPermit IssuedAB PLUS R CONSTRUCTION IN05/10/2022
DOB NOWPlumbingSigned-offPLBG P & H INC03/30/2022
DOB NOWGeneral ConstructionSigned-offAB PLUS R CONSTRUCTION IN11/02/2021
DOB NOWGeneral ConstructionSigned-offAB PLUS R CONSTRUCTION IN11/01/2021
DOB NOWGeneral ConstructionPermit IssuedAB PLUS R CONSTRUCTION IN10/27/2021
1 project · most recent 12/28/2021
General Wiring
FiledStatusContractorScope
12/28/2021CompleteRONEY ELECTRIC INCGeneral Wiring
1 project · most recent 07/31/2023
Wood
FiledStatusContractorScope
07/31/2023Signed-offAB PLUS R CONSTRUCTION INWood
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/19/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/15/2023Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
12/15/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/26/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/11/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
08/31/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
06/22/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/24/2023Fail-Final Curb Cut Non-Directive 14FailView ↗
05/22/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 77
DateRequirementInspectorRole
04/16/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationALDO BRAVOspecial
04/16/2024Permanent certificateALDO BRAVOenergy_progress
04/16/2024Maintenance informationALDO BRAVOenergy_progress
04/16/2024Energy Code Compliance InspectionsALDO BRAVOprogress
04/16/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesALDO BRAVOspecial
04/16/2024Fire-Resistant Penetrations and JointsALDO BRAVOspecial
04/16/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
03/27/2024Fire-Resistant Penetrations and JointsALDO BRAVOspecial
03/27/2024Maintenance informationALDO BRAVOenergy_progress
03/27/2024Permanent certificateALDO BRAVOenergy_progress
03/27/2024Energy Code Compliance InspectionsALDO BRAVOprogress
03/27/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
03/27/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesALDO BRAVOspecial
03/27/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationALDO BRAVOspecial
02/26/2024Fire-Resistant Penetrations and JointsALDO BRAVOspecial
02/26/2024Maintenance informationALDO BRAVOenergy_progress
02/26/2024Permanent certificateALDO BRAVOenergy_progress
02/26/2024Energy Code Compliance InspectionsALDO BRAVOprogress
02/26/2024Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
02/26/2024Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesALDO BRAVOspecial
02/26/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationALDO BRAVOspecial
08/18/2023Fire-Resistance Rated ConstructionALDO BRAVOprogress
08/18/2023Air barrier - visual inspectionALDO BRAVOenergy_progress
08/18/2023Fenestration air leakageALDO BRAVOenergy_progress
08/18/2023Fenestration areasALDO BRAVOenergy_progress
Latest 25 of 77.
▾Documents — 148 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/27/2026Q00603346-I1Request digital key ↗
08/24/2026Q00667210-P2Request digital key ↗
08/24/2026Q00667210-P1Request digital key ↗
Showing 3 of 14 on file for this type
▸Applications & Permits6
▸BISPLAN / WORK APPROVAL APPLICATION3
04/17/2024440683841Open ↗
06/22/2023440683841Open ↗
09/25/2021440683841Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
05/05/2023440683841Open ↗
09/26/2021440683841Open ↗
▸BISDOT -410 PERMITS1
04/18/2024440683841Open ↗
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00488096-P1Open ↗
08/13/2026Q00488096-I1Open ↗
08/13/2026Q00488096-S1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q00488096-I1Open ↗
08/13/2026Q00488096-P1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
09/25/2021440683841Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00488096-I1Open ↗
▸Seals & Professional Certifications73
▸DOB NOWProgress Inspector Seal & Signature32
08/30/2026Q00488096-P1Open ↗
08/30/2026Q00488096-P1Open ↗
08/30/2026Q00488096-P1Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature25
09/01/2026Q00667210-P1Open ↗
09/01/2026Q00667210-P1Open ↗
09/01/2026Q00667210-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/24/2026Q00667210-P1Open ↗
08/24/2026Q00667210-P2Open ↗
08/24/2026Q00488096-P1Open ↗
Showing 3 of 14 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
09/25/2021440683841Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/25/2021440683841Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00488096-I1Open ↗
08/13/2026Q00488096-P1Open ↗
08/13/2026Q00488096-S1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026Q00488096-I1—
▸Safety & Tenant Protection10
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00488096-P1Open ↗
08/13/2026Q00488096-I1Open ↗
08/13/2026Q00488096-S1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/13/2026Q00488096-S1Open ↗
08/13/2026Q00488096-I1Open ↗
▸DOB NOWStreet Tree Sign Off2
08/13/2026Q00488096-I1Open ↗
08/13/2026Q00488096-S1Open ↗
▸BISSTREET TREE CHECKLIST1
09/25/2021440683841Open ↗
▸BISSTREET TREE SIGNOFF1
04/01/2024440683841Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00488096-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00488096-I1Open ↗
08/13/2026Q00505258-I1Open ↗
▸Inspections & Test Reports16
▸DOB NOWSOIL REPORT9
08/23/2026Q00505258-P4Open ↗
08/23/2026Q00505258-P3Open ↗
08/23/2026Q00505258-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026Q00505258-I1Open ↗
08/13/2026Q00488096-I1Open ↗
08/13/2026Q00488096-S1Open ↗
▸DOB NOWTR4 Plot Diagram2
08/13/2026Q00488096-S1Open ↗
08/13/2026Q00488096-I1Open ↗
▸BISBPP: FIELD INSPECTION1
04/02/2024440683841Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
09/25/2021440683841Open ↗
▸Cost, Insurance & Ownership1
▸BISBPP: ENGINEERS AFFIDAVIT1
04/02/2024440683841Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION1
07/03/2023440683841Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
09/25/2021440683841Open ↗
▸Other Documents13
▸BISBPP - SUPPORTING DOCUMENTATION5
07/03/2023440683841Open ↗
09/25/2021440683841Open ↗
09/25/2021440683841Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00488096-P1Open ↗
08/13/2026Q00488096-I1Open ↗
08/13/2026Q00488096-S1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00488096-P1Open ↗
08/13/2026Q00488096-I1Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
04/02/2024440683841Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
04/02/2024440683841Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00488096-I1Open ↗