← Back
Two stories - detached, small or mid-size
143 BLACKFORD AVENUE
STATEN ISLAND · Port Richmond · BIN 5025917
💬 Discuss this project
1905Year Built
2Stories
A1Building Class
R3AZoning
1,584 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,500 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
ElectricalPlumbing
Roof4p · 1 filing · 12 docs
Floor 24p · 1 filing · 7 docs
Floor 14p · 1 filing · 7 docs
Cellar4p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS603/21/2026
SUNRUN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN SOLAR ELECTL CORPElectrical103/22/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
FINE MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272201/13/2025
Building Lifecycle
All (14)Filed (5)Permit Issued (2)Signed Off (2)Special Inspection (5)
05/14/2025
Signed off — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01109407-I1
01/13/2025
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01109407-P1
12/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
12/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
12/17/2024
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
12/17/2024
Special inspection requirement — Final
Walid Abdulla
12/17/2024
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
09/23/2024
Permit issued — Solar
S01109407-I1-SL
09/16/2024
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01109407-I1
07/30/2021
Signed off — Alteration
APPLICATION FILED TO INSTALL ALL NEW FIXTURE AT EXISTING 2 STORY ONE FAMILY RESIDENCE.
S00325221-I1
03/10/2021
Filed — Alteration
APPLICATION FILED TO INSTALL ALL NEW FIXTURE AT EXISTING 2 STORY ONE FAMILY RESIDENCE.
S00325221-P2
06/15/2020
Filed — Alteration
APPLICATION FILED TO INSTALL ALL NEW FIXTURE AT EXISTING 2 STORY ONE FAMILY RESIDENCE.
S00325221-P1
06/02/2020
Permit issued — Plumbing
S00325221-I1-PL
03/09/2020
Filed — Alteration
APPLICATION FILED TO INSTALL ALL NEW FIXTURE AT EXISTING 2 STORY ONE FAMILY RESIDENCE.
S00325221-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC09/23/2024
DOB NOWPlumbingSigned-offFINE MECHANICAL CORP06/02/2020
BISOTISSUEDCHAMPION INTERNATIONAL CO03/11/2020
3 projects · most recent 09/16/2024
General Wiring
FiledStatusContractorScope
09/16/2024CompleteSUNRUN SOLAR ELECTL CORPGeneral Wiring
03/24/2023CompleteAQUATECH MECH,PLBG & ELECGeneral Wiring
07/17/2020CompleteHIGH BEAM ELECTRIC CORP.General Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
12/17/2024Fire-Resistant Penetrations and JointsWalid Abdullaspecial
12/17/2024Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
12/17/2024Energy Code Compliance InspectionsWalid Abdullaprogress
12/17/2024FinalWalid Abdullaprogress
12/17/2024Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing3
08/25/2026S00325221-I1Request digital key ↗
08/25/2026S00325221-P2Request digital key ↗
08/15/2026S00325221-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/20/2026S01109407-I1Request digital key ↗
08/20/2026S01109407-P1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
12/30/2020520450994Open ↗
06/16/2020520450994Open ↗
03/11/2020520450994Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/16/2020520450994Open ↗
▸BISWORK PERMIT APPLICATION1
03/11/2020520450994Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026S01109407-P1Open ↗
08/20/2026S01109407-I1Open ↗
08/13/2026S00325221-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026S01109407-P1Open ↗
08/23/2026S01109407-P1Open ↗
08/23/2026S01109407-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026S01109407-P1Open ↗
08/23/2026S01109407-P1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/11/2020520450994Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/11/2020520450994Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/11/2020520450994Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/20/2026S01109407-P1Open ↗
08/20/2026S01109407-I1Open ↗
▸Energy Compliance3
▸BISAS-BUILT ENERGY ANALYSIS1
01/05/2021520450994Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/05/2021520450994Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/11/2020520450994Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/05/2021520450994Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/05/2021520450994Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/11/2020520450994Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01109407-I1Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
01/05/2021520450994Open ↗
03/11/2020520450994Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
03/11/2020520450994Open ↗