| Owner | Filings | Most Recent |
|---|---|---|
| OWNERS REP | 9 | 09/17/2026 |
| 143 FRANKLIN OWNER LLC | 1 | 03/22/2026 |
| KRINOS PROPERTIES | 16 | 03/22/2026 |
| OWNER OF 143 FRANKLIN ST | 2 | 03/22/2026 |
| MOSCAHALADES | 1 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 12/31/2024 | $35.6M | — | KRINOS PROPERTIES → 143 FRANKLIN OWNER LLC | $1,054/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| HOWARD I. SHAPIRO & ASSOCIATES, P.C | 3 | 08/19/2026 |
| RIGID STRUCTURAL DESIGN, LLC | 1 | 06/29/2026 |
| GEA CONSULTING ENGINEERS | 3 | 03/25/2026 |
| LUKE LICALZI, P.E., P.C. | 3 | 03/24/2026 |
| DESIMONE CONSULTING ENGINEERS | 3 | 03/24/2026 |
| PAUL PERDEK, PROF. ENG. PLLC | 3 | 10/20/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| JAM CONSULTANTS, INC. | 12 | 03/21/2026 |
| AE DESIGN SOLUTION | 6 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CORE SCAFFOLD SYSTEMS INC. | General Contractor | 7 | 09/17/2026 |
| REPUBLIC SCAFFOLD&HOIST C | General Contractor | 1 | 07/01/2026 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sidewalk Shed | Permit Issued | CORE SCAFFOLD SYSTEMS INC. | 09/16/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | REPUBLIC SCAFFOLD&HOIST C | 06/29/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | CORE SCAFFOLD SYSTEMS INC. | 06/22/2026 |
| DOB NOW | Sidewalk Shed | Permit Issued | CORE SCAFFOLD SYSTEMS INC | 03/24/2026 |
| DOB NOW | Supported Scaffold | Permit Issued | CORE SCAFFOLD SYSTEMS INC | 04/23/2025 |
| DOB NOW | Sidewalk Shed | Permit Issued | CORE SCAFFOLD SYSTEMS INC | 03/28/2025 |
| BIS | PL | ISSUED | PEAK PLUMBING SOLUTIONS LLC | 04/02/2019 |
| BIS | SD | ISSUED | PEAK FIRE PROTECTION LLC | 04/02/2019 |
| BIS | SD | ISSUED | PEAK FIRE PROTECTION LLC | 11/17/2017 |
| BIS | SD | ISSUED | PEAK FIRE PROTECTION LLC | 12/02/2016 |
| BIS | PL | ISSUED | PEAK PLUMBING SOLUTIONS LLC | 09/22/2016 |
| BIS | OT | ISSUED | FORCE SERVICES LLC | 09/20/2016 |
| BIS | OT | ISSUED | INFRASTRUCTURE DEVELOP | 04/27/2016 |
| BIS | OT | ISSUED | URBAN ARCHAEOLOGY | 02/13/1996 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 08/19/2026 | — | — | Heating and Air Conditioning Systems | Heat / Cool Lg ZRUM121BTE6 10 tons · Vrf Outdoor ×5 ZRUM144BTE6 12 tons · Vrf Outdoor ×1 ZRUM168BTE6 16 tons · Vrf Outdoor ×1 ZRUN024GSS0 2 tons · Vrf Outdoor ×1 Captiveaire CASHVAC3-E.902-24-12.5T-ERV 149,200 BTU · Rooftop Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/19/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/19/2026 | — | — | Storm, Water/Sanitary |
| 03/13/2026 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/17/2025 | Permit Issued | SOLAS ELECTRICAL CORP | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/19/2026 | — | — | Steel, Concrete, Masonry |
| 06/16/2026 | — | — | 1 scope_items |
| 03/13/2026 | — | — | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/19/2026 | — | — | Scaffold |
| 06/29/2026 | Permit Issued | REPUBLIC SCAFFOLD&HOIST C | Scaffold |
| 10/20/2025 | Permit Issued | CORE SCAFFOLD SYSTEMS INC | Scaffold |
| 03/27/2025 | Permit Issued | CORE SCAFFOLD SYSTEMS INC | Sidewalk Shed |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/17/2026 | Structural Steel - High Strength Bolting | — | special |
| 08/17/2026 | Final | — | progress |
| 08/17/2026 | Structural Steel - Welding | — | special |
| 08/17/2026 | Construction Operations Influencing Adjacent Structures | — | special |
| 08/17/2026 | Post-installed Anchors | — | special |
| 08/17/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 07/28/2026 | Maintenance information | — | energy_progress |
| 07/17/2026 | Duct leakage testing, insulation and design | — | energy_progress |
| 07/17/2026 | Metering | — | energy_progress |
| 05/18/2026 | Structural Steel - Welding | — | special |
| 05/18/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 05/18/2026 | Post-installed Anchors | — | special |
| 05/18/2026 | Structural Steel - High Strength Bolting | — | special |
| 05/18/2026 | Final | James Scheld | progress |
| 03/24/2026 | Electrical motors and elevators | — | energy_progress |
| 03/24/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 03/24/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 03/24/2026 | Lighting controls | — | energy_progress |
| 03/24/2026 | Lighting in dwelling units | — | energy_progress |
| 03/24/2026 | Interior lighting power | — | energy_progress |
| 03/24/2026 | Maintenance information | — | energy_progress |
| 03/24/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 03/24/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 03/24/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 03/24/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |