ECB10/06/2025Atoi, swo was removed/tampered from door/window., comply with code$25K due
ECB08/22/2025Illegally engaging in any business or occupation without a required license. At time of inspection responding to an incident observed workers doing construction activity at rear of property. Upon review it was$25K due
DOB08/22/2025Failure to comply with commissioner's order - stop work order issued by cse 8/22/25 under c#3A26599 and c#3A24868 issued by rteu on 8/11/25 with a failure to comply on 8/22/2025 with c#3A26626. All stop work order sticker(s) removed
ECB08/22/2025Failure to institute safety measures - no safety equipment (shoes) at time of inspection - stop all work forthwith with multiple full stop work order issued along with failure to comply with commissioner's orde$12K due
ECB08/22/2025Unlawfully continued work while on notice of a stop work order. At time of inspection responding to an incident observed workers unlawfully working against a fswo at rear of property on an unpermitted attached$25K due
ECB08/22/2025Unlawfully continued work while on notice of a stop work order. At thetime of inspection observed 4 workers conduction concrete operations at rear desk while site was on a full stop work order. Stop work order$25K due
ECB08/22/2025Responding to incident observed workers performing work at rear of property & upon review of plans, it was noted that there were no approved drawings for attached steel structure at rear of property. Also obser$12K due
ECB08/11/2025Fswo issued for denial of entry while under active permit #B01141896 with swo. Atoi observed premises main entry door open; however, as soon as inspector approached, two construction workers standing outside &$10K due
ECB06/16/2025ECB nov issued for ww/op. Atoi observed premises has been vertically elevated w/o permit to the hight of 4-story bldg. Scaffolding has been elevated to a 4-story hight requiring permit. No permit for this work$6K due
ECB06/13/2025Work contrary to approved plans under active job permit B01141896-I1-gc which expires on 11/10/2025. Unoccupied 3 story building. Atoi observed at exposure 1 vertical and horizontal enlargement creating a 4TH f$2K due
DOB09/23/2024Violation issued-failure to file 2023 external low pressure inspection
ECB11/10/2025Tampering with, removed or defaced a written posted stop work order. At time of inspection observed witten stop work order that was posted 06/13/2025, comp 3A17636, have been defaced. New witten stop work orderHearing held — result not yet published$5K proposed