← Back
BuildNYC
Over six families without stores
143 PALMETTO STREET
BROOKLYN · BIN 3326146
💬 Discuss this project
1983Year Built
3Stories
C1Building Class
R6Zoning
123,800 sfGross Floor Area
120Units
LL97 CoveredRent Stabilized7 Active Violations 3 likely answered ▸FDNY Report ↗
Over six families without stores · Owner of record: Bushwick Gardens · 139,050 sf lot · 0.89 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
CellarMechanical work and HVAC system installation38p · 1 filing · 20 docs
Site & exteriorMechanical work and HVAC system installation40p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Pennrose2508/28/2026
New York City Housing Authority1103/21/2026
Hope Gardens I403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cameron Engineering807/21/2026
IMEG Consulting101/18/2024
Scalar Architecture110/25/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution203/21/2026
JM Zoning1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Miller Plumbing & HeatingPlumbing407/08/2026
Procida ConstructionGeneral Contractor304/09/2026
K Y Plumbing & HeatingPlumbing203/21/2026
Procida ConstructionScaffold203/21/2026
Procida Constructionspecialty_contractor207/08/2026
AZ Water ManPlumbing203/21/2026
Bright PowerGeneral Contractor103/21/2026
JVR Plumbing and HeatingPlumbing206/23/2021
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Tectonic Engineering1061007/21/2026
Building Lifecycle
11/09/2026
Permit renewed — Plumbing
Renewed with changes
B00961256-S2-PL
10/17/2026
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
B00961256-I1-MS
08/05/2026
Signed off — Alteration
RENOVATION OF 3-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: PROVIDE SUPPORT FOR NEW EXTERIOR BOILER ROOM POD; NO CHANGES TO USE, EGRESS OR OCCUPANCY.
B00961251-I1
07/21/2026
Filed — Alteration
DECOMMISSION AND ABANDON IN PLACE EXISTING INDIRECT DOMESTIC WATER HEATERS, RECIRCULATION PUMP, AND ASSOCIATED PIPING WITH VALVES; PROVIDE NEW DOMESTIC WATER AND GAS PIPING FROM THE CEL TO A NEW BOILER POD. NO CHANGES TO USE, EGRESS, OR OCCUPANCY.
B00961256-P5
07/20/2026
Special inspection requirement — Tenant Protection Plan Compliance
78 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMiller Plumbing & Heating11/09/2026
DOB NOWPlumbingPermit IssuedMiller Plumbing & Heating05/05/2026
DOB NOWBoiler EquipmentSigned-offMiller Plumbing & Heating11/06/2025
DOB NOWMechanical SystemsPermit IssuedProcida Construction10/17/2025
DOB NOWStructuralSigned-offProcida Construction07/15/2025
DOB NOWPlumbingPermit IssuedMiller Plumbing & Heating09/04/2024
DOB NOWPlumbingPermit IssuedMiller Plumbing & Heating06/20/2024
DOB NOWMechanical SystemsPermit IssuedProcida Construction06/04/2024
DOB NOWConstruction FenceSigned-offProcida Construction10/25/2019
BISBLISSUEDPlumbing-It Mechanical06/23/2021
BISPLISSUEDPlumbing-It Mechanical06/23/2021
BISMHISSUEDProcida Construction04/26/2021
BISOTISSUEDProcida Construction04/26/2021
BISOTISSUEDBright Power02/16/2021
BISBLISSUEDK & Y Plumbing and Heating01/26/2021
BISPLISSUEDK & Y Plumbing and Heating01/26/2021
BISOTISSUEDBright Power Installation07/07/2020
BISOTISSUEDProcida Construction05/04/2020
BISMHISSUEDProcida Construction05/04/2020
BISPLISSUEDA & A Plumbing Systems03/10/2020
BISBLISSUEDA & A Plumbing Systems03/10/2020
1 project · most recent 07/21/2026
Heating Systems
FiledStatusContractorScope
07/21/2026Permit IssuedProcida ConstructionHeating Systems
1 project · most recent 07/21/2026
FiledStatusContractorScope
07/21/2026———
1 project · most recent 07/21/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
07/21/2026Permit IssuedJD Plumbing & Heating MaintenanceGas, Plumbing-Sprinkler, Water/Sanitary
4 projects · most recent 04/28/2026
General Wiring
FiledStatusContractorScope
04/28/2026Permit IssuedMac Elect'l Contracting—
06/29/2024Permit IssuedSNB Electrical Contng—
12/06/2021CompleteModern Trend Electrical Contracting—
04/22/2020Permit IssuedE & M Electrical NYGeneral Wiring
1 project · most recent 01/18/2024
Concrete
FiledStatusContractorScope
01/18/2024Signed-offProcida ConstructionConcrete
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
11/19/2025Pass-Final Boiler Equipment InspectionPassView ↗
09/04/2024Pass-Final PL - UndergroundPassView ↗
08/26/2024Fail-Final PL - UndergroundFailView ↗
08/16/2024Fail-Final PL - More than 10 Requested FloorsFailView ↗
07/24/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 46
DateRequirementInspectorRole
07/20/2026Tenant Protection Plan Compliance—special
07/20/2026Sprinkler SystemsGEORGE GHEBRYALspecial
07/20/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
06/08/2026Tenant Protection Plan Compliance—special
06/08/2026Sprinkler SystemsGEORGE GHEBRYALspecial
06/08/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
02/05/2026Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
02/05/2026Sprinkler SystemsGEORGE GHEBRYALspecial
02/05/2026Tenant Protection Plan Compliance—special
12/10/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
12/10/2025Sprinkler SystemsGEORGE GHEBRYALspecial
12/10/2025Post-installed AnchorsGEORGE GHEBRYALspecial
12/10/2025Tenant Protection Plan Compliance—special
09/17/2025Post-installed AnchorsGEORGE GHEBRYALspecial
09/17/2025Tenant Protection Plan Compliance—special
09/17/2025Sprinkler SystemsGEORGE GHEBRYALspecial
09/17/2025Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
02/06/2025Maintenance informationGEORGE GHEBRYALenergy_progress
02/06/2025Tenant Protection Plan ComplianceGEORGE GHEBRYALspecial
02/06/2025Heating SystemsGEORGE GHEBRYALspecial
02/06/2025HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
02/06/2025HVAC-R and service water piping design and insulationGEORGE GHEBRYALenergy_progress
02/06/2025HVAC-R and service water heating equipmentGEORGE GHEBRYALenergy_progress
12/13/2023HVAC-R and service water heating system controlsGEORGE GHEBRYALenergy_progress
12/13/2023Energy Code Compliance InspectionsGEORGE GHEBRYALprogress
Latest 25 of 46.
166 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account