DOB09/26/2024FAILURE TO MAINTAIN.THERE'S 1 1/2"THICK MARBLE CLADDING AT THE EXP 1/2 CRNR UP TO 16TH STRY&ALSO @EXP2/3 NORTHEAST&EXP1/2(SOUTHWEST)CRNRS.@ EXP1/2(NORTHWEST)CRNR,4MARBLE PANELS HAD APPRX 2"OUTWRD.1.NYSPE QEWI TO IMMED EVAL THE MARBLE CLADDNG&DSGN RPAIRS,2.FILE FOR PRMTS BY 12/2/243.OBTN PRMTS&STRT WRK BY 12/16/24
DOB09/26/2024EMERGENCY WRK.THERES 1/2"THCK MARBLE CLADDNG@EXP1/2CRNR UP TO THE 16TH STRY&ALSO@EXP 2/3(NORTHEAST)CRNR,4MARBLE PANELS HAD APPRX2"OUTWRD BULGE@EXP2 SIDE ON 3RDSTRY.ALSO@EXP 1/2CRNR,2MARBLE PANELS.1.IMMED INSTLL HEAVY DUTY SDWALK SHED ALONG ENT FRNTGE ON EXP1 &EXP2,2.CMPLT EMRGNCY STBILIZATN WRK PRIOR TO INSTLL@EXP1/2
DOB09/26/2024PROVIDE APPRX 40 LINEAR FEET OF CONSTRUCTION FENCE @ EXPO#2 (WEST 40 S TREET) TO EXTEND TO THE CURB LINE & APPRX 30 LINEAR FEET OF CONSTRUCTI ON FENCE @ EXPO#1 (BROADWAY) TO EXTEND TO THE CURB LINE IN AN L SHAPE TO SAFEGUARD PUBLIC AND PROPERTY
DOB09/26/2024OBSERVED 2-EXTERIOR MARBLE PANEL APPROX. SIZE 4'-0" X 10'-0" EACH DISLODGED, BUILDING POPPED-OUT AND LOOSE ON 3RD FLOOR LEVEL AT THE CORNER OF EXPO # 01 & 02. BULGING LOOSE PANELS ARE HANGING OVER MTA SUBWAY ENTRANCE AT W 40 STREET AND POTENTIAL FALLING CONDITION.
DOB09/26/2024FAILURE TO MAINTAIN FACADE & APPURTENANCES. MARBLE CLADDING FAILURE @3 FL, EXP2, N ELEV. REMEDY:THE OWNER TO RETAIN SERVICE OF NYS REG DESIGN PROF WITH QEWI CERTIFICATE & MARBLE WORKS EXPERIENCE TO INSPECT & EVAL 100% ON ALL FACADE-MARBLE STONES CLADDING WORKS @ ALL ELEVS. PROVIDE REPORT FACADES@BUILDINGS.NYC.GOV NO LATER THAN 10/10/2024
DOB09/26/2024EMERGENCY WORK.AT THE EXP 1/2 CORNER,THERE WERE 4MARBLE PANELS W/A 24 OUTWRD BULGE@EXP SIDE ON 3RD STRY.ALSO AT EXP 1/2CRNR,2MARBLE PANELS HAD A 1/2 OUTWRD BYKGE@EXP 1 SIDE ON 3RD&4THFL LVL.1.IMMED INSTLL CONSTRCTN FENCE TO ENCLOSRE 15MIN OF SDWALK @EXP1&EXP2 FOR DSTNCE OF 30''ALNG EXP1&40'ALNG EXP2 TO SRRND
DOB09/26/2024EMERGENCY WORK.@THE EXP1/2 CRNR,THERE WAS 4MARBLE PANELS W/2" OUTWRD BLGE@EXP2 SIDE ON 3RD STRY.ALSO@EXP 1/2CRNR, MARBLE PANELS HAD A 1/2 OUTWRD BLGE@EXP1 SIDE ON 3RD&4THFL LEVELS.1.IMMED INSTLLSHRNG&BRACNG & RMVE BULGD MARBLE CLADDNG@DIRCTN OF PE,2.ALL WRK TO BE DRCTLY SPRVSD& DRCTD BY ONSITE NYSPE
DOB02/21/2022CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS
DOB04/05/2017FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
DOB07/28/1992V-DOB VIOLATION - ACTIVE
ECB09/24/2022REMOVAL OF SIDEWALK SHED WITHOUT DOB APPROVAL.NOTE AT TIME OF INSPECTION BUILDING FACADE WAS STILL DESIGNATED AS UNSAFE AND THE AMENDED FACADE REPORT(TR6)HAD NOT BEEN ACCEPTED.HOWEVER,SAFETY MEASURES HAD ALREADNothing owed — awaiting certificate of correction
ECB04/26/2022FAILURE TO TAKE AND PROVIDE SAFETY MEASURES SIDEWALK SHED,NETTING ETC,WHERE REQUIRED TO SECURE AND PROTECT PUBLIC SAFETY FROM DOCUMENTED UNSAFE FACADE THE TR6 TECNHNICAL REPORT RECEIVED FROM PA/PE ON 02/16/2022Nothing owed — awaiting certificate of correction
ECB12/04/2019A.C. 27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY JULY 1, 2019, IN AN OFFICE BUILDINNothing owed — awaiting certificate of correction
ECB06/11/201899BB5,100B7. 99BB5-CAT 1 TAG EXPIRED; 100B7-DEMARCATION LIGHTS INOPERATIVE.Nothing owed — awaiting certificate of correction
ECB08/02/201790L10,87D6,96L10,96B6,90D6 (90L10)REPAIR BOTTOM RUN STATION COVER COULD NOT BE CLOSED (87D6)SECURE TOP SIDE PANEL WALL BOTH SIDE BASE GUARD (96L10)REPAIR TOP INDICATION LIGHTS (96B6)PROPERLY SECURED CITY ID TAGNothing owed — awaiting certificate of correction