← Back
Shopping center, with or without parking
1430 RICHMOND AVENUE
STATEN ISLAND · New Springville-Willowbrook-Bulls Head-Travis · BIN 5031317
💬 Discuss this project
1957Year Built
1Stories
K6Building Class
R3XZoning
13,042 sfGross Floor Area
6Units
3 Open Violations ▸FDNY Report ↗
Shopping center, with or without parking · Owner of record: KJA HOLDINGS LLC · 28,265 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof3p · 3 filings · 18 docs
Floor 122p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KJA HOLDINGS LLC203/22/2026
1430 RICHMOND AV. ASSOC203/22/2026
RICHMOND ASSOC.103/22/2026
SHANANAGINS103/22/2026
RICHMOND AVENUE ASSOC.103/22/2026
THE OWNER OF 1430 RICHMON103/22/2026
HOLIDAY PLAZA503/21/2026
AVOCADO SUSHI V INC 10-20103/21/2026
MAGGYS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZENITH HOME INSPECTIONS106/30/2026
STEVEN R. SAVINO ARCHITECT PC706/15/2026
J&R DESIGN AND INSPECTION CORP.105/23/2022
ALBERTO ROMAN401/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGHQUALITY CONSTRUCTION VNW803/21/2026
HIGH QUALITY 338203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JOSEPH RIZZUTIGeneral Contractor303/21/2026
HIGH QUALITY CONSTRUCTIONGeneral Contractor207/08/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
JPI PLUMBING & HEATING INPlumbing107/08/2026
NEW YORK STANDARD MECH CORPPlumbing107/08/2026
SO PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEVEN R. SAVINO ARCHIT1216312/11/2025
J&R DESIGN AND INSPECTION6637105/23/2022
AR-TECH ENGINEERING, P.C.6659401/06/2021
Building Lifecycle
All (89)Filed (13)Permit Issued (7)Signed Off (4)Violation (28)Inspection (7)Special Inspection (30)
07/28/2026
Signed off — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - VERIZON. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S01419315-I1
06/30/2026
Filed — Alteration
ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - IN PROPERTY LINES - VERIZON. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S01419315-I1
06/15/2026
Filed — Alteration
CAP AND REMOVE EXISTING SANITARY FIXTURES AND PIPING AND CAP AND REMOVE THE GAS PIPING AND COMMERCIAL COOKING EQUIPMENT THAT EXIST IN LANDERS MARKET AND INSTALL PLUMBING FIXTURES FOR ADA BATHROOM.
S01289091-P3
04/09/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/06/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/06/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/07/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/29/2025
Filed — Alteration
CAP AND REMOVE EXISTING SANITARY FIXTURES AND PIPING AND CAP AND REMOVE THE GAS PIPING AND COMMERCIAL COOKING EQUIPMENT THAT EXIST IN LANDERS MARKET AND INSTALL PLUMBING FIXTURES FOR ADA BATHROOM.
S01289091-P2
12/19/2025
Permit issued — General Construction
S01289065-I1-GC
12/16/2025
Filed — Alteration
CAP AND REMOVE EXISTING SANITARY FIXTURES AND PIPING AND CAP AND REMOVE THE GAS PIPING AND COMMERCIAL COOKING EQUIPMENT THAT EXIST IN LANDERS MARKET AND INSTALL PLUMBING FIXTURES FOR ADA BATHROOM.
S01289091-P1
12/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
12/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
12/15/2025
Special inspection requirement — Interior lighting power
Steven Savino
12/15/2025
Special inspection requirement — Lighting controls
Steven Savino
12/15/2025
Special inspection requirement — Fire-Resistance Rated Construction
Steven Savino
12/15/2025
Special inspection requirement — Final
Steven Savino
12/11/2025
Filed — Alteration
REMOVE ALL NON-BEARING WALLS, DIVIDE THE EXISTING SPACE INTO 3 NEW VACANT SPACES AND CONSTRUCT DEMISING WALLS AND NEW DROP CEILING.
S01289065-P1
11/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
11/21/2025
Special inspection requirement — Final
Steven Savino
11/21/2025
Special inspection requirement — Lighting controls
Steven Savino
11/21/2025
Special inspection requirement — Interior lighting power
Steven Savino
11/21/2025
Special inspection requirement — Fire-Resistance Rated Construction
Steven Savino
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Steven Savino
10/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/22/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/26/2025
Permit issued — Plumbing
S01289091-I1-PL
09/23/2025
Filed — Alteration
CAP AND REMOVE EXISTING SANITARY FIXTURES AND PIPING AND CAP AND REMOVE THE GAS PIPING AND COMMERCIAL COOKING EQUIPMENT THAT EXIST IN LANDERS MARKET AND INSTALL PLUMBING FIXTURES FOR ADA BATHROOM.
S01289091-I1
09/23/2025
Filed — Alteration
IN-KIND REPLACEMENT OF 2- EXIST ROOF TOP UNITS CONNECTED TO EXIST. DUCT WORK AND 1-NEW HEAT PUMP ON EXIST. DUNNAGE ON ROOF WITH 1- NEW AIR HANDLER ON THE FIRST FLOOR.
S01289114-I1
09/23/2025
Filed — Alteration
REMOVE ALL NON-BEARING WALLS, DIVIDE THE EXISTING SPACE INTO 3 NEW VACANT SPACES AND CONSTRUCT DEMISING WALLS AND NEW DROP CEILING.
S01289065-I1
05/15/2025
Violation issued (FDNY_ORDER, closed)
05/15/2025
Violation issued (FDNY_ORDER, closed)
05/15/2025
Violation issued (FDNY_ORDER, closed)
06/27/2024
Violation issued (FDNY_NOV, closed)
05/31/2022
Signed off — Alteration
EXTERIOR REPLACE HVAC/RTU ON EXIST. COMMERCIAL USE BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00742538-I1
05/26/2022
Permit issued — Mechanical Systems
S00742538-I1-MS
05/23/2022
Filed — Alteration
EXTERIOR REPLACE HVAC/RTU ON EXIST. COMMERCIAL USE BUILDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00742538-I1
05/20/2022
Special inspection requirement — Mechanical Systems
Robert Truskosky
05/20/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Truskosky
05/20/2022
Special inspection requirement — Final
Robert Truskosky
05/20/2022
Special inspection requirement — Energy Code Compliance Inspections
Robert Truskosky
05/20/2022
Special inspection requirement — Fire-Resistance Rated Construction
Robert Truskosky
05/20/2022
Special inspection requirement — HVAC-R and service water heating equipment
Robert Truskosky
05/20/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Truskosky
05/20/2022
Special inspection requirement — HVAC-R and service water heating system controls
Robert Truskosky
05/04/2022
Violation issued (FDNY_NOV, closed)
12/10/2021
Signed off — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE WITH, REPLACE/NEW PLUMBING FIXTURES AND GAS EQUIPMENTS. FILED IN CONJUNCTION WITH DOB JOB#540187983. NO CHANGE OF USE, EGRESS, OR CERTIFICATE OF OCCUPA
S00417392-I1
11/23/2021
Permit issued — Plumbing
S00417392-I1-PL
05/28/2021
Permit issued — Plumbing
S00417392-I1-PL
04/27/2021
Signed off — Alteration
RENOVATION OF EXIST. COMMERCIAL SPACE WITH NEW HOOD SYSTEM AND REFRIGERATION SYSTEM AND HVAC DUCT WORK AS PER PLAN. THIS APPLICATION CONJUNCTION WITH JOB#540187983. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
S00417873-I1
01/08/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERTO ROMAN
01/08/2021
Special inspection requirement — Energy Code Compliance Inspections
ALBERTO ROMAN
01/06/2021
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE WITH, REPLACE/NEW PLUMBING FIXTURES AND GAS EQUIPMENTS. FILED IN CONJUNCTION WITH DOB JOB#540187983. NO CHANGE OF USE, EGRESS, OR CERTIFICATE OF OCCUPA
S00417392-P2
01/05/2021
Special inspection requirement — Energy Code Compliance Inspections
ALBERTO ROMAN
01/05/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALBERTO ROMAN
11/04/2020
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE WITH, REPLACE/NEW PLUMBING FIXTURES AND GAS EQUIPMENTS. FILED IN CONJUNCTION WITH DOB JOB#540187983. NO CHANGE OF USE, EGRESS, OR CERTIFICATE OF OCCUPA
S00417392-P1
10/26/2020
Permit issued — Mechanical Systems
S00417873-I1-MS
10/23/2020
Filed — Alteration
RENOVATION OF EXIST. COMMERCIAL SPACE WITH NEW HOOD SYSTEM AND REFRIGERATION SYSTEM AND HVAC DUCT WORK AS PER PLAN. THIS APPLICATION CONJUNCTION WITH JOB#540187983. NO CHANGE OF USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
S00417873-I1
10/23/2020
Permit issued — Plumbing
S00417392-I1-PL
10/22/2020
Filed — Alteration
RENOVATION OF EXISTING COMMERCIAL SPACE WITH, REPLACE/NEW PLUMBING FIXTURES AND GAS EQUIPMENTS. FILED IN CONJUNCTION WITH DOB JOB#540187983. NO CHANGE OF USE, EGRESS, OR CERTIFICATE OF OCCUPA
S00417392-I1
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedJOSEPH RIZZUTI12/19/2025
DOB NOWPlumbingPermit IssuedJPI PLUMBING & HEATING IN09/26/2025
DOB NOWMechanical SystemsSigned-offHIGH QUALITY CONSTRUCTION05/26/2022
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.11/23/2021
DOB NOWPlumbingSigned-offNEW YORK STANDARD MECH CORP05/28/2021
DOB NOWMechanical SystemsSigned-offHIGH QUALITY CONSTRUCTION10/26/2020
DOB NOWPlumbingSigned-offNICHOLAS SUIDA10/23/2020
BISOTISSUEDHIGH QUALITY CONSTRUCTION10/23/2020
BISPLISSUEDTRI STATE PLBG & HTG INC09/29/2017
BISMHISSUEDKK HVAC INC09/26/2017
BIS—ISSUEDUNITECH DESIGN INC04/15/2016
BISFPISSUEDFIRE COMADD CO., INC06/16/2008
BISMHISSUEDHASSAN CHANNAOUI06/15/2006
BISMHISSUEDHASSAN CHANNAOUI06/09/2004
BISMHISSUEDNEW IMAGE CONSTRUCTION INC.02/18/2004
BISPLISSUEDKEYSPAN PLUMBING SOLUTIONS02/18/2004
BISOTISSUEDA&M TOTAL BUILDING & CONDO MAINT09/16/2003
BIS—ISSUEDFRANK TORRONE & SONS INC05/15/2003
BISPLISSUEDEARLY PLBG & HTG INC09/10/2002
BISFPRE-ISSUEDFIRE COMMAND CO. INC.07/28/2000
BIS—ISSUEDR.G.M. SIGNS INC12/21/1999
BIS—ISSUEDMIDWOOD SIGN INC.07/29/1993
BISPLISSUEDGATEWAY PL. & HEATING07/29/1991
BISOTISSUEDIMMACULATE REMODELING, INC.07/12/1991
1 project · most recent 09/23/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
09/23/2025——Air Conditioning Systems, Heating Systems
Cooling
Luxaire KE048H12A 4 tons · Rooftop Unit ×1
KE060H12A 5 tons · Condensing Unit ×1
Mitsubishi Electric MXZ-SM48NAM2 4 tons · Split System ×1
PVFY-P48NAMU-E1 5 tons · Vrf Indoor ×1
Heating
Luxaire KE048H12A 125,000 BTU · Rooftop Unit ×1
KE060H12A 125,000 BTU · Condensing Unit ×1
Mitsubishi Electric MXZ-SM48NAM2 54,000 BTU · Condensing Unit ×2
1 project · most recent 06/15/2026
Gas Water/Sanitary
FiledStatusContractorScope
06/15/2026Permit IssuedJPI PLUMBING & HEATING INGas, Water/Sanitary
1 project · most recent 10/27/2020
General Wiring
FiledStatusContractorScope
10/27/2020CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
04/09/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/06/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/06/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/07/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/22/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/07/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
12/15/2025Energy Code Compliance InspectionsSteven Savinoprogress
12/15/2025Fire-Resistant Penetrations and JointsSteven Savinospecial
12/15/2025Interior lighting powerSteven Savinoenergy_progress
12/15/2025Lighting controlsSteven Savinoenergy_progress
12/15/2025Fire-Resistance Rated ConstructionSteven Savinoprogress
12/15/2025FinalSteven Savinoprogress
11/21/2025Energy Code Compliance InspectionsSteven Savinoprogress
11/21/2025FinalSteven Savinoprogress
11/21/2025Lighting controlsSteven Savinoenergy_progress
11/21/2025Interior lighting powerSteven Savinoenergy_progress
11/21/2025Fire-Resistance Rated ConstructionSteven Savinoprogress
11/21/2025Fire-Resistant Penetrations and JointsSteven Savinospecial
05/20/2022Mechanical SystemsRobert Truskoskyspecial
05/20/2022Fire-Resistant Penetrations and JointsRobert Truskoskyspecial
05/20/2022FinalRobert Truskoskyprogress
05/20/2022Energy Code Compliance InspectionsRobert Truskoskyprogress
05/20/2022Fire-Resistance Rated ConstructionRobert Truskoskyprogress
05/20/2022HVAC-R and service water heating equipmentRobert Truskoskyenergy_progress
05/20/2022HVAC-R and service water piping design and insulationRobert Truskoskyenergy_progress
05/20/2022HVAC-R and service water heating system controlsRobert Truskoskyenergy_progress
01/08/2021Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
01/08/2021Energy Code Compliance InspectionsALBERTO ROMANprogress
01/05/2021Energy Code Compliance InspectionsALBERTO ROMANprogress
01/05/2021Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
10/22/2020FinalALBERTO ROMANprogress
Latest 25 of 31.
▾Documents — 123 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch9
08/24/2026S00742538-I1Request digital key ↗
08/18/2026S01289114-I1Request digital key ↗
08/17/2026S01289065-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/25/2026S00417392-I1Request digital key ↗
08/15/2026S00417392-P2Request digital key ↗
08/15/2026S00417392-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/25/2026S00417873-I1Request digital key ↗
▸Applications & Permits13
▸BISWORK PERMIT APPLICATION7
10/23/2020540187983Open ↗
10/22/2020540187983Open ↗
10/04/2017520315016Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
10/19/2020540187983Open ↗
11/15/2017520315016Open ↗
09/26/2017520315016Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications44
▸DOB NOWProgress Inspector Seal & Signature15
09/01/2026S00417392-I1Open ↗
09/01/2026S00742538-I1Open ↗
09/01/2026S00742538-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/25/2026S00417873-I1Open ↗
08/18/2026S01289114-I1Open ↗
08/17/2026S01289091-P2Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026S00417392-I1Open ↗
09/01/2026S00742538-I1Open ↗
08/30/2026S01289065-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
12/26/2017520315016Open ↗
09/26/2017520315016Open ↗
05/11/2015520232784Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
10/19/2020540187983Open ↗
09/26/2017520315016Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/19/2020540187983Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/19/2020540187983Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/26/2017520315016Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
09/26/2017520315016Open ↗
03/23/2015520232784Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
12/26/2017520315016Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
09/26/2017520315016Open ↗
▸BISSTREET TREE CHECKLIST1
03/23/2015520232784Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026S00417873-I1Open ↗
08/13/2026S00417392-I1Open ↗
08/13/2026S00417392-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
10/19/2020540187983Open ↗
09/26/2017520315016Open ↗
02/22/2016520265515Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/04/2008510043748Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/03/2021540187983Open ↗
10/23/2020540187983Open ↗
10/22/2020540187983Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/26/2017520315016Open ↗
09/26/2017520315016Open ↗
05/11/2015520232784Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
05/03/2021540187983Open ↗
12/26/2017520315016Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/19/2020540187983Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026S00742538-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY4
05/03/2021540187983Open ↗
05/03/2021540187983Open ↗
10/23/2020540187983Open ↗
Showing 3 of 4 on file for this type
▸Approvals, Objections & Sign-offs11
▸BISLETTERS - SUPPORTING DOCUMENTATION4
12/26/2017520315016Open ↗
12/26/2017520315016Open ↗
12/26/2017520315016Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
09/26/2017520315016Open ↗
02/22/2016520265515Open ↗
03/23/2015520232784Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
05/03/2021540187983Open ↗
12/26/2017520315016Open ↗
07/26/2016520265515Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
05/03/2021540187983Open ↗
10/19/2020540187983Open ↗
12/26/2017520315016Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
09/26/2017520315016Open ↗
02/22/2016520265515Open ↗
03/23/2015520232784Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/19/2020540187983Open ↗
▸BISBOROUGH INTAKE FORM1
12/26/2017520315016Open ↗
▸BISADDITIONAL INFORMATION1
11/15/2017520315016Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/11/2015520232784Open ↗