← Back
Two family frame
1433 71 STREET
BROOKLYN · BIN 3157151
💬 Discuss this project
1920Year Built
2Stories
B2Building Class
R5Zoning
2,080 sfGross Floor Area
2Units
Two family frame · 2,000 sf lot · 1.04 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Floor 11p · 1 filing · 14 docs
Cellar7p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HJ DESIGN STUDIO1207/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/24/2023$1.1M—Private party → Private party$534/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY ACORN ENGINEERING PLLC408/07/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ADVANCE TEAM CONSULTANT *General Contractor303/21/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NY ACOM ENGINEERING PLLC7061408/07/2023
Building Lifecycle
All (43)Filed (4)Permit Issued (2)Signed Off (2)Inspection (5)Special Inspection (30)
09/18/2023
Signed off — Alteration
INSTALL NEW BOILER AND H.W.H IN EXISTING 2 STORY BUILDING. RELOCATED KITCHEN FIXTURES, PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00828671-I1
09/18/2023
Signed off — Alteration
PROPOSED INTERIOR RENOVATION OF EXISTING 2 STORY BUILDING. RELOCATED KITCHEN FIXTURES; REMOVE EXISTING PARTITIONS; INSTALL NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT. CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00824059-I1
08/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
08/08/2023
Special inspection requirement — Fenestration air leakage
YING JIANG
08/08/2023
Special inspection requirement — Insulation placement and R values
YING JIANG
08/08/2023
Special inspection requirement — Duct leakage testing, insulation and design
YING JIANG
08/08/2023
Special inspection requirement — HVAC-R and service water heating equipment
YING JIANG
08/08/2023
Special inspection requirement — Maintenance information
YING JIANG
08/08/2023
Special inspection requirement — Fenestration areas
YING JIANG
08/08/2023
Special inspection requirement — Permanent certificate
YING JIANG
08/08/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
YING JIANG
08/08/2023
Special inspection requirement — HVAC-R and service water heating system controls
YING JIANG
08/08/2023
Special inspection requirement — Interior lighting power
YING JIANG
08/08/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
YING JIANG
08/08/2023
Special inspection requirement — Air barrier - visual inspection
YING JIANG
08/08/2023
Special inspection requirement — Final
YING JIANG
08/08/2023
Special inspection requirement — Fire-Resistance Rated Construction
YING JIANG
08/08/2023
Special inspection requirement — Energy Code Compliance Inspections
YING JIANG
08/07/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF EXISTING 2 STORY BUILDING. RELOCATED KITCHEN FIXTURES; REMOVE EXISTING PARTITIONS; INSTALL NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT. CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00824059-P1
08/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
08/03/2023
Special inspection requirement — Energy Code Compliance Inspections
YING JIANG
08/02/2023
Filed — Alteration
INSTALL NEW BOILER AND H.W.H IN EXISTING 2 STORY BUILDING. RELOCATED KITCHEN FIXTURES, PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00828671-P2
07/30/2023
Special inspection requirement — Energy Code Compliance Inspections
YING JIANG
07/30/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
YING JIANG
06/13/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/05/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/01/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/29/2023
Special inspection requirement — HVAC-R and service water heating equipment
YING JIANG
03/29/2023
Special inspection requirement — Insulation placement and R values
YING JIANG
03/29/2023
Special inspection requirement — Permanent certificate
YING JIANG
03/29/2023
Special inspection requirement — Fenestration areas
YING JIANG
03/29/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
YING JIANG
03/29/2023
Special inspection requirement — Maintenance information
YING JIANG
03/29/2023
Special inspection requirement — Fenestration air leakage
YING JIANG
03/29/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
YING JIANG
03/29/2023
Special inspection requirement — HVAC-R and service water heating system controls
YING JIANG
03/29/2023
Special inspection requirement — Air barrier - visual inspection
YING JIANG
03/28/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/24/2023
Permit issued — Plumbing
B00828671-I1-PL
02/21/2023
Filed — Alteration
INSTALL NEW BOILER AND H.W.H IN EXISTING 2 STORY BUILDING. RELOCATED KITCHEN FIXTURES, PLUMBING WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00828671-I1
02/15/2023
Permit issued — General Construction
B00824059-I1-GC
02/14/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATION OF EXISTING 2 STORY BUILDING. RELOCATED KITCHEN FIXTURES; REMOVE EXISTING PARTITIONS; INSTALL NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT. CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00824059-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP02/24/2023
DOB NOWGeneral ConstructionSigned-offADVANCE TEAM CONSULTANT *02/15/2023
2 projects · most recent 02/27/2023
General Wiring
FiledStatusContractorScope
02/27/2023CompleteJ Y ELECTRIC INC3 meters, 3 new_meters
01/26/2023CompleteJ Y ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
06/13/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/05/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/01/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/28/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
08/08/2023Fire-Resistant Penetrations and JointsYING JIANGspecial
08/08/2023Fenestration air leakageYING JIANGenergy_progress
08/08/2023Insulation placement and R valuesYING JIANGenergy_progress
08/08/2023Duct leakage testing, insulation and designYING JIANGenergy_progress
08/08/2023HVAC-R and service water heating equipmentYING JIANGenergy_progress
08/08/2023Maintenance informationYING JIANGenergy_progress
08/08/2023Fenestration areasYING JIANGenergy_progress
08/08/2023Permanent certificateYING JIANGenergy_progress
08/08/2023HVAC-R and service water piping design and insulationYING JIANGenergy_progress
08/08/2023HVAC-R and service water heating system controlsYING JIANGenergy_progress
08/08/2023Interior lighting powerYING JIANGenergy_progress
08/08/2023Fenestration and door U-factor and product ratingsYING JIANGenergy_progress
08/08/2023Air barrier - visual inspectionYING JIANGenergy_progress
08/08/2023FinalYING JIANGprogress
08/08/2023Fire-Resistance Rated ConstructionYING JIANGprogress
08/08/2023Energy Code Compliance InspectionsYING JIANGprogress
08/03/2023Fire-Resistant Penetrations and JointsYING JIANGspecial
08/03/2023Energy Code Compliance InspectionsYING JIANGprogress
07/30/2023Energy Code Compliance InspectionsYING JIANGprogress
07/30/2023Fire-Resistant Penetrations and JointsYING JIANGspecial
03/29/2023HVAC-R and service water heating equipmentYING JIANGenergy_progress
03/29/2023Insulation placement and R valuesYING JIANGenergy_progress
03/29/2023Permanent certificateYING JIANGenergy_progress
03/29/2023Fenestration areasYING JIANGenergy_progress
03/29/2023HVAC-R and service water piping design and insulationYING JIANGenergy_progress
Latest 25 of 36.
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/27/2026B00824059-P1Request digital key ↗
08/27/2026B00824059-I1Request digital key ↗
08/27/2026B00828671-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026B00828671-I1Open ↗
08/13/2026B00828671-P2Open ↗
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026B00828671-P2Open ↗
08/27/2026B00824059-P1Open ↗
08/27/2026B00824059-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/27/2026B00824059-P1Open ↗
08/27/2026B00824059-I1Open ↗
08/27/2026B00828671-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/31/2026B00828671-P2Open ↗
08/27/2026B00824059-P1Open ↗
08/26/2026B00824059-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/27/2026B00824059-P1Open ↗
08/27/2026B00824059-I1Open ↗
08/27/2026B00828671-I1Open ↗
Showing 3 of 4 on file for this type