← Back
Primarily 1 family with 1 store or office
1435 FULTON STREET
BROOKLYN · Bedford-Stuyvesant (West) · BIN 3338748
💬 Discuss this project
1910Year Built
2Stories
S1Building Class
R7DZoning
1,620 sfGross Floor Area
2Units
Primarily 1 family with 1 store or office · Owner of record: EMPIRE MANAGEMENT RESOLUTION LLC · 1,692 sf lot · 0.96 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 28p · 1 filing · 20 docs
Floor 1
Cellar10p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1435 FULTON STREET1807/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/30/2023$1.4M—— → —$848/sf building
02/24/2021$1.0M—— → —$623/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AZ PROFESSIONAL ENGINEERING PC601/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
92 DESIGN803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACS ENVIRONMENTAL & CONSTGeneral Contractor303/21/2026
TRI CITY MECHANICAL GROUP CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ASKON ARCHITECT, P.C.3596209/25/2022
AZ PROFESSIONAL ENGINEERI766209/25/2022
Building Lifecycle
All (34)Filed (6)Permit Issued (3)Signed Off (1)Inspection (10)Special Inspection (14)
04/24/2024
Inspection — Fail-Final Construction Permit Withdrawal
Fail
View inspection ↗
03/22/2024
Inspection — Fail-Final Construction Permit Withdrawal
Fail
View inspection ↗
08/28/2023
Signed off — Alteration
APPLICATION FILE TO INSTALL NEW TANKLESS GAS BOILER/HWH WALL MOUNTED AT 2ND FLOOR AS PER PLAN.
B00506945-I1
02/27/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/13/2023
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/13/2023
Filed — Alteration
APPLICATION FILE TO INSTALL NEW TANKLESS GAS BOILER/HWH WALL MOUNTED AT 2ND FLOOR AS PER PLAN.
B00506945-P3
12/28/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
12/07/2022
Permit issued — Boiler Equipment
B00506945-S2-BE
11/20/2022
Filed — Alteration
APPLICATION FILE TO INSTALL NEW TANKLESS GAS BOILER/HWH WALL MOUNTED AT 2ND FLOOR AS PER PLAN.
B00506945-S2
10/20/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/14/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/27/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
VIJAY KUMAR
09/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
VIJAY KUMAR
09/27/2022
Special inspection requirement — Final
VIJAY KUMAR
09/27/2022
Special inspection requirement — Fire-Resistance Rated Construction
VIJAY KUMAR
09/27/2022
Special inspection requirement — Insulation placement and R values
VIJAY KUMAR
09/27/2022
Special inspection requirement — Lighting in dwelling units
VIJAY KUMAR
09/27/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
09/27/2022
Special inspection requirement — Energy Code Compliance Inspections
Akeeb Shekoni
09/25/2022
Filed — Alteration
APPLICATION FILE TO INSTALL NEW TANKLESS GAS BOILER/HWH WALL MOUNTED AT 2ND FLOOR AS PER PLAN.
B00506945-P1
09/25/2022
Filed — Alteration
APPLICATION FILE TO INSTALL NEW TANKLESS GAS BOILER/HWH WALL MOUNTED AT 2ND FLOOR AS PER PLAN.
B00506945-P2
09/22/2022
Special inspection requirement — Final
VIJAY KUMAR
09/22/2022
Special inspection requirement — Fire-Resistance Rated Construction
VIJAY KUMAR
09/22/2022
Special inspection requirement — Insulation placement and R values
VIJAY KUMAR
09/22/2022
Special inspection requirement — Lighting in dwelling units
VIJAY KUMAR
09/22/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
VIJAY KUMAR
09/22/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
VIJAY KUMAR
08/19/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/22/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/22/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/24/2022
Permit issued — Plumbing
B00506945-S1-PL
12/02/2021
Filed — Alteration
APPLICATION FILE TO INSTALL NEW TANKLESS GAS BOILER/HWH WALL MOUNTED AT 2ND FLOOR AS PER PLAN.
B00506945-S1
08/20/2021
Permit issued — General Construction
B00506945-I1-GC
04/23/2021
Filed — Alteration
APPLICATION FILE TO INSTALL NEW TANKLESS GAS BOILER/HWH WALL MOUNTED AT 2ND FLOOR AS PER PLAN.
B00506945-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offFLAVIO MECHANICAL CORP12/07/2022
DOB NOWPlumbingPermit IssuedFLAVIO MECHANICAL CORP01/24/2022
DOB NOWGeneral ConstructionSigned-offACS ENVIRONMENTAL & CONST08/20/2021
BISOTISSUEDKORMAN DESIGN & BUILD08/01/2000
1 project · most recent 10/25/2021
General Wiring
FiledStatusContractorScope
10/25/2021CompleteRONEY ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/24/2024Fail-Final Construction Permit WithdrawalFailView ↗
03/22/2024Fail-Final Construction Permit WithdrawalFailView ↗
02/27/2023Pass-Final General Construction Non-Directive 14PassView ↗
02/13/2023Fail-Final General Construction Non-Directive 14FailView ↗
12/28/2022Pass-Final Boiler Equipment InspectionPassView ↗
10/20/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/14/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/19/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/22/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/22/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
09/27/2022Structural Stability – Alterations of existing buildingsVIJAY KUMARspecial
09/27/2022Fire-Resistant Penetrations and JointsVIJAY KUMARspecial
09/27/2022FinalVIJAY KUMARprogress
09/27/2022Fire-Resistance Rated ConstructionVIJAY KUMARprogress
09/27/2022Insulation placement and R valuesVIJAY KUMARenergy_progress
09/27/2022Lighting in dwelling unitsVIJAY KUMARenergy_progress
09/27/2022Fire-Resistant Penetrations and JointsAkeeb Shekonispecial
09/27/2022Energy Code Compliance InspectionsAkeeb Shekoniprogress
09/22/2022FinalVIJAY KUMARprogress
09/22/2022Fire-Resistance Rated ConstructionVIJAY KUMARprogress
09/22/2022Insulation placement and R valuesVIJAY KUMARenergy_progress
09/22/2022Lighting in dwelling unitsVIJAY KUMARenergy_progress
09/22/2022Fire-Resistant Penetrations and JointsVIJAY KUMARspecial
09/22/2022Structural Stability – Alterations of existing buildingsVIJAY KUMARspecial
▾Documents — 32 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/28/2026B00506945-S1Request digital key ↗
08/28/2026B00506945-S2Request digital key ↗
08/28/2026B00506945-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B00506945-P1Open ↗
09/01/2026B00506945-P1Open ↗
09/01/2026B00506945-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/28/2026B00506945-S1Open ↗
08/28/2026B00506945-I1Open ↗
08/28/2026B00506945-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B00506945-P1Open ↗
09/01/2026B00506945-P1Open ↗
08/30/2026B00506945-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/28/2026B00506945-I1Open ↗
08/28/2026B00506945-P2Open ↗
08/28/2026B00506945-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00506945-I1Open ↗
▸Other Documents1
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B00506945-I1Open ↗