← Back
Primarily 2 family with 1 store or office
1437 FLATBUSH AVENUE
BROOKLYN · Flatbush · BIN 3121662
💬 Discuss this project
1910Year Built
3Stories
S2Building Class
R7AZoning
3,270 sfGross Floor Area
3Units
14 Open Violations 13 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · 1,870 sf lot · 1.75 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 26p · 2 filings · 10 docs
Floor 1
Site & exterior5p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ DESIGN GROUP309/06/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor107/08/2026
BT'S PLUMBING AND HEATINGPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275209/06/2024
Building Lifecycle
All (28)Filed (3)Permit Issued (2)Violation (15)Inspection (4)Special Inspection (4)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/17/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/11/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/19/2025
Permit issued — Plumbing
B01001863-I1-PL
11/04/2024
Violation issued (ECB, open)
Boilers
10/16/2024
Permit issued — General Construction
B01001841-I1-GC
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/06/2024
Filed — Alteration
INTERIOR RENOVATION TO SECOND FLOOR TO REPAIR WATER AND SMOKE DAMAGE AND REMOVAL OF REAR ONE STORY ENCLOSURE TO ADDRESS VIOLATION # 39066400Y.
B01001841-P1
09/06/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
09/06/2024
Special inspection requirement — Final
HARI SONI
09/04/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
09/04/2024
Special inspection requirement — Final
HARI SONI
02/07/2024
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH GC # B01001841. REPLACEMENT OF PLUMBING FIXTURES AND PIPING WITH NEW VENTING AND VALVES.
B01001863-I1
02/07/2024
Filed — Alteration
INTERIOR RENOVATION TO SECOND FLOOR TO REPAIR WATER AND SMOKE DAMAGE AND REMOVAL OF REAR ONE STORY ENCLOSURE TO ADDRESS VIOLATION # 39066400Y.
B01001841-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/21/2022
Violation issued (ECB, open)
Construction
12/28/2020
Violation issued (HPD, open)
I
12/26/2020
Violation issued (HPD, open)
C
10/11/2016
Violation issued (HPD, open)
B
10/11/2016
Violation issued (HPD, open)
C
10/11/2016
Violation issued (HPD, open)
B
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBT'S PLUMBING AND HEATING03/19/2025
DOB NOWGeneral ConstructionPermit IssuedJ&J DESIGNS INC10/16/2024
3 projects · most recent 02/27/2025
General Wiring
FiledStatusContractorScope
02/27/2025Permit IssuedINDY ELECTRIC CORP.General Wiring
12/12/2024Permit IssuedWCK ELECTRIC CORP.General Wiring
07/30/2024Permit IssuedJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/11/2025Fail-Final CND-Occupancy InspectionFailView ↗
04/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
09/06/2024Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
09/06/2024FinalHARI SONIprogress
09/04/2024Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
09/04/2024FinalHARI SONIprogress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026B01001863-I1Request digital key ↗
08/24/2026B01001841-I1Request digital key ↗
08/24/2026B01001841-P1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026B01001841-P1Open ↗
08/24/2026B01001841-I1Open ↗
08/13/2026B01001863-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B01001841-I1Open ↗
08/25/2026B01001841-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026B01001841-I1Open ↗
08/25/2026B01001841-P1Open ↗