← Back
Church, synagogue, chapel
1437 LONGFELLOW AVENUE
BRONX · BIN 2010830
💬 Discuss this project
1930Year Built
1Stories
M1Building Class
R7-1Zoning
3,360 sfGross Floor Area
1Units
Church, synagogue, chapel · 5,000 sf lot · 0.67 FAR built · Flood zone X
Locations of Work
Plumbing
Roof1 filing · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CHRISTIAN COMMUNITY CHURCH403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
COLOMBO ARCHITECTURAL STUDIO PC203/23/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BEST CONTRACTING CORPGeneral Contractor303/21/2026
A P PLUMBING&HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292203/23/2020
Building Lifecycle
All (12)Filed (2)Permit Issued (2)Signed Off (1)Special Inspection (7)
04/02/2020
Signed off — Alteration
Direct replacement of roof package HVAC unit, connect to existing ductwork. No change in use, egress or occupancy.
X00307973-I1
03/27/2020
Permit issued — Plumbing
X00307973-S1-PL
03/23/2020
Filed — Alteration
Direct replacement of roof package HVAC unit, connect to existing ductwork. No change in use, egress or occupancy.
X00307973-S1
03/20/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
02/26/2020
Permit issued — Mechanical Systems
X00307973-I1-MS
02/25/2020
Filed — Alteration
Direct replacement of roof package HVAC unit, connect to existing ductwork. No change in use, egress or occupancy.
X00307973-I1
02/01/2020
Special inspection requirement — Mechanical Systems
Jose Santos
02/01/2020
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
02/01/2020
Special inspection requirement — Final
Yahaira Volquez Colombo
02/01/2020
Special inspection requirement — Maintenance information
Jose Santos
02/01/2020
Special inspection requirement — HVAC insulation and sealing
Jose Santos
02/01/2020
Special inspection requirement — HVAC and service water heating equipment
Jose Santos
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedA P PLUMBING&HEATING INC03/27/2020
DOB NOWMechanical SystemsSigned-offBEST CONTRACTING CORP02/26/2020
BIS—ISSUEDBUILD TECH CONSTRUCTION CORP.06/23/2006
BIS—ISSUEDBUILD TECH CONSTRUCTION CORP.03/22/2006
BIS—ISSUEDATTIVEL MANAGEMENT CORP04/11/2005
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
03/20/2020Fire-Resistant Penetrations and JointsJose Santosspecial
02/01/2020Mechanical SystemsJose Santosspecial
02/01/2020Fire-Resistant Penetrations and JointsJose Santosspecial
02/01/2020FinalYahaira Volquez Colomboprogress
02/01/2020Maintenance informationJose Santosenergy_progress
02/01/2020HVAC insulation and sealing Jose Santosenergy_progress
02/01/2020HVAC and service water heating equipment Jose Santosenergy_progress
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026X00307973-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
08/26/2026X00307973-S1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWProgress Inspector Seal & Signature4
08/28/2026X00307973-I1Open ↗
08/28/2026X00307973-I1Open ↗
08/28/2026X00307973-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026X00307973-S1Open ↗
08/28/2026X00307973-I1Open ↗
08/28/2026X00307973-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/26/2026X00307973-S1Open ↗
08/26/2026X00307973-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/26/2026X00307973-S1Open ↗
08/26/2026X00307973-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/26/2026X00307973-S1Open ↗