← Back
Two family brick
1439 85 STREET
BROOKLYN · BIN 3164995
💬 Discuss this project
1930Year Built
2Stories
B1Building Class
R4Zoning
1,840 sfGross Floor Area
2Units
Two family brick · 2,475 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar5p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/09/2025$1.3M—— → —$707/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC109/23/2025
G. MASUCCI ARCHITECTS, LLC409/16/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor303/21/2026
PIPESTYLISTS, INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854109/23/2025
NIC 88 CORP8371209/16/2025
NIC DESIGN INC9758203/27/2025
Building Lifecycle
All (46)Filed (5)Permit Issued (4)Signed Off (3)Inspection (4)Special Inspection (30)
12/04/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01291495-I1
10/09/2025
Signed off — Alteration
INSTALL NEW H.W.H., NEW PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01198132-I1
10/09/2025
Signed off — Alteration
INSTALL NEW H.W.H., NEW PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01198132-S1
10/06/2025
Permit issued — Solar
B01291495-I1-SL
09/23/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON ROOF. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01291495-I1
09/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
09/22/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
09/22/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
09/22/2025
Special inspection requirement — Final
TOM PETERSEN
09/22/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
09/17/2025
Special inspection requirement — Interior lighting power
Eric Sun
09/17/2025
Special inspection requirement — Duct leakage testing, insulation and design
Eric Sun
09/17/2025
Special inspection requirement — Maintenance information
Eric Sun
09/17/2025
Special inspection requirement — Mechanical Systems
Eric Sun
09/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
09/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
09/17/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
09/17/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
09/17/2025
Special inspection requirement — Final
Eric Sun
09/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
09/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
09/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
09/17/2025
Special inspection requirement — Ventilation and air distribution system
Eric Sun
09/16/2025
Filed — Alteration
INSTALL NEW H.W.H., NEW PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01198132-P4
09/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
09/16/2025
Special inspection requirement — Mechanical Systems
Eric Sun
09/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
09/16/2025
Special inspection requirement — Final
Eric Sun
09/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
09/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
09/16/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
09/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
09/16/2025
Special inspection requirement — Maintenance information
Eric Sun
09/16/2025
Special inspection requirement — Duct leakage testing, insulation and design
Eric Sun
09/16/2025
Special inspection requirement — Ventilation and air distribution system
Eric Sun
09/16/2025
Special inspection requirement — Interior lighting power
Eric Sun
09/05/2025
Filed — Alteration
INSTALL NEW H.W.H., NEW PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01198132-P3
06/06/2025
Permit issued — Plumbing
B01198132-S1-PL
06/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/03/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/29/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/02/2025
Permit issued — Plumbing
B01198132-S1-PL
03/27/2025
Filed — Alteration
INSTALL NEW H.W.H., NEW PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01198132-S1
03/27/2025
Permit issued — Mechanical Systems
B01198132-I1-GC-CX
03/25/2025
Filed — Alteration
INSTALL NEW H.W.H., NEW PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01198132-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offTOM PETERSEN ARCHITECT, LLC10/06/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC06/06/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC04/02/2025
DOB NOWMechanical SystemsSigned-offCUBE BUILDERS GROUP NY03/27/2025
1 project · most recent 09/23/2025
FiledStatusContractorScope
09/23/2025CompleteVENTURE HOME SOLAR LLC—
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/03/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/03/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/29/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
09/22/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
09/22/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
09/22/2025Energy Code Compliance InspectionsTOM PETERSENprogress
09/22/2025FinalTOM PETERSENprogress
09/22/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
09/17/2025Interior lighting powerEric Sunenergy_progress
09/17/2025Duct leakage testing, insulation and designEric Sunenergy_progress
09/17/2025Maintenance informationEric Sunenergy_progress
09/17/2025Mechanical SystemsEric Sunspecial
09/17/2025Fire-Resistant Penetrations and JointsEric Sunspecial
09/17/2025Fire-Resistance Rated ConstructionEric Sunprogress
09/17/2025Energy Code Compliance InspectionsEric Sunprogress
09/17/2025Insulation placement and R valuesEric Sunenergy_progress
09/17/2025FinalEric Sunprogress
09/17/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
09/17/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
09/17/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
09/17/2025Ventilation and air distribution systemEric Sunenergy_progress
09/16/2025Fire-Resistant Penetrations and JointsEric Sunspecial
09/16/2025Mechanical SystemsEric Sunspecial
09/16/2025Energy Code Compliance InspectionsEric Sunprogress
09/16/2025FinalEric Sunprogress
09/16/2025Fire-Resistance Rated ConstructionEric Sunprogress
09/16/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
09/16/2025Insulation placement and R valuesEric Sunenergy_progress
Latest 25 of 36.
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/22/2026B01198132-I1Request digital key ↗
08/22/2026B01198132-S1Request digital key ↗
08/22/2026B01198132-P4Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026B01198132-S1Open ↗
08/13/2026B01198132-P3Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B01198132-P3Open ↗
09/01/2026B01198132-P3Open ↗
08/28/2026B01291495-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/22/2026B01198132-I1Open ↗
08/22/2026B01198132-S1Open ↗
08/22/2026B01198132-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01198132-P3Open ↗
08/28/2026B01291495-I1Open ↗
08/26/2026B01198132-P4Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/22/2026B01198132-P4Open ↗
08/22/2026B01198132-I1Open ↗
08/22/2026B01198132-P3Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01291495-I1Open ↗