DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB08/29/1995V-DOB VIOLATION - ACTIVE
DOB06/08/1994V-DOB VIOLATION - ACTIVE
ECB09/08/1997WORK DONE WITHOUT A PERMIT. (REAR YARD) NOTE: 1 A CONCRETE SLAB HAS BEEN POURED AND ON IT PLACED A WALK-IN REFRIGETOR BOX (APPROX 10'X12') 2 A METAL SHIPPING/STORAGE CONTAINER ALSO PLACED. IN REAR-YARD (APROXNothing owed — awaiting certificate of correction
ECB09/04/1997WORK DOES NOT CONFORM TO APPROVED PLANS. NOTED; ONE DOOR AND ONE WINDOW AT LEFT/ REAR OF BUILDING HAVE BEEN SEALED-UP (ELIMINATED), WHICH IS CONTRARY TO APPROVED PLANS FOR ALT 174/63 REMEDY: CONFORM OT APPROVNothing owed — awaiting certificate of correction
ECB02/11/1993WORK DONE WITHOUT A PERMIT. NOTED. 1.A CONCRETE SLAB HAS BEEN POURED, AND ON IT PLACED A WALK-IN REGRIGETATOR BOX(APPROX.10'X12' IN REAR YARD. 2. A STEEL STORAGE BOX/CONTAINER HAS BEEN PLACED IN REAR YARD.Nothing owed — awaiting certificate of correction
ECB02/11/1993WORK DOES NOT CONFORM TO APPROVED PLANS. NOTED: ONE DOOR AND ONE WINDOW AT LEFT SIDE REAR OF BUILDING HAS BEEN SEALED UP WHICH IS CONTRARY TO APPROVED PLANS FOR ALTERATION 174-63. REMEDY: CONFORM TO APPROVEDNothing owed — awaiting certificate of correction
ECB04/30/1990WORK DOES NOT CONFORM TO APPROVED PLANS. A DOOR AT REAR OF BUILDING ON 1ST FLOOR TO REAR YARD HAS BEEN SEALED CONTRARY TO APPROVED PLANS. REMEDY: CONFORM TO APPROVED PLANS.Nothing owed — awaiting certificate of correction