← Back
BuildNYC
Over six families without stores
Highbridge Rising
1439 UNIVERSITY AVENUE · BIN 2003568
💬 Discuss this project
1915Year Built
5Stories
C1Building Class
R7-1Zoning
20,000 sfGross Floor Area
17Units
Rent Stabilized15 Active Violations 14 unresolved · 1 paperwork only ▸
Over six families without stores · 7,180 sf lot · 2.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofFacade restoration with suspended scaffoldUnder Construction3p · 4 filings · 20 docs
BulkheadFacade restoration with suspended scaffoldUnder Construction2p · 1 filing · 6 docs
Floor 5New stucco at window head1p · 2 filings · 20 docs
Floor 4Moderate renovation of existing residential building1 filing · 20 docs
Floor 3Moderate renovation of existing residential building1 filing · 20 docs
Floor 2Moderate renovation of existing residential building1 filing · 20 docs
Floor 1LTE 4C & 5C antenna and equipment construction2 filings · 20 docs
CellarModerate renovation of existing residential building1 filing · 20 docs
Site & exteriorAKI sidewalk shedUnder Construction12p · 3 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Highbridge Community Development2810/07/2026
Cingular103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Joel Phagoo P.E208/21/2026
Paul A. Castrucci, Architect204/21/2026
Florinela Muresan309/18/2025
Gace307/24/2025
Syed Engineering103/16/2022
Northeast Tower Surveying107/28/2020
Tep Engineering103/23/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM Services Group103/21/2026
William Vitacco Associates603/21/2026
MP Design and Construction203/21/2026
Construction Permit Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
All Empire Building ConScaffold607/08/2026
IronboGeneral Contractor307/08/2026
Sahara ContractingGeneral Contractor203/21/2026
Akm Construction NYScaffold210/07/2026
Techno-Volt ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Concrete Solutions Lab Co5344704/21/2026
Vibranalysis Inc., Dba VT6864111/17/2022
Tower Engineering Profess7426103/23/2018
Building Lifecycle
10/06/2026
Permit renewed — Sidewalk Shed
Renewed with changes
X01360056-I1-SH
08/21/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING EXTERIOR FACADE REPAIRS FILED UNDER APPLICATION # X01208150-S5. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01360056-P1
06/25/2026
Failure to maintain building in a code compliant manner. Observed cracked/spalled stone work on exposure 1. Also cracked/spalling stucco /brick…
DOB violation · open
06/22/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING EXTERIOR FACADE REPAIRS FILED UNDER APPLICATION # X01208150-S5. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
X01360056-I1
06/22/2026
Permit issued — Sidewalk Shed
X01360056-I1-SH
127 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedAkm Construction NY10/06/2026
DOB NOWSidewalk ShedPermit IssuedAkm Construction NY06/22/2026
DOB NOWSidewalk ShedPermit IssuedAll Empire Building Con08/22/2024
DOB NOWGeneral ConstructionPermit IssuedSahara Contracting07/23/2024
DOB NOWSuspended ScaffoldPermit IssuedSahara Contracting06/26/2024
DOB NOWSuspended ScaffoldPermit IssuedSahara Contracting05/31/2024
DOB NOWSidewalk ShedPermit IssuedAll Empire Building Con08/08/2023
DOB NOWSidewalk ShedPermit IssuedAll Empire Building Con03/23/2023
DOB NOWSidewalk ShedPermit IssuedAll Empire Building Con03/18/2022
DOB NOWAntennaSigned-offIronbo12/01/2020
DOB NOWAntennaSigned-offIronbo03/05/2019
BISMHISSUEDEdwards & Kelcey Engineering08/16/2007
BISOTISSUEDOdyssia Global Commercial03/01/2002
BISMHISSUEDOdyssia Global Commercial02/28/2002
BISBLISSUEDDanica Plumbing09/04/1991
1 project · most recent 04/21/2026
Heating Systems Ventilation Systems
FiledStatusContractorScope
04/21/2026——Heating Systems, Ventilation Systems
1 project · most recent 04/21/2026
FiledStatusContractorScope
04/21/2026———
1 project · most recent 04/21/2026
Gas Plumbing-Sprinkler Storm Water/Sanitary
FiledStatusContractorScope
04/21/2026——Gas, Plumbing-Sprinkler, Storm, Water/Sanitary
3 projects · most recent 02/26/2026
General Wiring
FiledStatusContractorScope
02/26/2026Permit IssuedHigh Quality Electric of NYC—
12/17/2025Permit IssuedTechno-Volt ElectricGeneral Wiring
03/16/2022Permit IssuedRichard Neu—
1 project · most recent 04/21/2026
Steel Concrete
FiledStatusContractorScope
04/21/2026——Steel, Concrete
1 project · most recent 08/21/2026
Sidewalk Shed
FiledStatusContractorScope
08/21/2026Permit IssuedAkm Construction NYSidewalk Shed
1 project · most recent 06/12/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
06/12/2024Permit Issued—Suspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
04/23/2026Tenant Protection Plan ComplianceMINA HANNAspecial
04/23/2026Fire-Resistant Penetrations and JointsMINA HANNAspecial
04/23/2026Fire-Resistance Rated ConstructionMINA HANNAprogress
04/23/2026Energy Code Compliance InspectionsMINA HANNAprogress
04/23/2026FinalMINA HANNAprogress
04/23/2026Lighting in dwelling unitsMINA HANNAenergy_progress
04/23/2026Fenestration areasMINA HANNAenergy_progress
04/23/2026Lighting controlsMINA HANNAenergy_progress
04/23/2026Air barrier - visual inspectionMINA HANNAenergy_progress
04/23/2026Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
04/23/2026Interior lighting powerMINA HANNAenergy_progress
04/23/2026Fenestration air leakageMINA HANNAenergy_progress
04/23/2026Exterior lighting powerMINA HANNAenergy_progress
04/20/2026Exterior lighting power—energy_progress
04/20/2026Lighting controls—energy_progress
04/20/2026Lighting in dwelling units—energy_progress
04/20/2026Interior lighting power—energy_progress
12/15/2025Tenant Protection Plan Compliance—special
12/02/2025Fire-Resistant Penetrations and JointsMINA HANNAspecial
12/02/2025Fenestration and door U-factor and product ratingsMINA HANNAenergy_progress
12/02/2025Air barrier - visual inspectionMINA HANNAenergy_progress
12/02/2025Fenestration areasMINA HANNAenergy_progress
12/02/2025Fire-Resistance Rated ConstructionMINA HANNAprogress
12/02/2025Fenestration air leakageMINA HANNAenergy_progress
12/02/2025Energy Code Compliance InspectionsMINA HANNAprogress
Latest 25 of 49.
62 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account