← Back
BuildNYC
Elevator cooperative
144-07 SANFORD AVENUE
QUEENS · BIN 4114755
💬 Discuss this project
1951Year Built
6Stories
D4Building Class
R7-1Zoning
71,036 sfGross Floor Area
84Units
LL97 CoveredRent Stabilized64 Active Violations 4 likely answered 6 old, status unconfirmed ▸FISP: No Report Filed
Elevator cooperative · Owner of record: Coral Gardens Owners · 25,750 sf lot · 2.76 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofMedallion Real EstateUnder Construction1p · 2 filings · 8 docs
Floor 6Medallion Real EstateUnder Construction1 filing · 6 docs
Floor 5Medallion Real EstateUnder Construction1 filing · 6 docs
Floor 4Medallion Real EstateUnder Construction1 filing · 6 docs
Floor 3Medallion Real EstateUnder Construction1 filing · 6 docs
Floor 2Unit 2NUnder Construction2p · 3 filings · 19 docs
Floor 1Medallion Real EstateUnder Construction6p · 2 filings · 9 docs
CellarMedallion Real Estate4p · 4 filings · 20 docs
Site & exteriorMedallion Real Estate2p · 1 filing · 8 docs
Filed — no permit issuedMedallion Real Estate2p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Coral Gardens Owners1903/22/2026
Medallion Real Estate1411/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
George J. Xerakias, PE110/02/2026
Pantec Engineering109/18/2026
McHenery Testing Lab108/03/2026
SU Architect210/27/2021
New York & Company211/05/2020
Brad E. Cohen, PE307/09/2020
K & M Associates103/07/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jack Jaffa & Associates403/21/2026
GC1 Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Splen ConstructionGeneral Contractor303/21/2026
Service Tech Mechanical & PlumbingPlumbing207/08/2026
Boulis ConstructionGeneral Contractor111/08/2026
Squan Construction ServicesGeneral Contractor107/08/2026
Reliable EnterprisesScaffold109/12/2026
Whitestone PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
George J. Xerakias, PE1658110/02/2026
Pantec Engineering8543109/18/2026
SU Architect6857210/27/2021
New York Engineers3868311/05/2020
Brad E. Cohen, PE434207/09/2020
KM Consulting NY5305103/07/2019
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
11/02/2026
Permit issued — General Construction
Q01048297-I1-GC
10/16/2026
Objection resolved — Resolved
10/13/2026
Objection raised — Other
10/02/2026
Filed — Alteration
FACADE REPAIR WORK AS PER PLAN. NO CHANGE IN USE EGRESS OR OCCUPANCY.
Q01048297-I1
300 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedBoulis Construction11/02/2026
DOB NOWSidewalk ShedPermit IssuedReliable Enterprises09/10/2026
DOB NOWPlumbingSigned-offWhitestone Plumbing11/03/2021
DOB NOWGeneral ConstructionSigned-offSplen Construction10/28/2021
DOB NOWAntennaSigned-offSquan Construction Services05/29/2020
DOB NOWBoiler EquipmentPermit IssuedService Tech Mechanical & Plumbing02/18/2020
DOB NOWPlumbingSigned-offService Tech Mechanical & Plumbing12/23/2019
DOB NOWBoiler EquipmentPermit IssuedService Tech Mechanical & Plumbing11/14/2019
DOB NOWPlumbingSigned-offService Tech Mechanical & Plumbing11/14/2019
BISOTISSUEDOdyssia Global Commercial06/03/2019
BISPLISSUEDRiser Plumbing & Heating03/16/2018
BISPLISSUEDRiser Plumbing & Heating03/16/2018
BISOTISSUEDOdyssia Global Commercial02/12/2018
BISOTISSUEDGoldstone Home Improvemen12/05/2017
BISOTISSUEDGoldstone Home Improvemen10/31/2017
BISPLISSUEDFlint Mechanical05/23/2016
BISOTISSUEDAlpha Contracting05/05/2016
BISOTISSUEDShallu Construction12/11/2008
BISOTISSUEDApelles Contracting02/15/2008
BISOTISSUEDCross State Construction Co01/06/2005
BISFBISSUEDBeta Steam & Power08/09/1991
1 project · most recent 11/05/2020
FiledStatusContractorScope
11/05/2020———
1 project · most recent 11/05/2020
Gas Water/Sanitary
FiledStatusContractorScope
11/05/2020——Gas, Water/Sanitary
3 projects · most recent 08/03/2026
General Wiring
FiledStatusContractorScope
08/03/2026Permit IssuedRichard Neu—
09/16/2024Permit IssuedEmpire Lic Electrical ContractorsGeneral Wiring
10/15/2021Permit IssuedForest Hills Electrical ContGeneral Wiring
1 project · most recent 08/03/2026
Sidewalk Shed
FiledStatusContractorScope
08/03/2026Permit IssuedReliable EnterprisesSidewalk Shed
1 project · most recent 09/18/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
09/18/2026——Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/19/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/12/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
09/16/2026Post-installed AnchorsPETER PANAGOPOULOSspecial
05/08/2024Tenant Protection Plan ComplianceGeorge Xerakiasspecial
05/08/2024MasonryGeorge Xerakiasspecial
05/08/2024Structural Stability – Alterations of existing buildingsGeorge Xerakiasspecial
05/08/2024FinalGeorge Xerakiasprogress
09/28/2021Energy Code Compliance InspectionsQIANG SUprogress
09/28/2021HVAC-R and service water piping design and insulationQIANG SUenergy_progress
09/28/2021Fire-Resistant Penetrations and JointsQIANG SUspecial
11/05/2020HVAC insulation and sealing Michael Tobiasenergy_progress
09/21/2020FinalMichael Tobiasprogress
09/21/2020Fire-Resistant Penetrations and JointsMichael Tobiasspecial
09/21/2020Post-installed AnchorsMichael Tobiasspecial
09/21/2020Fire-Resistance Rated ConstructionMichael Tobiasprogress
09/21/2020Mechanical SystemsMichael Tobiasspecial
09/11/2020Sprinkler SystemsMichael Tobiasspecial
07/16/2020Fire-Resistant Penetrations and JointsBrad Cohenspecial
07/07/2020Fire-Resistant Penetrations and JointsBrad Cohenspecial
169 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account