← Back
Two family frame
144-10 NEGUNDO AVENUE
QUEENS · East Flushing · BIN 4118064
💬 Discuss this project
1955Year Built
2Stories
B2Building Class
R3AZoning
2,250 sfGross Floor Area
2Units
Two family frame · 2,500 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Cellar2p · 2 filings · 13 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MEHDI GHAZI, P.E., P.C.205/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IBUILD CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TT&T CONSTRUCTION INCGeneral Contractor203/21/2026
UNITED ELEC'L CONT'G CORPElectrical103/22/2026
WASOFF PLBG & UTILITY COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MEHDI GHAZI, P.E. P.C.7129205/14/2021
Building Lifecycle
All (20)Filed (2)Permit Issued (2)Signed Off (2)Inspection (6)Special Inspection (8)
01/20/2022
Signed off — Alteration
INTERIOR RENOVATION AT CELLAR FLOOR IN EXISTING TWO-FAMILY RESIDENCE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00519021-I1
01/19/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
10/18/2021
Signed off — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00517875-I1
09/20/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/20/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/20/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/28/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/28/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/18/2021
Permit issued — Plumbing
Q00517875-I1-PL
05/18/2021
Permit issued — Mechanical Systems
Q00519021-I1-GC-CX
05/14/2021
Filed — Alteration
INTERIOR RENOVATION AT CELLAR FLOOR IN EXISTING TWO-FAMILY RESIDENCE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00519021-I1
05/14/2021
Filed — Alteration
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q00517875-I1
05/12/2021
Special inspection requirement — Energy Code Compliance Inspections
MEHDI GHAZI
05/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
MEHDI GHAZI
05/10/2021
Special inspection requirement — Heating Systems
MEHDI GHAZI
05/10/2021
Special inspection requirement — Final
MEHDI GHAZI
05/10/2021
Special inspection requirement — HVAC-R and service water heating equipment
MEHDI GHAZI
05/10/2021
Special inspection requirement — HVAC-R and service water heating system controls
MEHDI GHAZI
05/10/2021
Special inspection requirement — Mechanical Systems
MEHDI GHAZI
05/10/2021
Special inspection requirement — Ventilation and air distribution system
MEHDI GHAZI
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO05/18/2021
DOB NOWMechanical SystemsSigned-offTT&T CONSTRUCTION INC05/18/2021
1 project · most recent 07/18/2019
FiledStatusContractorScope
07/18/2019Permit IssuedUNITED ELEC'L CONT'G CORP3 meters, 3 new_meters
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/19/2022Pass-Final General Construction Non-Directive 14PassView ↗
09/20/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/20/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/20/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/28/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/28/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
05/12/2021Energy Code Compliance InspectionsMEHDI GHAZIprogress
05/10/2021Fire-Resistant Penetrations and JointsMEHDI GHAZIspecial
05/10/2021Heating SystemsMEHDI GHAZIspecial
05/10/2021FinalMEHDI GHAZIprogress
05/10/2021HVAC-R and service water heating equipmentMEHDI GHAZIenergy_progress
05/10/2021HVAC-R and service water heating system controlsMEHDI GHAZIenergy_progress
05/10/2021Mechanical SystemsMEHDI GHAZIspecial
05/10/2021Ventilation and air distribution systemMEHDI GHAZIenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026Q00519021-I1Request digital key ↗
08/27/2026Q00517875-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWRestrictive Declaration/Easement 12
08/13/2026Q00517875-I1Open ↗
08/13/2026Q00519021-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026Q00519021-I1Open ↗
08/27/2026Q00517875-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026Q00519021-I1Open ↗
08/26/2026Q00519021-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026Q00519021-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026Q00519021-I1Open ↗
08/27/2026Q00517875-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00517875-I1Open ↗
08/13/2026Q00519021-I1Open ↗