Two family frame
144-11 167 STREET
QUEENS · BIN 4284965
💬 Discuss this project
1940Year Built
2Stories
B2Building Class
R3-2Zoning
2,394 sfGross Floor Area
2Units
Two family frame · 4,000 sf lot · 0.6 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Roof1p · 1 filing · 20 docs
Floor 24p · 2 filings · 20 docs
Floor 14p · 2 filings · 20 docs
Cellar6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SHC EQUITIES907/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/29/2023$1.2M—985 GREEN AVE LLC → Private party$522/sf building
05/06/2019$475K—— → —$198/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CHRIS KIM ENGINEERING PC107/31/2025
BAZINI ENGINEERING, P.C.305/28/2025
J.K.DESIGN509/27/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YAFE MEOD CORPGeneral Contractor603/21/2026
HI-TECH HEATING CORPGeneral Contractor203/21/2026
GALLANT ELEC'L CONST, INCElectrical103/22/2026
SUNATION SOLAR SYSTEMSGeneral Contractor104/09/2026
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BARUN CORP8842107/31/2025
BAZINI ENGINEERING, P.C.1808305/28/2025
ASKON ARCHITECT, P.C.3596409/27/2023
Building Lifecycle
All (65)Filed (9)Permit Issued (6)Signed Off (5)Inspection (13)Objection (2)Special Inspection (30)
04/03/2026
Signed off — Alteration
installation of new gas fired equipment ,and plumbing fixtures for the renovation of the existing two family dwellings. Filed in conjunction with ALT I app#Q00751541-I1
Q00883210-I1
12/30/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01263821-I1
09/19/2025
Permit issued — Solar
Q01263821-I1-SL
07/31/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Q01263821-I1
07/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
CHRIS KIM
07/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
CHRIS KIM
07/30/2025
Special inspection requirement — Energy Code Compliance Inspections
CHRIS KIM
07/30/2025
Special inspection requirement — Air barrier - visual inspection
CHRIS KIM
07/30/2025
Special inspection requirement — Final
CHRIS KIM
07/08/2025
Signed off — Alteration
INSTALL NEW EXHAUST VENTS AND AIR INTAKE VENTS FOR TWO (2) NEW GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01210155-I1
07/07/2025
Signed off — Alteration
INSTALL NEW EXHAUST VENTS AND AIR INTAKE VENTS FOR TWO (2) NEW GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01210155-S1
06/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
05/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Bazini
05/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
Joseph Bazini
05/28/2025
Filed — Alteration
INSTALL NEW EXHAUST VENTS AND AIR INTAKE VENTS FOR TWO (2) NEW GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01210155-P1
05/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
Joseph Bazini
05/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
05/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Joseph Bazini
05/27/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/13/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
05/06/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/17/2025
Permit issued — Mechanical Systems
Q01210155-S1-MS
04/17/2025
Permit issued — Plumbing
Q01210155-I1-PL
04/15/2025
Filed — Alteration
INSTALL NEW EXHAUST VENTS AND AIR INTAKE VENTS FOR TWO (2) NEW GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01210155-I1
04/15/2025
Filed — Alteration
INSTALL NEW EXHAUST VENTS AND AIR INTAKE VENTS FOR TWO (2) NEW GAS-FIRED BOILERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01210155-S1
10/09/2023
Signed off — Alteration
Q00852808-I1
10/06/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/03/2023
Special inspection requirement — Interior lighting power
Akeeb Shekoni
10/03/2023
Special inspection requirement — Fenestration areas
Akeeb Shekoni
10/03/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Akeeb Shekoni
10/03/2023
Special inspection requirement — Fenestration air leakage
Akeeb Shekoni
10/03/2023
Special inspection requirement — HVAC-R and service water heating equipment
Akeeb Shekoni
10/03/2023
Special inspection requirement — Final
HANSA PERSAUD
10/03/2023
Special inspection requirement — Mechanical Systems
Akeeb Shekoni
10/03/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
10/03/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Akeeb Shekoni
10/03/2023
Special inspection requirement — Footing and Foundation
Akeeb Shekoni
10/03/2023
Special inspection requirement — Fire-Resistance Rated Construction
Akeeb Shekoni
10/03/2023
Special inspection requirement — Energy Code Compliance Inspections
Akeeb Shekoni
10/03/2023
Special inspection requirement — Structural Wood Frame
Akeeb Shekoni
10/03/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Akeeb Shekoni
10/03/2023
Special inspection requirement — Air barrier - visual inspection
Akeeb Shekoni
10/03/2023
Special inspection requirement — HVAC-R and service water heating system controls
Akeeb Shekoni
10/02/2023
Objection resolved — Addressed
09/30/2023
Objection raised — Scope
09/27/2023
Filed — Alteration CO
Existing two family dwelling to be horizontally enlarged, and fully renovated . New drywall partitions ,and plumbing fixtures as per plans.
Q00751541-P1
09/27/2023
Special inspection requirement — Energy Code Compliance Inspections
Akeeb Shekoni
09/27/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Akeeb Shekoni
09/26/2023
Filed — Alteration
installation of new gas fired equipment ,and plumbing fixtures for the renovation of the existing two family dwellings. Filed in conjunction with ALT I app#Q00751541-I1
Q00883210-P1
09/25/2023
Special inspection requirement — Energy Code Compliance Inspections
Akeeb Shekoni
09/21/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
09/21/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/19/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/19/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/19/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
07/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/12/2023
Permit issued — Plumbing
Q00883210-I1-PL
Latest 60 of 65 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNATION SOLAR SYSTEMS09/19/2025
DOB NOWMechanical SystemsSigned-offHI-TECH HEATING CORP04/17/2025
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG04/17/2025
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR07/12/2023
DOB NOWGeneral ConstructionPermit IssuedYAFE MEOD CORP04/19/2023
DOB NOWConstruction FenceSigned-offYAFE MEOD CORP04/10/2023
1 project · most recent 09/27/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/27/2023Permit IssuedYAFE MEOD CORPHeating and Air Conditioning Systems
Heat / Cool
Comfort Aire RSG1330S1M-1 36,000 BTU · Heat Pump Outdoor ×2
Fujitsu AOU36RLXFZI 36,000 BTU · Condensing Unit ×2
3 projects · most recent 07/25/2025
General Wiring Lighting
FiledStatusContractorScope
07/25/2025CompleteGALLANT ELEC'L CONST, INC—
12/22/2023CancelledISLAND ELECTRIC CORP—
08/10/2023CompleteBDS ELECTRIC CORP.General Wiring, Lighting
1 project · most recent 09/27/2023
Concrete Wood
FiledStatusContractorScope
09/27/2023Permit IssuedYAFE MEOD CORPConcrete, Wood
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
06/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/13/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/06/2023Pass-Final CND-Occupancy InspectionPassView ↗
09/21/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
09/21/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/28/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/19/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/19/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/19/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
07/30/2025Fire-Resistant Penetrations and JointsCHRIS KIMspecial
07/30/2025Structural Stability – Alterations of existing buildingsCHRIS KIMspecial
07/30/2025Energy Code Compliance InspectionsCHRIS KIMprogress
07/30/2025Air barrier - visual inspectionCHRIS KIMenergy_progress
07/30/2025FinalCHRIS KIMprogress
05/29/2025HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
05/29/2025Fire-Resistant Penetrations and JointsJoseph Bazinispecial
05/29/2025Tenant Protection Plan ComplianceJoseph Bazinispecial
05/28/2025HVAC-R and service water heating equipmentJoseph Bazinienergy_progress
05/28/2025Tenant Protection Plan Compliance—special
05/28/2025Fire-Resistant Penetrations and JointsJoseph Bazinispecial
10/03/2023Interior lighting powerAkeeb Shekonienergy_progress
10/03/2023Fenestration areasAkeeb Shekonienergy_progress
10/03/2023Fenestration and door U-factor and product ratingsAkeeb Shekonienergy_progress
10/03/2023Fenestration air leakageAkeeb Shekonienergy_progress
10/03/2023HVAC-R and service water heating equipmentAkeeb Shekonienergy_progress
10/03/2023FinalHANSA PERSAUDprogress
10/03/2023Mechanical SystemsAkeeb Shekonispecial
10/03/2023Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
10/03/2023Structural Stability – Alterations of existing buildingsAkeeb Shekonispecial
10/03/2023Footing and FoundationAkeeb Shekoniprogress
10/03/2023Fire-Resistance Rated ConstructionAkeeb Shekoniprogress
10/03/2023Energy Code Compliance InspectionsAkeeb Shekoniprogress
10/03/2023Structural Wood FrameAkeeb Shekoniprogress
10/03/2023HVAC-R and service water piping design and insulationAkeeb Shekonienergy_progress
Latest 25 of 47.
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/25/2026Q00852808-I1Request digital key ↗
08/24/2026Q00883210-I1Request digital key ↗
08/24/2026Q00883210-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram3
08/24/2026Q00751541-P2Open ↗
08/13/2026Q00751541-P1Open ↗
08/13/2026Q00751541-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00751541-I1Open ↗
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature13
08/29/2026Q01210155-I1Open ↗
08/28/2026Q00751541-I1Open ↗
08/28/2026Q00751541-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
08/29/2026Q01210155-I1Open ↗
08/29/2026Q01210155-I1Open ↗
08/28/2026Q00751541-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/25/2026Q00852808-I1Open ↗
08/24/2026Q00883210-I1Open ↗
08/24/2026Q00751541-P2Open ↗
Showing 3 of 10 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/24/2026Q00751541-P2Open ↗
08/13/2026Q00751541-I1Open ↗
08/13/2026Q00751541-P1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00751541-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00751541-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00751541-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/24/2026Q00883210-I1Open ↗
08/24/2026Q00751541-P2Open ↗
08/24/2026Q00751541-I1Open ↗
Showing 3 of 9 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/24/2026Q00751541-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/24/2026Q00751541-P2Open ↗
08/13/2026Q00751541-I1Open ↗
08/13/2026Q00751541-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00751541-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00751541-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01263821-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/24/2026Q00751541-P2Open ↗
08/13/2026Q00751541-I1Open ↗
08/13/2026Q00751541-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/24/2026Q00751541-P2Open ↗
08/13/2026Q00751541-P1Open ↗
08/13/2026Q00751541-I1Open ↗
▸DOB NOWPlot Diagram3
08/24/2026Q00751541-P2Open ↗
08/13/2026Q00751541-I1Open ↗
08/13/2026Q00751541-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/24/2026Q00751541-P2Open ↗
08/24/2026Q00751541-I1Open ↗
08/14/2026Q00751541-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00751541-I1Open ↗