← Back
Two stories - detached, small or mid-size
144-12 106 AVENUE
QUEENS · Jamaica · BIN 4214824
💬 Discuss this project
1910Year Built
2.75Stories
A1Building Class
R4-1Zoning
1,626 sfGross Floor Area
1Units
6 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 2,500 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Attic3p · 1 filing · 11 docs
Floor 26p · 1 filing · 11 docs
Floor 16p · 1 filing · 11 docs
Cellar6p · 1 filing · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
URENA CONSTRUCTION & DESIGN807/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SOTIR ASSOCIATES212/07/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
URENA CONST & DESIGN INCGeneral Contractor303/21/2026
INFINITI ESC PLUMBING CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOTIR ASSOCIATES7473112/07/2023
ENGINEERING CONSULTING SE2050110/26/2023
Building Lifecycle
All (45)Filed (2)Permit Issued (2)Signed Off (2)Violation (10)Inspection (6)Objection (16)Special Inspection (7)
02/14/2025
Violation issued (ECB, open)
Construction
10/08/2024
Signed off — Alteration
PROPOSED INTERIOR RENOVATIONS OF EXISTING ONE FAMILY HOUSE TO REPAIR FIRE DAMAGE. PLUMBING FIXTURE REPLACEMENT FILED SEPARATELY.
Q00954089-S2
08/23/2024
Signed off — Alteration
PROPOSED INTERIOR RENOVATIONS OF EXISTING ONE FAMILY HOUSE TO REPAIR FIRE DAMAGE. PLUMBING FIXTURE REPLACEMENT FILED SEPARATELY.
Q00954089-I1
08/01/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/17/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/27/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/27/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/25/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/05/2024
Permit issued — Plumbing
Q00954089-S2-PL
01/24/2024
Permit issued — General Construction
Q00954089-I1-GC
01/22/2024
Violation issued (ECB, closed)
Quality of Life
01/10/2024
Objection resolved — Addressed
12/29/2023
Objection raised — Scope
12/20/2023
Objection resolved — Addressed
12/20/2023
Objection resolved — Addressed
12/15/2023
Objection raised — Mechanical
12/15/2023
Objection raised — Other
12/15/2023
Objection resolved — Addressed
12/15/2023
Objection raised — Inspections
12/07/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATIONS OF EXISTING ONE FAMILY HOUSE TO REPAIR FIRE DAMAGE. PLUMBING FIXTURE REPLACEMENT FILED SEPARATELY.
Q00954089-S2
11/27/2023
Objection resolved — Addressed
11/27/2023
Objection resolved — Addressed
11/24/2023
Objection raised — Fire_Protection
11/20/2023
Objection resolved — Addressed
11/20/2023
Objection resolved — Addressed
11/02/2023
Objection raised — Other
11/02/2023
Objection raised — Scope
11/02/2023
Objection raised — Scope
10/26/2023
Filed — Alteration
PROPOSED INTERIOR RENOVATIONS OF EXISTING ONE FAMILY HOUSE TO REPAIR FIRE DAMAGE. PLUMBING FIXTURE REPLACEMENT FILED SEPARATELY.
Q00954089-I1
10/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
10/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
10/26/2023
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
10/26/2023
Special inspection requirement — Fenestration areas
PAUL MARINO
10/26/2023
Special inspection requirement — Fenestration air leakage
PAUL MARINO
10/26/2023
Special inspection requirement — Lighting in dwelling units
PAUL MARINO
10/26/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
PAUL MARINO
08/29/2023
Violation issued (ECB, closed)
Quality of Life
08/29/2023
Violation issued (ECB, closed)
Quality of Life
08/29/2023
Violation issued (ECB, closed)
Construction
08/29/2023
Violation issued (ECB, open)
Quality of Life
07/15/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/15/2023
Violation issued (ECB, open)
Quality of Life
05/15/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offINFINITI ESC PLUMBING COR02/05/2024
DOB NOWGeneral ConstructionSigned-offURENA CONST & DESIGN INC01/24/2024
1 project · most recent 07/12/2024
General Wiring
FiledStatusContractorScope
07/12/2024CompleteDD&G ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/01/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/17/2024Pass-Final General Construction Non-Directive 14PassView ↗
03/27/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/27/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/27/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/25/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
10/26/2023Fire-Resistant Penetrations and JointsPAUL MARINOspecial
10/26/2023Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
10/26/2023Energy Code Compliance InspectionsPAUL MARINOprogress
10/26/2023Fenestration areasPAUL MARINOenergy_progress
10/26/2023Fenestration air leakagePAUL MARINOenergy_progress
10/26/2023Lighting in dwelling unitsPAUL MARINOenergy_progress
10/26/2023Fenestration and door U-factor and product ratingsPAUL MARINOenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/23/2026Q00954089-S2Request digital key ↗
08/23/2026Q00954089-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/23/2026Q00954089-S2Open ↗
08/23/2026Q00954089-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026Q00954089-I1Open ↗
09/01/2026Q00954089-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026Q00954089-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/23/2026Q00954089-I1Open ↗
08/23/2026Q00954089-S2Open ↗