← Back
Office with commercial, 1-6 stories
144 2 AVENUE
MANHATTAN · BIN 1006363
💬 Discuss this project
1920Year Built
3Stories
O5Building Class
R7AZoning
10,062 sfGross Floor Area
4Units
3 Open Violations ▸
Office with commercial, 1-6 stories · Owner of record: PLAST FOUNDATION INC · 3,354 sf lot · 3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof11p · 4 filings · 19 docs
Floor 318p · 4 filings · 20 docs
Floor 220p · 5 filings · 20 docs
Floor 19p · 2 filings · 20 docs
Mezzanine3p · 2 filings · 11 docs
Cellar6p · 4 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SKR DESIGN GROUP1807/08/2026
VISELKA103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BODNAR ARCHITECTURE P C2003/21/2026
BRIDGE EXPEDITING1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DREAM CITY CONSTRUCTIONGeneral Contractor807/08/2026
A.M.N. CORPORATIONPlumbing207/08/2026
AJC SPRINKLER CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EMTG CONSULTANTS4222311/15/2022
TAN ENGINEERING, P.C.1291203/23/2022
MIRELLA BOSELLI R.A.6330101/31/2022
DESIMONE CONSULTING ENGIN5942108/09/2021
Building Lifecycle
All (114)Filed (18)Permit Issued (7)Violation (9)Inspection (9)Objection (50)Special Inspection (21)
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2023
Inspection — Pass-Final PL Permit Withdrawal
Pass
View inspection ↗
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/17/2023
Inspection — Fail-Final PL Permit Withdrawal
Fail
View inspection ↗
01/30/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/16/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/12/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/07/2022
Filed — Alteration
Installation of new pantry sink and hot water heater on for same on 3rd floor with drainage piping on the 2nd floor and new gas extension to roof level for new rooftop gas units. No change in occupancy use or egress.
M00529190-P5
12/01/2022
Filed — Alteration
Installation of new pantry sink and hot water heater on for same on 3rd floor with drainage piping on the 2nd floor and new gas extension to roof level for new rooftop gas units. No change in occupancy use or egress.
M00529190-P4
11/25/2022
Special inspection requirement — Sprinkler Systems
Shahram Lotfi
11/15/2022
Filed — Alteration
Removal of existing sprinkler head and branch lines and installation of new on second and third floors of the existing building. No change in occupancy use or egress.
M00522731-P1
11/15/2022
Filed — Alteration
Installation of new pantry sink and hot water heater on for same on 3rd floor with drainage piping on the 2nd floor and new gas extension to roof level for new rooftop gas units. No change in occupancy use or egress.
M00529190-P3
11/08/2022
Special inspection requirement — Sprinkler Systems
Shahram Lotfi
10/19/2022
Special inspection requirement — Fire-Resistance Rated Construction
Theodore Bodnar
10/19/2022
Special inspection requirement — Final
Theodore Bodnar
10/18/2022
Filed — Alteration
removal & relocation of interior walls & adjustments to flrs & clgs in existing youth club rooms & off, lounges, libr, & CONF. RM on the 2nd & 3rd floors w/ removal of exist dismantled Elv bulk headwalls at roof. No change in occupancy use or egress.
M00515861-P1
10/14/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/12/2022
Special inspection requirement — Fire-Resistance Rated Construction
Theodore Bodnar
10/12/2022
Special inspection requirement — Final
Theodore Bodnar
10/06/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/24/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/14/2022
Filed — Alteration
Installation of new pantry sink and hot water heater on for same on 3rd floor with drainage piping on the 2nd floor and new gas extension to roof level for new rooftop gas units. No change in occupancy use or egress.
M00529190-P2
07/08/2022
Permit issued — Plumbing
M00529190-I1-PL
07/07/2022
Permit issued — General Construction
M00515861-I1-GC
03/23/2022
Filed — Alteration
application filed for structural, foundation, and construction work as per plans.
M00649791-I1
03/23/2022
Filed — Alteration
MECHANICAL WORK AS PER PLANS
M00649793-I1
03/23/2022
Filed — Alteration
PLUMBING AND SRPINKLER WORK AS PER PLAN
M00649792-I1
03/23/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/07/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Roger Tan
02/22/2022
Special inspection requirement — Structural Steel - Details
02/21/2022
Special inspection requirement — Structural Cold-Formed Steel
02/18/2022
Special inspection requirement — Subgrade Inspections
02/18/2022
Special inspection requirement — Concrete - Cast-In-Place
02/11/2022
Objection raised — Fire_Protection
02/11/2022
Objection resolved — Addressed
02/11/2022
Objection raised — Fire_Protection
02/11/2022
Objection resolved — Addressed
02/11/2022
Objection raised — Structural
02/11/2022
Objection resolved — Addressed
02/11/2022
Objection raised — Fire_Protection
02/11/2022
Objection resolved — Addressed
02/11/2022
Objection raised — Fire_Protection
02/11/2022
Objection resolved — Addressed
02/11/2022
Objection raised — Accessibility
02/11/2022
Objection raised — Accessibility
02/11/2022
Objection resolved — Addressed
02/11/2022
Objection raised — Structural
02/11/2022
Objection resolved — Addressed
02/11/2022
Objection raised — Zoning
02/11/2022
Objection raised — Mechanical
02/11/2022
Objection resolved — Addressed
02/11/2022
Objection raised — Mechanical
02/11/2022
Objection resolved — Addressed
02/11/2022
Objection raised — Structural
02/11/2022
Objection resolved — Addressed
02/11/2022
Objection raised — Fire_Protection
02/11/2022
Objection resolved — Addressed
02/11/2022
Objection raised — Fire_Protection
Latest 60 of 114 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offA.M.N. CORPORATION07/08/2022
DOB NOWGeneral ConstructionPermit IssuedDREAM CITY CONSTRUCTION07/07/2022
DOB NOWMechanical SystemsPermit IssuedDREAM CITY CONSTRUCTION10/13/2021
DOB NOWStructuralPermit IssuedDREAM CITY CONSTRUCTION10/12/2021
DOB NOWSprinklersSigned-offAJC SPRINKLER CORP09/25/2021
DOB NOWPlumbingSigned-offA.M.N. CORPORATION09/22/2021
DOB NOWGeneral ConstructionPermit IssuedDREAM CITY CONSTRUCTION07/28/2021
BISPLISSUEDMCMANUS MECH MAINT P&H INC09/14/2016
BISOTISSUEDE.J. YORK INC08/20/2015
BISOTISSUEDE.J. YORK INC07/14/2015
BISEQISSUEDROCK GROUP NY CORP05/05/2015
BISFPISSUEDSENTINEL FIRE SAFETY CORP08/21/2014
BISPLISSUEDGIL V. PEREZ PLUMBING03/17/2011
BISBLISSUEDASHLAND PLUMBING CORP04/13/2009
BISPLISSUEDA.M.N. CORPORATION08/13/2008
BISBLISSUEDASHLAND PLUMBING CORP02/16/2006
BISEQISSUEDM.S.S. CONSTRUCTION CORP09/28/2005
BISPLISSUEDROM PIPING & HTG INC08/11/2005
BISOTISSUEDCRACOVIA GENERAL CONTRACT07/15/2005
BIS—ISSUEDMARIO ARBORE ARCH.02/11/2005
BISOTISSUEDNEW YORK HEATING CORP.11/06/1996
BISPLISSUEDWASOFF PLBG & UTILITY CO11/01/1996
BISFPISSUEDSENTINEL FIRE CONTROL, INC.10/23/1996
BISPLISSUEDASHLAND PLUMBING & HEATING CORP09/24/1996
BISEQISSUEDABR CONSTRUCTION ,INC.08/13/1996
BISOTISSUEDABR CONSTRUCTION ,INC.08/13/1996
BISOTISSUEDABR CONSTRUCTION ,INC.03/27/1996
BISEQISSUEDABR CONSTRUCTION ,INC.03/27/1996
BISPLISSUEDGROOM PLMB & HEATING CORP02/03/1994
BISFPISSUEDSENTINEL FIRE CONTROL INC.09/01/1992
BISMHISSUEDUNIVERSAL BUILDING CONTRACTORS04/16/1991
1 project · most recent 03/23/2022
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
03/23/2022——Air Conditioning Systems, Heating Systems
Cooling
Trane ×10
Heating
Trane ×10
2 projects · most recent 11/15/2022
FiledStatusContractorScope
11/15/2022Signed-offAJC SPRINKLER CORP—
03/23/2022———
1 project · most recent 03/23/2022
Gas Water/Sanitary
FiledStatusContractorScope
03/23/2022——Gas, Water/Sanitary
1 project · most recent 11/08/2021
General Wiring
FiledStatusContractorScope
11/08/2021CompleteENTERPRISE ELEC'L SYSTEMSGeneral Wiring
1 project · most recent 03/23/2022
Steel Concrete
FiledStatusContractorScope
03/23/2022——Steel, Concrete
1 project · most recent 01/31/2022
Fence
FiledStatusContractorScope
01/31/2022——Fence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
05/02/2023Pass-Final PL Permit WithdrawalPassView ↗
03/17/2023Fail-Final PL Permit WithdrawalFailView ↗
01/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/16/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/12/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/14/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/06/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
11/25/2022Sprinkler SystemsShahram Lotfispecial
11/08/2022Sprinkler SystemsShahram Lotfispecial
10/19/2022Fire-Resistance Rated ConstructionTheodore Bodnarprogress
10/19/2022FinalTheodore Bodnarprogress
10/12/2022Fire-Resistance Rated ConstructionTheodore Bodnarprogress
10/12/2022FinalTheodore Bodnarprogress
03/23/2022Structural Stability – Alterations of existing buildings—special
03/07/2022Fire-Resistant Penetrations and JointsRoger Tanspecial
02/22/2022Structural Steel - Details—special
02/21/2022Structural Cold-Formed Steel—special
02/18/2022Subgrade Inspections—special
02/18/2022Concrete - Cast-In-Place—special
12/22/2021Fire-Resistance Rated Construction—progress
12/22/2021Final—progress
12/22/2021Exterior lighting power—energy_progress
12/22/2021Interior lighting power—energy_progress
12/22/2021Lighting controls—energy_progress
12/22/2021Fire-Resistant Penetrations and Joints—special
12/17/2021FinalALEXIS SPYROUprogress
12/17/2021Footing and Foundation—progress
12/17/2021Sprinkler SystemsRoger Tanspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
VeselkaRestaurant / Food ServiceCellar, Ground, Floors 1–3, Mezzanine, Roof
Project M00649792 Alteration · Approved · 03/23/2022
Project M00649793 Alteration · Approved · 03/23/2022
Project M00649794 Alteration · Objections · 01/31/2022
VeselkaRestaurant / Food ServiceGround
Project M00660425 Alteration · Approved · 01/31/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 160 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
09/03/2026M00522717-I1Request digital key ↗
09/03/2026M00524862-I1Request digital key ↗
09/03/2026M00529190-P2Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION8
09/26/2016122708301Open ↗
09/09/2015122168493Open ↗
07/22/2015122168493Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION7
04/05/2016122708301Open ↗
06/18/2015122168493Open ↗
05/03/2015140340076Open ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications44
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/03/2026M00522717-I1Open ↗
09/03/2026M00524862-I1Open ↗
09/03/2026M00529190-P2Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION11
04/05/2016122708301Open ↗
04/01/2016140340076Open ↗
03/17/2016122168493Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/31/2026M00522731-I1Open ↗
08/31/2026M00649792-I1Open ↗
08/27/2026M00522731-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/27/2026M00515861-I1Open ↗
08/27/2026M00515861-I1Open ↗
08/24/2026M00649791-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/03/2015140340076Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/03/2015140340076Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/03/2015140340076Open ↗
▸Trade Schedules & Equipment5
▸BISFA - FDNY APPROVAL : FD-FAA2
01/13/2015122089578Open ↗
12/16/2013120730959Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
09/25/2008110222063Open ↗
▸BISSCHEDULE B - PLUMBING1
06/26/2008110222063Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/05/2016122708301Open ↗
▸Environmental & Asbestos36
▸DOB NOWOER: Notice to Proceed16
09/02/2026M00649792-I1Open ↗
09/02/2026M00649793-I1Open ↗
08/15/2026M00649794-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/03/2026M00522717-I1Open ↗
09/03/2026M00524862-I1Open ↗
09/03/2026M00529190-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/02/2026M00649792-I1Open ↗
09/02/2026M00649793-I1Open ↗
08/15/2026M00649794-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWOER: Notice of Satisfaction4
09/02/2026M00649792-I1Open ↗
09/02/2026M00649793-I1Open ↗
08/15/2026M00649794-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
07/01/2016122708301Open ↗
06/18/2015122168493Open ↗
08/07/2014122089578Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED2
05/11/2016122708301Open ↗
05/03/2015140340076Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
06/24/2011120730959Open ↗
06/26/2008110222063Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
04/05/2016122708301Open ↗
04/01/2016122168493Open ↗
04/01/2016122168493Open ↗
Showing 3 of 5 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
10/28/2016122708301Open ↗
04/01/2016122168493Open ↗
03/17/2016122168493Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/03/2015140340076Open ↗
▸Approvals, Objections & Sign-offs13
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST9
10/28/2016122708301Open ↗
04/01/2016122168493Open ↗
04/01/2016140340076Open ↗
Showing 3 of 9 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
06/24/2011120730959Open ↗
06/26/2008110222063Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
10/28/2016122708301Open ↗
10/29/2009110222063Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT11
04/05/2016122708301Open ↗
04/01/2016122168493Open ↗
03/17/2016122168493Open ↗
Showing 3 of 11 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET4
04/05/2016122708301Open ↗
06/18/2015122168493Open ↗
08/07/2014122089578Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
04/01/2016140340076Open ↗
05/03/2015140340076Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/03/2015140340076Open ↗
▸Other Documents2
▸BISSEPTIC - SUPPORTING DOCUMENTATION1
05/03/2015140340076Open ↗
▸BISSupporting Document: Fee Deferment1
04/01/2016122168493Open ↗