← Back
BuildNYC
Two stories - detached, small or mid-size
144-21 COOLIDGE AVENUE
QUEENS · BIN 4144820
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R1-2Zoning
1,780 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,000 sf lot · 0.3 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic1 filing · 20 docs
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/30/2017$900K—— → —$506/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Gerald Caliendo Architects309/25/2026
Just Consulting Engineering309/23/2026
Building Lifecycle
All (37)Filed (6)Objection (1)Special Inspection (30)
10/05/2026
Objection raised — Other
09/25/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILING FOUNDATION WORK IN CONJUNCTION WITH JOB#Q01338258I1
Q01338258-S5
09/25/2026
Special inspection requirement — Permanent certificate
09/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
09/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
09/25/2026
Special inspection requirement — Maintenance information
09/25/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
09/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/25/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
09/25/2026
Special inspection requirement — Energy Code Compliance Inspections
09/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
09/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILING FOUNDATION WORK IN CONJUNCTION WITH JOB#Q01338258I1
Q01338258-S3
09/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILING FOUNDATION WORK IN CONJUNCTION WITH JOB#Q01338258I1
Q01338258-S4
09/23/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILING FOUNDATION WORK IN CONJUNCTION WITH JOB#Q01338258I1
Q01338258-S2
09/11/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
09/11/2026
Special inspection requirement — Structural Steel - Details
09/11/2026
Special inspection requirement — Subgrade Inspections
09/11/2026
Special inspection requirement — Concrete - Cast-In-Place
09/11/2026
Special inspection requirement — Subgrade Inspections
09/11/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
09/11/2026
Special inspection requirement — Final
09/11/2026
Special inspection requirement — Footing and Foundation
09/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/11/2026
Special inspection requirement — Concrete - Cast-In-Place
09/11/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
09/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
09/11/2026
Special inspection requirement — Structural Steel - Details
09/11/2026
Special inspection requirement — Structural Steel - High Strength Bolting
09/11/2026
Special inspection requirement — Structural Steel - Welding
09/11/2026
Special inspection requirement — Final
09/11/2026
Special inspection requirement — Concrete - Cast-In-Place
05/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILING FOUNDATION WORK IN CONJUNCTION WITH JOB#Q01338258I1
Q01338258-S1
05/11/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
FILING FOUNDATION WORK IN CONJUNCTION WITH JOB#Q01338258I1
Q01338258-I1
12/20/2025
Special inspection requirement — Electric vehicle service equipment requirements
12/20/2025
Special inspection requirement — Interior lighting power
12/20/2025
Special inspection requirement — HVAC-R and service water heating equipment
12/20/2025
Special inspection requirement — Fenestration air leakage
Nothing on file for this building.
1 project · most recent 09/25/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/25/2026——Gas, Storm, Water/Sanitary
1 project · most recent 09/25/2026
Steel Concrete
FiledStatusContractorScope
09/25/2026——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
09/25/2026Permanent certificate—energy_progress
09/25/2026HVAC-R and service water heating system controls—energy_progress
09/25/2026HVAC-R and service water piping design and insulation—energy_progress
09/25/2026Maintenance information—energy_progress
09/25/2026Subsurface Investigations (Borings/Test Pits)—special
09/25/2026Fire-Resistant Penetrations and Joints—special
09/25/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities—special
09/25/2026Energy Code Compliance Inspections—progress
09/25/2026HVAC-R and service water heating equipment—energy_progress
09/11/2026Excavations - Sheeting, Shoring, and Bracing—special
09/11/2026Structural Steel - Details—special
09/11/2026Subgrade Inspections—special
09/11/2026Concrete - Cast-In-Place—special
09/11/2026Subgrade Inspections—special
09/11/2026Subsurface Investigations (Borings/Test Pits)—special
09/11/2026Final—progress
09/11/2026Footing and Foundation—progress
09/11/2026Structural Stability – Alterations of existing buildings—special
09/11/2026Concrete - Cast-In-Place—special
09/11/2026Mastic and Intumescent Fire-resistant Coatings—special
09/11/2026Structural Stability – Alterations of existing buildings—special
09/11/2026Structural Steel - Details—special
09/11/2026Structural Steel - High Strength Bolting—special
09/11/2026Structural Steel - Welding—special
09/11/2026Final—progress
Latest 25 of 56.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/16/2026Q01338258-I1Request digital key ↗
08/16/2026Q01338258-S1Request digital key ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/16/2026Q01338258-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026Q01338258-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/16/2026Q01338258-I1Open ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature6
10/04/2026Q01338258-S4Open ↗
10/04/2026Q01338258-S2Open ↗
10/04/2026Q01338258-S5Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
10/04/2026Q01338258-S4Open ↗
10/04/2026Q01338258-S2Open ↗
10/04/2026Q01338258-S5Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports8
▸DOB NOWTR4 Test Report and Plot Diagram3
10/04/2026Q01338258-S5Open ↗
10/04/2026Q01338258-S3Open ↗
08/16/2026Q01338258-I1Open ↗
▸DOB NOWSOIL REPORT3
10/04/2026Q01338258-S5Open ↗
10/04/2026Q01338258-S3Open ↗
08/16/2026Q01338258-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)2
10/04/2026Q01338258-S2Open ↗
10/04/2026Q01338258-S3Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026Q01338258-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/16/2026Q01338258-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026Q01338258-I1Open ↗