← Back
One family attached or semi-detached
144-27 68 AVENUE
QUEENS · Kew Gardens Hills · BIN 4141974
💬 Discuss this project
1950Year Built
2Stories
A5Building Class
R4Zoning
1,224 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,633 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar5p · 2 filings · 9 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/22/2019$700K—Private party → Private party$572/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BAZINI ENGINEERING, P.C.210/11/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAXWELL PLUMB MECH CORPGeneral Contractor107/08/2026
ALAFOGIANNIS PLBG & HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BAZINI ENGINEERING, P.C.1808110/11/2021
Building Lifecycle
All (10)Filed (2)Permit Issued (2)Signed Off (2)Violation (1)Inspection (3)
02/28/2022
Signed off — Alteration
INSTALL REPLACEMENT GAS FURNACE AS PER PLANS. INSTALL NEW GAS-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00434739-I1
02/28/2022
Signed off — Alteration
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT GAS-FIRED FURNACE. INSTALL NEW GAS-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00434747-I1
12/21/2021
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/08/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/28/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/19/2021
Permit issued — Mechanical Systems
Q00434739-I1-MS
10/12/2021
Permit issued — Plumbing
Q00434747-I1-PL
10/11/2021
Filed — Alteration
INSTALL REPLACEMENT GAS FURNACE AS PER PLANS. INSTALL NEW GAS-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00434739-I1
10/11/2021
Filed — Alteration
CONNECT TO EXISTING GAS PIPING FOR REPLACEMENT GAS-FIRED FURNACE. INSTALL NEW GAS-FIRED HOT WATER HEATER AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00434747-I1
10/16/1998
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMAXWELL PLUMB MECH CORP10/19/2021
DOB NOWPlumbingSigned-offALAFOGIANNIS PLBG & HTG10/12/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/21/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/08/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/28/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Plumbing1
08/27/2026Q00434747-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/27/2026Q00434739-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q00434747-I1Open ↗
08/13/2026Q00434739-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
08/13/2026Q00434739-I1Open ↗
08/13/2026Q00434747-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00434739-I1Open ↗
08/13/2026Q00434747-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00434739-I1Open ↗