Two family converted from one family
144-35 224 STREET
💬 Discuss this project
1925Year Built
2Stories
B3Building Class
R3-1Zoning
1,970 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 5,400 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbing
Floor 25p · 1 filing · 20 docs
Floor 114p · 2 filings · 20 docs
Cellar5p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIZA WORKS OF ARCHITECTURE PLLC405/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NIZA WORKS OF ARCHITECTURE803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FIRST WORLD DEVELOPMENTGeneral Contractor603/21/2026
NAS ELECTRIC CORPElectrical203/22/2026
ALL PRO PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CENTURY TESTING & CONSULT4081205/26/2023
NIZA WORKS OF ARCH PLLC6101405/26/2023
Building Lifecycle
All (42)Filed (4)Permit Issued (3)Signed Off (2)Violation (1)Inspection (2)Special Inspection (30)
09/08/2023
Signed off — Alteration
Residential renovation of an existing two-family house.. Consisting of a single story addition at the rear. New partitions and bathrooms at the interior of the new space. No change in use, occupancy or egress.
Q00631814-I1
07/11/2023
Signed off — Alteration
PLUMBING SCOPE FOR ALTERATION JOB NUMBER: Q00631814. NO CHANGE IN USE OCCUPANCY OR EGRESS.
Q00631826-I1
07/07/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/26/2023
Filed — Alteration
Residential renovation of an existing two-family house.. Consisting of a single story addition at the rear. New partitions and bathrooms at the interior of the new space. No change in use, occupancy or egress.
Q00631814-P1
05/26/2023
Filed — Alteration
PLUMBING SCOPE FOR ALTERATION JOB NUMBER: Q00631814. NO CHANGE IN USE OCCUPANCY OR EGRESS.
Q00631826-P1
05/26/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ALDO BRAVO
05/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Zapata
05/26/2023
Special inspection requirement — Mechanical Systems
Nicolas Zapata
05/26/2023
Special inspection requirement — Concrete - Cast-In-Place
Nicolas Zapata
05/26/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Soorjbally Harilall
05/26/2023
Special inspection requirement — Final
Nicolas Zapata
05/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Zapata
05/26/2023
Special inspection requirement — Structural Wood Frame
Nicolas Zapata
05/26/2023
Special inspection requirement — Footing and Foundation
Nicolas Zapata
05/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
Nicolas Zapata
05/26/2023
Special inspection requirement — Interior lighting power
Nicolas Zapata
05/26/2023
Special inspection requirement — Air barrier - visual inspection
Nicolas Zapata
05/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicolas Zapata
05/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
Nicolas Zapata
05/26/2023
Special inspection requirement — Exterior lighting power
Nicolas Zapata
05/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
Nicolas Zapata
05/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
ALDO BRAVO
05/26/2023
Special inspection requirement — Fenestration areas
Nicolas Zapata
05/26/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Nicolas Zapata
05/26/2023
Special inspection requirement — Insulation placement and R values
Nicolas Zapata
05/26/2023
Special inspection requirement — Fenestration air leakage
Nicolas Zapata
05/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Zapata
05/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Zapata
05/26/2023
Special inspection requirement — Subgrade Inspections
ALDO BRAVO
05/26/2023
Special inspection requirement — Masonry
Nicolas Zapata
03/01/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/17/2023
Special inspection requirement — Insulation placement and R values
Nicolas Zapata
02/17/2023
Special inspection requirement — Concrete - Cast-In-Place
Nicolas Zapata
02/17/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
ALDO BRAVO
02/17/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Zapata
02/17/2023
Special inspection requirement — Masonry
Nicolas Zapata
02/14/2023
Permit issued — Foundation
Q00631814-I1-GC-CX
02/09/2023
Permit issued — Plumbing
Q00631826-I1-PL
12/28/2022
Filed — Alteration
PLUMBING SCOPE FOR ALTERATION JOB NUMBER: Q00631814. NO CHANGE IN USE OCCUPANCY OR EGRESS.
Q00631826-I1
11/10/2022
Violation issued (ECB, closed)
Construction
10/26/2022
Permit issued — Mechanical Systems
Q00631814-I1-GC-CX
05/16/2022
Filed — Alteration
Residential renovation of an existing two-family house.. Consisting of a single story addition at the rear. New partitions and bathrooms at the interior of the new space. No change in use, occupancy or egress.
Q00631814-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offFIRST WORLD DEVELOPMENT02/14/2023
DOB NOWPlumbingSigned-offALL PRO PLBG & HTG INC02/09/2023
DOB NOWMechanical SystemsSigned-offFIRST WORLD DEVELOPMENT10/26/2022
BISOTISSUEDVENTURE HOME SOLAR LLC04/21/2017
BISOTISSUEDAMERGY SOLAR INC02/08/2017
BISPLISSUEDBEST PBG HTG & COOL INC03/09/2004
BIS—ISSUEDCONTRACTORS NETWORK02/27/2004
2 projects · most recent 03/14/2023
General Wiring Lighting
FiledStatusContractorScope
03/14/2023CompleteNAS ELECTRIC CORPGeneral Wiring
06/22/2022CompleteY.S ELECTRICGeneral Wiring, Lighting
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
07/07/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
05/26/2023Excavations - Sheeting, Shoring, and BracingALDO BRAVOspecial
05/26/2023Fire-Resistant Penetrations and JointsNicolas Zapataspecial
05/26/2023Mechanical SystemsNicolas Zapataspecial
05/26/2023Concrete - Cast-In-PlaceNicolas Zapataspecial
05/26/2023Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
05/26/2023FinalNicolas Zapataprogress
05/26/2023Energy Code Compliance InspectionsNicolas Zapataprogress
05/26/2023Structural Wood FrameNicolas Zapataprogress
05/26/2023Footing and FoundationNicolas Zapataprogress
05/26/2023Fire-Resistance Rated ConstructionNicolas Zapataprogress
05/26/2023Interior lighting powerNicolas Zapataenergy_progress
05/26/2023Air barrier - visual inspectionNicolas Zapataenergy_progress
05/26/2023HVAC-R and service water piping design and insulationNicolas Zapataenergy_progress
05/26/2023HVAC-R and service water heating system controlsNicolas Zapataenergy_progress
05/26/2023Exterior lighting powerNicolas Zapataenergy_progress
05/26/2023HVAC-R and service water heating equipmentNicolas Zapataenergy_progress
05/26/2023Structural Stability – Alterations of existing buildingsALDO BRAVOspecial
05/26/2023Fenestration areasNicolas Zapataenergy_progress
05/26/2023Fenestration and door U-factor and product ratingsNicolas Zapataenergy_progress
05/26/2023Insulation placement and R valuesNicolas Zapataenergy_progress
05/26/2023Fenestration air leakageNicolas Zapataenergy_progress
05/26/2023Fire-Resistant Penetrations and JointsNicolas Zapataspecial
05/26/2023Energy Code Compliance InspectionsNicolas Zapataprogress
05/26/2023Subgrade InspectionsALDO BRAVOspecial
05/26/2023MasonryNicolas Zapataspecial
Latest 25 of 48.
▾Documents — 70 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00631814-I1Request digital key ↗
08/26/2026Q00631814-P1Request digital key ↗
08/25/2026Q00631826-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
03/09/2018440381436Open ↗
05/15/2017440381436Open ↗
02/02/2017440381436Open ↗
▸BISWORK PERMIT APPLICATION2
05/04/2017440381436Open ↗
02/02/2017440381436Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00631814-P1Open ↗
08/13/2026Q00631814-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWSpecial Inspector Seal & Signature11
09/29/2026Q00631814-I1Open ↗
09/29/2026Q00631814-I1Open ↗
09/29/2026Q00631814-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/29/2026Q00631814-I1Open ↗
09/29/2026Q00631814-I1Open ↗
08/30/2026Q00631826-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/26/2026Q00631814-I1Open ↗
08/26/2026Q00631814-P1Open ↗
08/25/2026Q00631826-P1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/02/2017440381436Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/02/2017440381436Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
02/02/2017440381436Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
02/02/2017440381436Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/26/2026Q00631814-P1Open ↗
08/26/2026Q00631814-I1Open ↗
08/25/2026Q00631826-P1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
02/02/2017440381436Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
03/14/2018440381436Open ↗
02/02/2017440381436Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
02/02/2017440381436Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/14/2018440381436Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
03/14/2018440381436Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
02/02/2017440381436Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00631814-I1Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/14/2018440381436Open ↗
03/14/2018440381436Open ↗
02/02/2017440381436Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026Q00631814-P1Open ↗
08/13/2026Q00631814-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00631814-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00631814-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION2
05/15/2017440381436Open ↗
02/02/2017440381436Open ↗
▸BISSUPERSEDING LETTER1
05/04/2017440381436Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/14/2018440381436Open ↗
▸BISUtility Company PV System Interconnection Acknowledgement Letter1
02/06/2018440381436Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
03/14/2018440381436Open ↗
03/14/2018440381436Open ↗
02/02/2017440381436Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
03/09/2018440381436Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/02/2017440381436Open ↗
▸Other Documents6
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026Q00631814-I1Open ↗
08/13/2026Q00631814-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q00631814-I1Open ↗
08/13/2026Q00631814-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00631814-P1Open ↗
08/13/2026Q00631814-I1Open ↗