← Back
One family attached or semi-detached
144-41 MELBOURNE AVENUE
QUEENS · Kew Gardens Hills · BIN 4141905
💬 Discuss this project
1950Year Built
2Stories
A5Building Class
R4Zoning
1,744 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One family attached or semi-detached · 2,034 sf lot · 0.86 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/15/2020$861K—Private party → Private party$494/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC108/17/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROJECT ONE ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506108/17/2024
Building Lifecycle
All (28)Filed (1)Violation (3)Objection (6)Special Inspection (18)
01/08/2025
Violation issued (ECB, closed)
Construction
09/30/2024
Objection resolved — Resolved
09/30/2024
Objection resolved — Resolved
09/30/2024
Objection resolved — Resolved
09/12/2024
Violation issued (ECB, closed)
Unknown
09/05/2024
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
09/05/2024
Special inspection requirement — Air barrier - visual inspection
XIAOHONG ZHAO
09/05/2024
Special inspection requirement — Insulation placement and R values
XIAOHONG ZHAO
09/05/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
XIAOHONG ZHAO
09/05/2024
Special inspection requirement — Electric vehicle service equipment requirements
XIAOHONG ZHAO
09/05/2024
Special inspection requirement — Fenestration air leakage
XIAOHONG ZHAO
09/05/2024
Special inspection requirement — Metering
XIAOHONG ZHAO
09/05/2024
Special inspection requirement — Fenestration areas
XIAOHONG ZHAO
09/05/2024
Special inspection requirement — Permanent certificate
XIAOHONG ZHAO
09/05/2024
Special inspection requirement — Ventilation and air distribution system
XIAOHONG ZHAO
08/26/2024
Objection raised — Scope
08/26/2024
Objection raised — Zoning
08/26/2024
Objection raised — Zoning
08/17/2024
Filed — Alteration CO
INTERIOR RENOVATION FOR EXISTING ONE FAMILY AND CONVERT TO TWO FAMILY HOUSE. CONVERT EXISTING CELLAR TO BASEMENT. OBTAIN NEW C OF O.
Q01097351-I1
08/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
08/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
08/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
08/17/2024
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
08/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
08/17/2024
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
08/16/2024
Special inspection requirement — Final
XIAOHONG ZHAO
08/16/2024
Special inspection requirement — Mechanical Systems
XIAOHONG ZHAO
06/12/2024
Violation issued (ECB, closed)
Unknown
Nothing on file for this building.
1 project · most recent 08/17/2024
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/17/2024——Air Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric MUZ-FS09NA 9,000 BTU · Condensing Unit ×7
MUZ-FS15NA 15,000 BTU · Condensing Unit ×1
Heating
A.O. Smith XCG 50 400 40,000 BTU · Water Heater ×2
2 projects · most recent 05/14/2025
General Wiring
FiledStatusContractorScope
05/14/2025CompletePROJECT ONE ELECTRIC INCGeneral Wiring
04/03/2025CompletePROJECT ONE ELECTRIC INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
09/05/2024Interior lighting powerXIAOHONG ZHAOenergy_progress
09/05/2024Air barrier - visual inspectionXIAOHONG ZHAOenergy_progress
09/05/2024Insulation placement and R valuesXIAOHONG ZHAOenergy_progress
09/05/2024Fenestration and door U-factor and product ratingsXIAOHONG ZHAOenergy_progress
09/05/2024Electric vehicle service equipment requirementsXIAOHONG ZHAOenergy_progress
09/05/2024Fenestration air leakageXIAOHONG ZHAOenergy_progress
09/05/2024MeteringXIAOHONG ZHAOenergy_progress
09/05/2024Fenestration areasXIAOHONG ZHAOenergy_progress
09/05/2024Permanent certificateXIAOHONG ZHAOenergy_progress
09/05/2024Ventilation and air distribution systemXIAOHONG ZHAOenergy_progress
08/17/2024HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
08/17/2024HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
08/17/2024Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
08/17/2024Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
08/17/2024HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
08/17/2024Maintenance informationXIAOHONG ZHAOenergy_progress
08/16/2024FinalXIAOHONG ZHAOprogress
08/16/2024Mechanical SystemsXIAOHONG ZHAOspecial
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026Q01097351-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/27/2026Q01097351-I1Open ↗
08/27/2026Q01097351-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01097351-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/27/2026Q01097351-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/13/2026Q01097351-I1Open ↗