← Back
Large suburban residence
144-46 68 ROAD
QUEENS · BIN 4142038
💬 Discuss this project
2025Year Built
2.25Stories
A3Building Class
R4AZoning
4,446 sfGross Floor Area
1Units
2 Open Violations ▸FDNY Report ↗
Large suburban residence · 5,925 sf lot · 0.75 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Permit Issued — active, not yet Signed-off
Floor 2Under Construction84p · 1 filing · 20 docs
Floor 1Under Construction83p · 1 filing · 20 docs
CellarUnder Construction80p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MANDIDIAMONDS1809/13/2026
EMPIRE PROP PARTNERS LLC*303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MYLES ARCHITECTURE, P.C.703/17/2026
CHI F. LAU ARCHITECT, P.C.206/20/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING403/21/2026
MYLES ARCHITECTURE P C1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EMPIRE PROP PARTNERS LLC*General Contractor704/09/2026
JIN SUN CONSTRUCTION INCGeneral Contractor303/21/2026
JJK BUILDING CONSULTINGGeneral Contractor107/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JUST CONSULTING ENGINEERI5865403/17/2026
MYLES ARCHITECTURE, P.C.2938202/13/2026
Building Lifecycle
All (98)Filed (9)Permit Issued (8)Signed Off (2)Violation (3)Inspection (4)Objection (42)Special Inspection (30)
07/28/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/08/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/16/2026
Special inspection requirement — Metering
XIAOJUN WANG
04/16/2026
Special inspection requirement — Permanent certificate
XIAOJUN WANG
04/16/2026
Special inspection requirement — Air barrier — testing
XIAOJUN WANG
04/16/2026
Special inspection requirement — Air barrier - visual inspection
XIAOJUN WANG
04/16/2026
Special inspection requirement — Electric vehicle service equipment requirements
XIAOJUN WANG
04/16/2026
Special inspection requirement — Maintenance information
XIAOJUN WANG
04/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOJUN WANG
04/16/2026
Special inspection requirement — Final
CALVIN TRAN
04/16/2026
Special inspection requirement — Preliminary
XIAOJUN WANG
04/16/2026
Special inspection requirement — Footing and Foundation
XIAOJUN WANG
04/16/2026
Special inspection requirement — Interior lighting power
XIAOJUN WANG
04/16/2026
Special inspection requirement — Fenestration air leakage
XIAOJUN WANG
04/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOJUN WANG
04/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
XIAOJUN WANG
04/16/2026
Special inspection requirement — Mechanical Systems
XIAOJUN WANG
04/16/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIAOJUN WANG
04/16/2026
Special inspection requirement — Structural Steel - Details
XIAOJUN WANG
04/16/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
ELIAS RASABI
04/16/2026
Special inspection requirement — Structural Cold-Formed Steel
XIAOJUN WANG
04/16/2026
Special inspection requirement — Heating Systems
XIAOJUN WANG
04/16/2026
Special inspection requirement — Concrete - Cast-In-Place
XIAOJUN WANG
04/16/2026
Special inspection requirement — Masonry
XIAOJUN WANG
04/16/2026
Special inspection requirement — Ventilation and air distribution system
XIAOJUN WANG
04/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
XIAOJUN WANG
04/16/2026
Special inspection requirement — Insulation placement and R values
XIAOJUN WANG
04/16/2026
Special inspection requirement — Fenestration areas
XIAOJUN WANG
04/16/2026
Special inspection requirement — Protection of exposed foundation insulation
XIAOJUN WANG
04/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
XIAOJUN WANG
04/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
XIAOJUN WANG
04/15/2026
Objection resolved — Addressed
04/15/2026
Objection resolved — Addressed
04/10/2026
Objection raised — Zoning
04/10/2026
Objection raised — Zoning
04/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kyu Ho Lee
03/27/2026
Objection resolved — Addressed
03/25/2026
Objection raised — Other
03/17/2026
Filed — New Building
Construction Fence subsequent to a NB applicatoin. No change in use, egress or certificate of occupancy under this application.
Q00727918-P4
02/13/2026
Filed — New Building
Construction Fence subsequent to a NB applicatoin. No change in use, egress or certificate of occupancy under this application.
Q00727918-P3
12/08/2025
Permit issued — Plumbing
Q00727918-S1-PL
11/26/2025
Violation issued (ECB, open)
Construction
11/20/2025
Objection resolved — Addressed
11/13/2025
Permit issued — General Construction
Q00727918-I1-GC-CX
10/29/2025
Permit issued — Construction Fence
Q00727918-S3-FN
10/04/2025
Objection resolved — Addressed
09/30/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/16/2025
Objection raised — Energy
09/16/2025
Objection raised — Admin
09/16/2025
Objection raised — Scope
09/08/2025
Filed — New Building
Construction Fence subsequent to a NB applicatoin. No change in use, egress or certificate of occupancy under this application.
Q00727918-S3
09/08/2025
Filed — New Building
Construction Fence subsequent to a NB applicatoin. No change in use, egress or certificate of occupancy under this application.
Q00727918-S1
08/25/2025
Violation issued (ECB, closed)
Unknown
08/25/2025
Violation issued (ECB, open)
Unknown
08/18/2025
Objection raised — Other
08/11/2025
Objection resolved — Addressed
07/18/2025
Objection resolved — Addressed
Latest 60 of 98 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedROCK E SMALL PLBG&HTG INC12/08/2025
DOB NOWGeneral ConstructionPermit IssuedEMPIRE PROP PARTNERS LLC*11/13/2025
DOB NOWConstruction FencePermit IssuedEMPIRE PROP PARTNERS LLC*10/29/2025
DOB NOWFoundationPermit IssuedJIN L. LIN10/29/2024
DOB NOWMechanical SystemsPermit IssuedEMPIRE PROP PARTNERS LLC*10/29/2024
DOB NOWConstruction FenceSigned-offEMPIRE PROP PARTNERS LLC*10/25/2024
DOB NOWFull DemolitionSigned-offJJK BUILDING CONSULTING09/09/2024
DOB NOWConstruction FenceSigned-offEMPIRE PROP PARTNERS LLC*06/25/2024
1 job · most recent 03/17/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/17/2026Permit IssuedEMPIRE PROP PARTNERS LLC*Heating and Air Conditioning Systems
Heat / Cool
Fujitsu AOU45RLXFZ 4 tons · Heat Pump Outdoor ×6
York YH436E2S11 3 tons · Heat Pump Outdoor ×4
YH460E2S11 5 tons · Heat Pump Outdoor ×2
1 job · most recent 03/17/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/17/2026Permit IssuedROCK E SMALL PLBG&HTG INCGas, Storm, Water/Sanitary
1 job · most recent 10/14/2025
General Wiring
FiledStatusContractorScope
10/14/2025Permit IssuedKJK ELECTRIC INCGeneral Wiring
1 job · most recent 03/17/2026
Steel Concrete
FiledStatusContractorScope
03/17/2026Permit IssuedROCK E SMALL PLBG&HTG INCSteel, Concrete
1 job · most recent 03/17/2026
Fence
FiledStatusContractorScope
03/17/2026Permit IssuedROCK E SMALL PLBG&HTG INCFence
1 job · most recent 03/17/2026
Earthwork
FiledStatusContractorScope
03/17/2026Permit IssuedROCK E SMALL PLBG&HTG INCEarthwork
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/28/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/08/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/08/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 126
DateRequirementInspectorRole
04/16/2026Interior lighting powerXIAOJUN WANGenergy_progress
04/16/2026Excavations - Sheeting, Shoring, and BracingXIAOJUN WANGspecial
04/16/2026Mechanical SystemsXIAOJUN WANGspecial
04/16/2026Subsurface Investigations (Borings/Test Pits)ELIAS RASABIspecial
04/16/2026Structural Steel - DetailsXIAOJUN WANGspecial
04/16/2026Fire-Resistant Penetrations and JointsXIAOJUN WANGspecial
04/16/2026Heating SystemsXIAOJUN WANGspecial
04/16/2026Structural Cold-Formed SteelXIAOJUN WANGspecial
04/16/2026Concrete - Cast-In-PlaceXIAOJUN WANGspecial
04/16/2026MasonryXIAOJUN WANGspecial
04/16/2026Footing and FoundationXIAOJUN WANGprogress
04/16/2026PreliminaryXIAOJUN WANGprogress
04/16/2026FinalCALVIN TRANprogress
04/16/2026Fire-Resistance Rated ConstructionXIAOJUN WANGprogress
04/16/2026Ventilation and air distribution systemXIAOJUN WANGenergy_progress
04/16/2026Insulation placement and R valuesXIAOJUN WANGenergy_progress
04/16/2026Fenestration areasXIAOJUN WANGenergy_progress
04/16/2026Fenestration air leakageXIAOJUN WANGenergy_progress
04/16/2026Fenestration and door U-factor and product ratingsXIAOJUN WANGenergy_progress
04/16/2026Protection of exposed foundation insulationXIAOJUN WANGenergy_progress
04/16/2026HVAC-R and service water heating equipmentXIAOJUN WANGenergy_progress
04/16/2026HVAC-R and service water heating system controlsXIAOJUN WANGenergy_progress
04/16/2026HVAC-R and service water piping design and insulationXIAOJUN WANGenergy_progress
04/16/2026Electric vehicle service equipment requirementsXIAOJUN WANGenergy_progress
04/16/2026Air barrier — testing XIAOJUN WANGenergy_progress
Latest 25 of 126.
▾Documents — 93 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/22/2026Q01058416-I1Request digital key ↗
08/20/2026Q00727918-S3Request digital key ↗
08/20/2026Q00727918-P4Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records5
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q00727918-P1Open ↗
08/13/2026Q00727918-P2Open ↗
08/13/2026Q00727918-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00727918-I1Open ↗
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature14
09/16/2026Q00727918-P4Open ↗
09/16/2026Q00727918-P4Open ↗
09/16/2026Q00727918-P4Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/16/2026Q00727918-P4Open ↗
09/16/2026Q00727918-P4Open ↗
09/16/2026Q00727918-P4Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/22/2026Q01058416-I1Open ↗
08/20/2026Q00727918-P4Open ↗
08/20/2026Q00727918-P3Open ↗
Showing 3 of 9 on file for this type
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026Q00727918-P1Open ↗
08/13/2026Q00727918-P2Open ↗
08/13/2026Q00727918-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWWater Cut-Off1
08/13/2026Q01056115-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026Q01056115-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026Q01056115-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/13/2026Q01056115-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist4
08/13/2026Q00727918-P2Open ↗
08/13/2026Q00727918-P1Open ↗
08/13/2026Q00727918-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00727918-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00727918-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01056115-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026Q01056115-I1Open ↗
▸Inspections & Test Reports9
▸DOB NOWGeotechnical Report (BC 1803.6)4
08/13/2026Q00727918-P4Open ↗
08/13/2026Q00727918-I1Open ↗
08/13/2026Q00727918-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSOIL REPORT4
08/13/2026Q00727918-I1Open ↗
08/13/2026Q00727918-P2Open ↗
08/13/2026Q00727918-P4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00727918-I1Open ↗
▸Filing & Intake Forms2
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026Q00727918-P4Open ↗
08/16/2026Q00727918-P3Open ↗
▸Other Documents17
▸DOB NOWProperty Ownership Certification5
08/20/2026Q00727918-P4Open ↗
08/20/2026Q00727918-P1Open ↗
08/20/2026Q00727918-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026Q00727918-P1Open ↗
08/13/2026Q00727918-I1Open ↗
08/13/2026Q00727918-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026Q00727918-I1Open ↗
08/13/2026Q00727918-P4Open ↗
08/13/2026Q00727918-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStructure Photographs1
08/13/2026Q01056115-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00727918-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026Q01056115-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026Q01056115-I1Open ↗