← Back
Three families
144-52 72 ROAD
QUEENS · BIN 4144074
💬 Discuss this project
1960Year Built
3Stories
C0Building Class
R4Zoning
3,013 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · Owner of record: 15 MANAGEMENT LLC · 2,849 sf lot · 1.06 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Floor 32p · 2 filings · 20 docs
Floor 21p · 2 filings · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar4p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
15 MANAGEMENT LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/20/2021$1.3M—Private party → Private party$418/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SUNG HO SHIN ARCHITECT, PC701/12/2023
CNY ENGINEERING P.C305/25/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
E-GROUP INCGeneral Contractor307/08/2026
DYNAMIC PLBG & SPRKLR CORPlumbing207/08/2026
DYNAMIC PLBNG & SPRKR CORFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161001/12/2023
Building Lifecycle
All (85)Filed (10)Permit Issued (5)Signed Off (2)Violation (2)Inspection (10)Objection (26)Special Inspection (30)
07/20/2023
Permit issued — Mechanical Systems
Q00480000-I1-GC
07/19/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/26/2023
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
01/18/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
01/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/18/2023
Special inspection requirement — Final
FAHAD FATEH
01/18/2023
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
01/18/2023
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
01/18/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
01/18/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
01/18/2023
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
01/18/2023
Special inspection requirement — Fenestration areas
FAHAD FATEH
01/18/2023
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
01/12/2023
Filed — Alteration CO
NEW C/O AND CONVERSION OF EXISTING TWO FAMILY HOUSE INTO THREE FAMILY HOUSE
Q00480000-P5
08/16/2022
Filed — Alteration CO
NEW C/O AND CONVERSION OF EXISTING TWO FAMILY HOUSE INTO THREE FAMILY HOUSE
Q00480000-P4
08/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/16/2022
Special inspection requirement — Mechanical Systems
FAHAD FATEH
08/16/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
08/16/2022
Special inspection requirement — Final
FAHAD FATEH
08/16/2022
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
08/16/2022
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
08/16/2022
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
08/16/2022
Special inspection requirement — Fenestration areas
FAHAD FATEH
08/16/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
08/16/2022
Special inspection requirement — Maintenance information
FAHAD FATEH
08/16/2022
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
07/29/2022
Objection resolved — Addressed
07/27/2022
Objection raised — Other
07/22/2022
Filed — Alteration CO
NEW C/O AND CONVERSION OF EXISTING TWO FAMILY HOUSE INTO THREE FAMILY HOUSE
Q00480000-P3
06/29/2022
Permit issued — Mechanical Systems
Q00480000-I1-MS
06/07/2022
Signed off — Alteration
INSTALL NEW SPRINKLER SYSTEM FOR 3-STORY BUILDING IN CONJUNCTION WITH DOB NOW JOB#Q00480000.NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q00520233-I1
06/01/2022
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
06/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/25/2022
Filed — Alteration
INSTALL NEW SPRINKLER SYSTEM FOR 3-STORY BUILDING IN CONJUNCTION WITH DOB NOW JOB#Q00480000.NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q00520233-P2
05/12/2022
Signed off — Alteration
CONVERSION FROM TWO INTO THREE DWELLING UNITS WITH NEW C OF O.
Q00576458-I1
04/18/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/14/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/08/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/30/2022
Filed — Alteration
INSTALL NEW SPRINKLER SYSTEM FOR 3-STORY BUILDING IN CONJUNCTION WITH DOB NOW JOB#Q00480000.NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q00520233-P1
03/18/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/18/2022
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
03/02/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/10/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/10/2022
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/10/2022
Special inspection requirement — Maintenance information
FAHAD FATEH
02/10/2022
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
02/08/2022
Filed — Alteration
CONVERSION FROM TWO INTO THREE DWELLING UNITS WITH NEW C OF O.
Q00576458-P1
02/03/2022
Filed — Alteration CO
NEW C/O AND CONVERSION OF EXISTING TWO FAMILY HOUSE INTO THREE FAMILY HOUSE
Q00480000-P1
10/08/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/08/2021
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/08/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/08/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/03/2021
Permit issued — Sprinklers
Q00520233-I1-EW-SP
09/03/2021
Permit issued — Plumbing
Q00520233-I1-PL
09/02/2021
Permit issued — Plumbing
Q00576458-I1-PL
08/27/2021
Filed — Alteration
CONVERSION FROM TWO INTO THREE DWELLING UNITS WITH NEW C OF O.
Q00576458-I1
08/23/2021
Filed — Alteration
INSTALL NEW SPRINKLER SYSTEM FOR 3-STORY BUILDING IN CONJUNCTION WITH DOB NOW JOB#Q00480000.NO CHANGE IN USE,EGRESS AND OCCUPANCY.
Q00520233-I1
08/09/2021
Objection raised — Scope
08/09/2021
Objection resolved — Addressed
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedE-GROUP INC07/20/2023
DOB NOWMechanical SystemsSigned-offE-GROUP INC06/29/2022
DOB NOWSprinklersSigned-offCITYWIDE PLBG, HTG &SPRKL09/03/2021
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS09/03/2021
DOB NOWPlumbingSigned-offCITYWIDE PLBG HTG & SPKLS09/02/2021
1 project · most recent 01/12/2023
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/12/2023Permit IssuedE-GROUP INCAir Conditioning Systems
Cooling
Mitsubishi Electric Cont.Certification Number for Listing:16E02334, 16E49441, Model#:MSZ-FH09NA 9,000 BTU · Fan Coil Indoor ×18
Cont.Certification Number for Listing: 16E01660, Model#: MSZ-FH06NA 6,000 BTU · Fan Coil Indoor ×15
MSZ-FH12NA 12,000 BTU · Fan Coil Indoor ×16
MXZ-4C36NA 36,000 BTU · Condensing Unit ×8
MXZ-3C24NAHZ2 24,000 BTU · Condensing Unit ×4
MXZ-4C36NA2-U1 36,000 BTU · Condensing Unit ×4
MSZ-FH09NA 9,000 BTU · Fan Coil Indoor ×6
MSZ-FH06NA 6,000 BTU · Fan Coil Indoor ×5
1 project · most recent 08/27/2021
General Wiring
FiledStatusContractorScope
08/27/2021CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
07/19/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/26/2023Fail-Final CND-Occupancy InspectionFailView ↗
04/18/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/08/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/02/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/08/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/08/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/08/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/08/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
01/18/2023Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
01/18/2023Mechanical SystemsFAHAD FATEHspecial
01/18/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/18/2023FinalFAHAD FATEHprogress
01/18/2023Fenestration air leakageFAHAD FATEHenergy_progress
01/18/2023Insulation placement and R valuesFAHAD FATEHenergy_progress
01/18/2023Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
01/18/2023Maintenance informationFAHAD FATEHenergy_progress
01/18/2023Air barrier - visual inspectionFAHAD FATEHenergy_progress
01/18/2023Fenestration areasFAHAD FATEHenergy_progress
01/18/2023Lighting in dwelling unitsFAHAD FATEHenergy_progress
08/16/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/16/2022Mechanical SystemsFAHAD FATEHspecial
08/16/2022Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
08/16/2022FinalFAHAD FATEHprogress
08/16/2022Air barrier - visual inspectionFAHAD FATEHenergy_progress
08/16/2022Insulation placement and R valuesFAHAD FATEHenergy_progress
08/16/2022Lighting in dwelling unitsFAHAD FATEHenergy_progress
08/16/2022Fenestration areasFAHAD FATEHenergy_progress
08/16/2022Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
08/16/2022Maintenance informationFAHAD FATEHenergy_progress
08/16/2022Fenestration air leakageFAHAD FATEHenergy_progress
06/01/2022Sprinkler SystemsFAHAD FATEHspecial
06/01/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/18/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
Latest 25 of 49.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/27/2026Q00576458-I1Request digital key ↗
08/27/2026Q00576458-P1Request digital key ↗
08/26/2026Q00520233-P2Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00480000-I1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026Q00520233-I1Open ↗
08/26/2026Q00520233-P1Open ↗
08/13/2026Q00480000-P3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
09/17/2026Q00480000-P4Open ↗
09/17/2026Q00480000-P4Open ↗
09/01/2026Q00480000-P1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/23/2026Q00520233-I1Open ↗
09/17/2026Q00480000-P4Open ↗
09/01/2026Q00520233-P1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist5
08/13/2026Q00480000-P5Open ↗
08/13/2026Q00480000-P4Open ↗
08/13/2026Q00480000-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00480000-I1Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
08/26/2026Q00520233-P1Open ↗
08/26/2026Q00520233-I1Open ↗
08/13/2026Q00520233-P2Open ↗
Showing 3 of 10 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00480000-I1Open ↗
08/13/2026Q00576458-I1Open ↗
▸Other Documents1
▸DOB NOWFinal Survey1
08/13/2026Q00480000-I1Open ↗