← Back
BuildNYC
Elevator cooperative
Sanford Plaza
144-54 SANFORD AVENUE · BIN 4594900
💬 Discuss this project
1952Year Built
6Stories
D4Building Class
R6AZoning
173,358 sfGross Floor Area
180Units
LL97 CoveredRent Stabilized0 Active ViolationsFISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: Sanford Plaza Apartment · 84,525 sf lot · 2.05 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 12 filings · 11 docs
Site & exteriorSanford Plaza Apartment CORP13p · 2 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sanford Plaza Apartment1103/22/2026
Center203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Anurag Upadhyay P.E.307/06/2023
Thomas C Tung P.E.202/22/2023
Royal T&E110/25/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM Arch1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Triera ContractingScaffold507/08/2026
Jit Construction CompanyGeneral Contractor303/21/2026
Texeira ElectricElectrical103/22/2026
Futura Builders GroupGeneral Contractor103/21/2026
Europa General ContractingGeneral Contractor107/26/2019
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CL Engineering6781207/06/2023
NKM Engineering6244112/16/2022
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 8, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 8 filing on record yet
06/25/2026
Elevator Category 1 inspection report filed
06/16/2026
Co-op apartment 38 sold for $220,000
02/13/2026
§ 27-2005 ADM CODE PROVIDE SECURITY IN AN EVENT OF A POWER OUTTAGE BY MEANS OF A HEAVY DUTY LOCK AND LATCH SET AT VESTIBULE DOOR TO PUBLIC HALL ,…
HPD violation · closed
02/13/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT…
HPD violation · closed
280 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJit Construction Company06/14/2023
DOB NOWSidewalk ShedSigned-offTriera Contracting06/28/2018
DOB NOWSidewalk ShedSigned-offTriera Contracting03/09/2018
DOB NOWSidewalk ShedSigned-offTriera Contracting11/01/2017
BISOTISSUEDEuropa General Contracting07/26/2019
BISOTISSUEDFutura Builders Group02/23/2018
1 project · most recent 02/22/2023
Gas Water/Sanitary
FiledStatusContractorScope
02/22/2023——Gas, Water/Sanitary
5 projects · most recent 05/10/2026
General Wiring Boiler Controls
FiledStatusContractorScope
05/10/2026Permit IssuedReliant Power SystemsGeneral Wiring
03/24/2026Permit IssuedSTX ElectricalBoiler Controls
05/16/2023Permit IssuedReliant Power SystemsGeneral Wiring
10/14/2021CompleteHY-Lee ElectricGeneral Wiring
04/16/2021Permit IssuedTexeira ElectricBoiler Controls
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/14/2023Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
07/06/2023Tenant Protection Plan Compliance—special
07/06/2023Concrete - Cast-In-PlaceCHRISTIAN LOZADAspecial
02/22/2023Maintenance information—energy_progress
02/22/2023HVAC-R and service water piping design and insulation—energy_progress
01/03/2023Tenant Protection Plan Compliance—special
12/28/2022Lighting in dwelling units—energy_progress
12/28/2022Fire-Resistance Rated Construction—progress
12/28/2022Lighting in dwelling units—energy_progress
12/28/2022Interior lighting power—energy_progress
12/28/2022Metering—energy_progress
12/28/2022Lighting controls—energy_progress
12/28/2022Interior lighting power—energy_progress
12/28/2022Metering—energy_progress
12/28/2022Lighting controls—energy_progress
12/28/2022Fire-Resistant Penetrations and Joints—special
12/28/2022Energy Code Compliance Inspections—progress
10/25/2021Metering—energy_progress
10/25/2021Maintenance information—energy_progress
10/25/2021Energy Code Compliance Inspections—progress
10/25/2021Fire-Resistance Rated Construction—progress
10/25/2021Fire-Resistant Penetrations and Joints—special
61 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account